FORD FLTM EU-BZ 052-2-2001 TESTS FOR CLEANLINESS OF FUEL SYSTEM COMPONENTS.pdf

上传人:花仙子 文档编号:747884 上传时间:2019-01-14 格式:PDF 页数:3 大小:32.54KB
下载 相关 举报
FORD FLTM EU-BZ 052-2-2001 TESTS FOR CLEANLINESS OF FUEL SYSTEM COMPONENTS.pdf_第1页
第1页 / 共3页
FORD FLTM EU-BZ 052-2-2001 TESTS FOR CLEANLINESS OF FUEL SYSTEM COMPONENTS.pdf_第2页
第2页 / 共3页
FORD FLTM EU-BZ 052-2-2001 TESTS FOR CLEANLINESS OF FUEL SYSTEM COMPONENTS.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD EU-BZ 052-02 Date Action Revisions 2001 04 30 Revised Editorial no technical change A. Cockman 1994 02 28 Printed copies are uncontrolled Page 1 of 3 Copyright 2001, Ford Global Technologies, Inc. TESTS FOR CLEANLINESS OF FUEL SYSTEM COMPONENTS Application This procedure

2、 describes the tests used to determine the amount and type of foreign materials in fuel lines, pumps, rails and carburetors. Apparatus Required Fume extraction hood Ultrasonic cleaning bath - dimensions to suit fuel rails-nominal 300 x 200 x 350 (1xwzd) mm. Analytical balance - accuracy +/- 0.1 mg.

3、Soft bristle brush Membrane filter system e.g. Millipore, Whatman, Gelman. Filters - 5 micrometre membrane. Microscope with low power and photographic facility. Solvent Required Trichloroethane or n-Haptane Note: 1. Chlorinated solvents may attack rubber diaphragms. 2. Observe appropriate health, sa

4、fety and fire precautions. FORD LABORATORY TEST METHOD EU-BZ 052-02 Page 2 of 3 Copyright 2001, Ford Global Technologies, Inc. Conditioning and Test Conditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 C and 50 +/- 5 % relative humidity

5、 for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified. Procedure Fuel Lines 1. Rinse the inside of the fuel line with a wash bottle containing the solvent into a beaker until the washings are clean. 2. Filter the total washings through a preweighted

6、 5 micrometre membrane filter, dry and reweigh. Record the weight of retained debris in mg. 3. Report as total solid material. Fuel Pumps and Carburetors 1. Wash off exterior part of assembly with solvent and discard washings. 2. Disassemble and wash all interior surfaces of pump or carburetor which

7、 normally contact fuel. Use the solvent and wash bottle as described under fuel lines. Remove all chips, burrs and shavings from walls and passages and combine with solid material. 3. Filter the total washings through a preweighted 5 micrometre membrane filter, dry and reweigh. Record the weight of

8、retained debris in mg. 4. Report as total solid material. Fuel Rails 1. Cap all openings in the fuel rail after filling with solvent. Note: Avoid air pockets in the rail. 2. Place the rail vertically in the ultrasonic bath with an orientation such that restrictions liable to trap debris on draining

9、the rail are kept to a minimum and at least 1 opening is at the lowest point of the rail. 3. Switch on and operate ultrasonic bath for 20 minutes. FORD LABORATORY TEST METHOD EU-BZ 052-02 Page 3 of 3 Copyright 2001, Ford Global Technologies, Inc. 4. Remove the rail and dry the outside surface while

10、maintaining the orientation of the rail. 5. Drain and retain the solvent from the lowest point of the rail and flush twice by filling the rail from the top with solvent. Collect all washings. 6. Filter the total washings through a preweighted 5 micrometre membrane filter, dry and reweigh. Record the

11、 weight of retained debris in mg. Identification of Solid Material Examine the retained debris under a microscope at approximately 10X magnification and identify material such as weld spatter (steel), solder (non-ferrous), sand, fibers, rubber, plastics, etc. Photograph retained debris at 10X to show the type of material and to estimate the proportion of each. Photograph at 40X to measure particle size. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities.

