FORD FLTM EU-BV 055-06-2000 COLD IMPACT RESISTANCE OF MULTI-PLY DEADENER PADS《多层隔音垫的耐冷冲击性》.pdf

上传人:刘芸 文档编号:747875 上传时间:2019-01-14 格式:PDF 页数:3 大小:31.98KB
下载 相关 举报
FORD FLTM EU-BV 055-06-2000 COLD IMPACT RESISTANCE OF MULTI-PLY DEADENER PADS《多层隔音垫的耐冷冲击性》.pdf_第1页
第1页 / 共3页
FORD FLTM EU-BV 055-06-2000 COLD IMPACT RESISTANCE OF MULTI-PLY DEADENER PADS《多层隔音垫的耐冷冲击性》.pdf_第2页
第2页 / 共3页
FORD FLTM EU-BV 055-06-2000 COLD IMPACT RESISTANCE OF MULTI-PLY DEADENER PADS《多层隔音垫的耐冷冲击性》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD EU-BV 055-06 Date Action Revisions 2000 11 14 Revised Editorial no technical change A. Cockman 1994 02 28 Printed copies are uncontrolled Page 1 of 3 Copyright 2000, Ford Global Technologies, Inc. COLD IMPACT RESISTANCE OF MULTI-PLY DEADENER PADS Application This procedu

2、re is used to determine the impact resistance of multi-ply deadener pads at low temperature. Apparatus Required Test Panels Steel body skin panels: Each panel has 4 tongues as shown in drawing. Dimensions: 300 x 300 x 0.9 +/- 0.05 mm Load A 300 x 300 x 1.5 +/- 0.1 mm Load B Surface Finish: 45 - 65 m

3、icroinches C.L.A. Punching Die See drawing for dimensions of punched slots. Impact Test Fixture As specified in FLTM EU-BV 051-01. Cold Box Capable of maintaining a temperature of - 40 +/- 2 C. The box must be large enough to accommodate the fixture during the slamming test. Conditioning and Test Co

4、nditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 C and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified. FORD LABORATORY TEST METHOD EU-BV 055-06 Page

5、 2 of 3 Copyright 2000, Ford Global Technologies, Inc. Procedure 1. Cut at least 2 samples 280 x 300 mm and punch 4 slotted holes in each as shown in sketch. 2. Slot the sample of the test material on to the 4 tongues of the test panel and secure by bending over the ends of the 4 tongues. The sample

6、 must be firmly held without compressing the material. 3. Insert a specimen in the clamping device of the impact test fixture (with the deadener side outermost). Remove the load (part 5) and balance the specimen by means of the adjustable counterweight (part 3). 4. Attach load “A“ or “B“, as require

7、d, to the lever (part 4) and fix at a distance of 300 mm from the pivot centre. 5. Place the specimen and impact test fixture in the cold box for a minimum of 3 h at - 40 +/- 2 C. 6. While still in the cold box allow the lever to fall 6 times in rapid succession from a horizontal position. 7. Remove

8、 specimen from cold box and allow it to attain 23 +/- 2 C. Evaluation Examine the test specimen and determine: 1. The degree of delamination of the multi-ply deadener pad. 2. The extent by which the multi-ply deadener pad has broken loose from the tongues of the test panel. Chemicals, materials, par

9、ts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities. FORD LABORATORY TEST METHOD EU-BV 055-06 Page 3 of 3 Copyright 2000, Ford Global Technologies, Inc. COLD IMPACT RESISTANCE OF MULTI-PLY DEADENER PADS

展开阅读全文
相关资源
猜你喜欢
  • BS EN 12839-2012 Precast concrete products Elements for fences《预制混凝土产品 栏栅用构件》.pdf BS EN 12839-2012 Precast concrete products Elements for fences《预制混凝土产品 栏栅用构件》.pdf
  • BS EN 12841-2006 Personal fall protection equipment - Rope access systems - Rope adjustment devices《个人防跌落设备 绳索通道系统 绳索调整设备》.pdf BS EN 12841-2006 Personal fall protection equipment - Rope access systems - Rope adjustment devices《个人防跌落设备 绳索通道系统 绳索调整设备》.pdf
  • BS EN 12843-2004 Precast concrete products - Masts and poles《预制混凝土制品 电线杆》.pdf BS EN 12843-2004 Precast concrete products - Masts and poles《预制混凝土制品 电线杆》.pdf
  • BS EN 12845-2015 Fixed firefighting systems Automatic sprinkler systems Design installation and maintenance《固定式消防系统 自动喷水系统 设计 安装和维修》.pdf BS EN 12845-2015 Fixed firefighting systems Automatic sprinkler systems Design installation and maintenance《固定式消防系统 自动喷水系统 设计 安装和维修》.pdf
  • BS EN 12846-1-2011 Bitumen and bituminous binders Determination of efflux time by the efflux viscometer Bituminous emulsions《沥青和沥青粘合剂 用射流粘度计测定沥青乳液流动时间 沥青乳化液》.pdf BS EN 12846-1-2011 Bitumen and bituminous binders Determination of efflux time by the efflux viscometer Bituminous emulsions《沥青和沥青粘合剂 用射流粘度计测定沥青乳液流动时间 沥青乳化液》.pdf
  • BS EN 12846-2-2011 Bitumen and bituminous binders Determination of efflux time by the efflux viscometer Cut-back and fluxed bituminous binders《沥青和沥青粘合剂 用流出粘度计测定沥青乳液流出时间 稀释沥青或助溶沥青粘合.pdf BS EN 12846-2-2011 Bitumen and bituminous binders Determination of efflux time by the efflux viscometer Cut-back and fluxed bituminous binders《沥青和沥青粘合剂 用流出粘度计测定沥青乳液流出时间 稀释沥青或助溶沥青粘合.pdf
  • BS EN 12847-2009 Bitumen and bituminous binders - Determination of settling tendency of bituminous emulsions《沥青和沥青胶粘剂 测定沥青乳液的沉降倾向》.pdf BS EN 12847-2009 Bitumen and bituminous binders - Determination of settling tendency of bituminous emulsions《沥青和沥青胶粘剂 测定沥青乳液的沉降倾向》.pdf
  • BS EN 12848-2009 Bitumen and bituminous binders - Determination of mixing stability with cement of bituminous emulsions《沥青和沥青粘合剂 沥青乳化液与水泥的混合稳定性的测定》.pdf BS EN 12848-2009 Bitumen and bituminous binders - Determination of mixing stability with cement of bituminous emulsions《沥青和沥青粘合剂 沥青乳化液与水泥的混合稳定性的测定》.pdf
  • BS EN 12849-2009 Bitumen and bituminous binders - Determination of penetration power of bituminous emulsions《沥青和沥青粘合剂 沥青乳化液穿透力的测定》.pdf BS EN 12849-2009 Bitumen and bituminous binders - Determination of penetration power of bituminous emulsions《沥青和沥青粘合剂 沥青乳化液穿透力的测定》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1