FORD FLTM BO 160-4-2004 RESISTANCE OF PAINTED PLASTIC PARTS TO HIGH PRESSURE CLEANING OPERATIONS.pdf

上传人:proposalcash356 文档编号:747397 上传时间:2019-01-14 格式:PDF 页数:2 大小:62.57KB
下载 相关 举报
FORD FLTM BO 160-4-2004 RESISTANCE OF PAINTED PLASTIC PARTS TO HIGH PRESSURE CLEANING OPERATIONS.pdf_第1页
第1页 / 共2页
FORD FLTM BO 160-4-2004 RESISTANCE OF PAINTED PLASTIC PARTS TO HIGH PRESSURE CLEANING OPERATIONS.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHODBO 160-04Date Action Revisions 2004 01 30 Revised Revised the settings and procedure section A. Weakly 2001 04 10 Revised Editorial no technical change A. Cockman 1992 01 22 Printed copies are uncontrolled Copyright 2004, Ford Global Technologies, LLC Page 1 of 2 RESISTAN

2、CE OF PAINTED PLASTIC PARTS TO HIGH PRESSURE CLEANING OPERATIONS Application This procedure defines the test equipment and test method for the resistance of painted plastic parts (e.g., bumper bars, mirror housings, radiator grills) against high pressure cleaning processes. Equipment Required High P

3、ressure Cleaning Equipment: Cleemax serial 1053 Source: Pearson Panke Equipment Ltd, 1-3, Hale Grove Gardens, London NW7 3LR Great Britain. Or equivalent instrument suitable to provide the required temperature, pressure and flow rate of water, with a fixed or moving head. Jet type QVVA 2506 Source S

4、praying Systems Company See the website http:/ for the local agent. Or equivalent. Scriber type: See FLTM BI 106-1 Settings Method A, fixed jet: Jet position Perpendicular to specimen Water temperature, 70 C +/- 2 C Distance of nozzle to specimen 50mm +/-3mm Water pressure, 3000 +/-50 kPa Testing ti

5、me 60 seconds, +/- 3 seconds Water flow rate 420 litres/hour minimum FORD LABORATORY TEST METHODBO 160-04Printed copies are uncontrolled Copyright 2004, Ford Global Technologies, LLC Page 2 of 2 Method B, moving jet. Jet position Perpendicular to specimen Water Temperature 80 C +/- 4 C Distance of n

6、ozzle to specimen 100 mm +/-3mm Water pressure, 6000 +/-50 kPa Moving range 30mm +/- 10 mm from center, total traverse 60mm Moving cycle 60 cycle/minute Moving direction parallel to the X scribe on the specimen Jet position Perpendicular to specimen (The lines of the X scribe are Northeast to Southw

7、est. The longer axis of the spray fan pattern is East-West, and the direction of movement is North-South.) Testing time 120 seconds, +/-3 seconds Water flow rate 610 litres/hour minimum Note: The water pressure and water temperature settings must be measured immediately behind the nozzle. Conditioni

8、ng and Test Conditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 C and 50 +/- 5% relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified. Procedure 1. The equipment is fi

9、lled with water without any additional cleaning agents and heated. 2. Before testing the equipment must be adjusted to the required test pressure for the specified distance. 3 Scribe the panel with an X scribe, over the whole area to be exposed to the water jet. 4. The gun with the nozzle is fixed t

10、o the required distance from the nozzle to the painted surface which is to be tested. The jet of water has to be directed vertically onto the painted surface. 5. Spray water for the specified length of time. 6. The surface is dried and evaluated after cooling to 23 +/- 2 C. 7. Report any failure (e.g., loss of gloss, loss of adhesion, surface deterioration). The principal failure mode is paint peeling. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities.

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 61334-4-32-1997 Distribution automation using distribution line carrier systems - Part 4 Data communication protocols section 32 Data link layer logical link control (LLC) (.pdf DIN EN 61334-4-32-1997 Distribution automation using distribution line carrier systems - Part 4 Data communication protocols section 32 Data link layer logical link control (LLC) (.pdf
  • DIN EN 61334-4-33-1999 Distribution automation using distribution line carrier systems - Part 4-33 Data communication protocols data link layer connection oriented protocol (IEC 61.pdf DIN EN 61334-4-33-1999 Distribution automation using distribution line carrier systems - Part 4-33 Data communication protocols data link layer connection oriented protocol (IEC 61.pdf
  • DIN EN 61334-4-41-1997 Distribution automation using distribution line carrier systems - Part 4 Data communication protocols Section 41 Application protocols Distribution line mess.pdf DIN EN 61334-4-41-1997 Distribution automation using distribution line carrier systems - Part 4 Data communication protocols Section 41 Application protocols Distribution line mess.pdf
  • DIN EN 61334-4-42-1997 Distribution automation using distribution line carrier systems - Part 4 Data communication protocols Section 42 Application protocols Application layer (IEC.pdf DIN EN 61334-4-42-1997 Distribution automation using distribution line carrier systems - Part 4 Data communication protocols Section 42 Application protocols Application layer (IEC.pdf
  • DIN EN 61334-4-511-2001 Distribution automation using distribution line carrier systems - Part 4-511 Data communication protocols Systems management CIASE protocol (IEC 61334-4-511.pdf DIN EN 61334-4-511-2001 Distribution automation using distribution line carrier systems - Part 4-511 Data communication protocols Systems management CIASE protocol (IEC 61334-4-511.pdf
  • DIN EN 61334-4-512-2002 Distribution automation using distribution line carrier systems - Part 4-512 Data communication protocols System management using profile IEC 61334-5-1 Mana.pdf DIN EN 61334-4-512-2002 Distribution automation using distribution line carrier systems - Part 4-512 Data communication protocols System management using profile IEC 61334-5-1 Mana.pdf
  • DIN EN 61334-4-61-1999 Distribution automation using distribution line carrier systems - Part 4-61 Data communication protocols network layer connectionless protocol (IEC 61334-4-6.pdf DIN EN 61334-4-61-1999 Distribution automation using distribution line carrier systems - Part 4-61 Data communication protocols network layer connectionless protocol (IEC 61334-4-6.pdf
  • DIN EN 61334-5-1-2001 Distribution automation using distribution line carrier systems - Part 5-1 Lower layer profiles The spread frequency shift keying (S-FSK) profile (IEC 61334-5.pdf DIN EN 61334-5-1-2001 Distribution automation using distribution line carrier systems - Part 5-1 Lower layer profiles The spread frequency shift keying (S-FSK) profile (IEC 61334-5.pdf
  • DIN EN 61334-6-2001 Distribution automation using distribution line carrier systems - Part 6 A-XDR encoding rule (IEC 61334-6 2000) German version EN 61334-6 2000 text in English《利.pdf DIN EN 61334-6-2001 Distribution automation using distribution line carrier systems - Part 6 A-XDR encoding rule (IEC 61334-6 2000) German version EN 61334-6 2000 text in English《利.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1