展开阅读全文
相关资源
猜你喜欢
  • AECMA PREN 3079-1999 Aerospace Series Pipe Coupling 8 Degree 30' Up to 28 000 kPa Adaptors Metric Series Technical Specification Edition P 1《航空航天系列管连接件8°30′ 直到 28000 kPa 异形接头米制系列 技.pdf AECMA PREN 3079-1999 Aerospace Series Pipe Coupling 8 Degree 30' Up to 28 000 kPa Adaptors Metric Series Technical Specification Edition P 1《航空航天系列管连接件8°30′ 直到 28000 kPa 异形接头米制系列 技.pdf
  • AECMA PREN 3080-2000 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Tees Reduced Branch with Thrust Wire Nut Edition P 1《航空航天系列钛合金管连接件8°30′带可靠金属丝螺母的异形分支三通管》.pdf AECMA PREN 3080-2000 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Tees Reduced Branch with Thrust Wire Nut Edition P 1《航空航天系列钛合金管连接件8°30′带可靠金属丝螺母的异形分支三通管》.pdf
  • AECMA PREN 3081-1997 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Ferrules Welded with Dynamic Beam Seal End for Repair Edition P 1《航空航天系列钛合金瘔和焊接连接件8°30′带动态密封可靠金属.pdf AECMA PREN 3081-1997 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Ferrules Welded with Dynamic Beam Seal End for Repair Edition P 1《航空航天系列钛合金瘔和焊接连接件8°30′带动态密封可靠金属.pdf
  • AECMA PREN 3082-1997 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Bulkhead with Weld End for Repair Edition P 1《航空航天系列钛合金连接件8°30′带焊接缝用于重修.P1版》.pdf AECMA PREN 3082-1997 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Bulkhead with Weld End for Repair Edition P 1《航空航天系列钛合金连接件8°30′带焊接缝用于重修.P1版》.pdf
  • AECMA PREN 3083-1997 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Bulkhead Long Welded for Repair Edition P 1《航空航天系列钛合金连接件8°30′带焊接缝用于重修.P1版》.pdf AECMA PREN 3083-1997 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Bulkhead Long Welded for Repair Edition P 1《航空航天系列钛合金连接件8°30′带焊接缝用于重修.P1版》.pdf
  • AECMA PREN 3084-1997 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Long Welded for Repair Edition P 1《航空航天系列钛合金连接件8°30′长焊接用于重修.P1版》.pdf AECMA PREN 3084-1997 Aerospace Series Pipe Coupling 8 Degrees 30' in Titanium Alloy Unions Long Welded for Repair Edition P 1《航空航天系列钛合金连接件8°30′长焊接用于重修.P1版》.pdf
  • AECMA PREN 3086-1998 Aerospace Series Hose Assemblies Designation Limited to 15 Digits Edition P 1《航空航天系列.软管系统 符号表示到15位》.pdf AECMA PREN 3086-1998 Aerospace Series Hose Assemblies Designation Limited to 15 Digits Edition P 1《航空航天系列.软管系统 符号表示到15位》.pdf
  • AECMA PREN 3094-1989 Aerospace Series Sealants Test Method Determination of Application Time《航空航天系列作业时间密封试验方法》.pdf AECMA PREN 3094-1989 Aerospace Series Sealants Test Method Determination of Application Time《航空航天系列作业时间密封试验方法》.pdf
  • AECMA PREN 3094-1995 Aerospace Series Sealants Test Method Determination of Application Time Edition P 1《航空航天系列作业时间密封试验方法.P1版》.pdf AECMA PREN 3094-1995 Aerospace Series Sealants Test Method Determination of Application Time Edition P 1《航空航天系列作业时间密封试验方法.P1版》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1