FORD FLTM BO 115-2-2001 RESISTANCE OF PLASTICS TO ARTIFICIAL WEATHERING (Replaces FLTM BO 015-02 FLTM EU-BO 015-02).pdf

上传人:confusegate185 文档编号:747355 上传时间:2019-01-14 格式:PDF 页数:2 大小:30.43KB
下载 相关 举报
FORD FLTM BO 115-2-2001 RESISTANCE OF PLASTICS TO ARTIFICIAL WEATHERING (Replaces FLTM BO 015-02 FLTM EU-BO 015-02).pdf_第1页
第1页 / 共2页
FORD FLTM BO 115-2-2001 RESISTANCE OF PLASTICS TO ARTIFICIAL WEATHERING (Replaces FLTM BO 015-02 FLTM EU-BO 015-02).pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD BO 115-02 Date Action Revisions 2001 03 28 Revised Editorial no technical change A. Cockman 1994 02 28 Printed copies are uncontrolled Page 1 of 2 Copyright 2001, Ford Global Technologies, Inc. RESISTANCE OF PLASTICS TO ARTIFICIAL WEATHERING Application This procedure is

2、 used to test the resistance of molded plastic parts to artificial weathering by exposure to ultraviolet energy, salt spray, heat and humidity. Apparatus Required Fluorescent Sunlamp Cabinet* A modified oven equipped with four Westinghouse FS 20T-12 fluorescent sunlamps is required. Oven* Approximat

3、e internal dimensions, 700 mm wide, 600 mm deep, 500 mm high, and capable of maintaining a temperature of 60 +/- 2 C. A Grieves-Hendry oven, Model PL-1 is suitable. Sunlamp Fixture* To be completely installed in the cabinet. 20 gauge steel box with screw cover. One 20 watt high power factor ballast

4、for each two lamps. Four fluorescent starter assemblies. Cover - 20 gauge steel with Alzak aluminum reflector overlay. Four pairs fluorescent lamp holders. Four Westinghouse FS 20T-2 fluorescent sunlamps. *The complete Fluorescent Sunlamp Cabinet is available from: Infra Corporation 5454 Dixie Highw

5、ay Waterford, MI 48095 U.S.A. Telephone: 810/623-0400 Humidity Cabinet The humidity cabinet must be maintained at 38 +/- 2 C and a relative humidity of 98 +/- 2 %. The moist air must be circulated in the cabinet by a fan or other suitable means. Test specimens must be suitably supported and arranged

6、 in the test cabinet so that no water can drip from one specimen onto another. FORD LABORATORY TEST METHOD BO 115-02 Page 2 of 2 Copyright 2001, Ford Global Technologies, Inc. Salt Spray Cabinet The salt spray cabinet and operating conditions must meet the requirements of ASTM B 117. Exterior Plasti

7、c Parts Expose exterior parts to five continuous cycles as detailed below. Interior Plastic Parts Expose interior parts to three continuous cycles as detailed below. Note: The number of cycles indicated must be used unless otherwise specified by the relevant Engineering Specification or drawing. Cyc

8、ling Test Each single cycle consists of the following: a) 4 hours in the fluorescent sunlamp cabinet. The test specimens must be 30 cm from the lamps. b) 4 hours in the salt spray cabinet. c) 16 hours in the humidity cabinet. Evaluation Examine and report any changes in appearance or other physical

9、properties occurring as a result of this test as required by the relevant Engineering Specification or drawing. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities.

展开阅读全文
相关资源
猜你喜欢
  • ETSI TS 132 277-2018 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Proximity-based Services (ProSe) charging (V15 1 0 3GPP _1.pdf ETSI TS 132 277-2018 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Proximity-based Services (ProSe) charging (V15 1 0 3GPP _1.pdf
  • ETSI TS 132 278-2016 LTE Telecommunication management Charging management Monitoring Event Charging (V13 0 0 3GPP TS 32 278 version 13 0 0 Release 13)《长期演进技术(LTE) 通信管理 计费管理 监控事件计费(.pdf ETSI TS 132 278-2016 LTE Telecommunication management Charging management Monitoring Event Charging (V13 0 0 3GPP TS 32 278 version 13 0 0 Release 13)《长期演进技术(LTE) 通信管理 计费管理 监控事件计费(.pdf
  • ETSI TS 132 278-2017 LTE Telecommunication management Charging management Monitoring event charging (V14 0 0 3GPP TS 32 278 version 14 0 0 Release 14)《长期演进技术(LTE) 通信管理 计费管理 监控事件计费(.pdf ETSI TS 132 278-2017 LTE Telecommunication management Charging management Monitoring event charging (V14 0 0 3GPP TS 32 278 version 14 0 0 Release 14)《长期演进技术(LTE) 通信管理 计费管理 监控事件计费(.pdf
  • ETSI TS 132 278-2018 LTE Telecommunication management Charging management Monitoring event charging (V15 0 0 3GPP TS 32 278 version 15 0 0 Release 15).pdf ETSI TS 132 278-2018 LTE Telecommunication management Charging management Monitoring event charging (V15 0 0 3GPP TS 32 278 version 15 0 0 Release 15).pdf
  • ETSI TS 132 280-2016 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Advice of Charge (AoC) service (V13 0 0 3GPP TS 32 280 v.pdf ETSI TS 132 280-2016 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Advice of Charge (AoC) service (V13 0 0 3GPP TS 32 280 v.pdf
  • ETSI TS 132 280-2017 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Advice of Charge (AoC) service (V14 0 0 3GPP TS 32 280 v.pdf ETSI TS 132 280-2017 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Advice of Charge (AoC) service (V14 0 0 3GPP TS 32 280 v.pdf
  • ETSI TS 132 280-2018 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Advice of Charge (AoC) service (V15 0 0 3GPP TS 32 280 v.pdf ETSI TS 132 280-2018 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Advice of Charge (AoC) service (V15 0 0 3GPP TS 32 280 v.pdf
  • ETSI TS 132 281-2016 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Announcement service (V13 0 0 3GPP TS 32 281 version 13 .pdf ETSI TS 132 281-2016 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Announcement service (V13 0 0 3GPP TS 32 281 version 13 .pdf
  • ETSI TS 132 281-2017 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Announcement service (V14 0 0 3GPP TS 32 281 version 14 .pdf ETSI TS 132 281-2017 Universal Mobile Telecommunications System (UMTS) LTE Telecommunication management Charging management Announcement service (V14 0 0 3GPP TS 32 281 version 14 .pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1