1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 0 2011 08 23 Activated M. Dumitrescu, FNA Controlled document at www.MATS Copyright 2011, Ford Global Technologies, Inc. Page 1 of 2 FABRIC, JAVA PATTERN, WOVEN WRS-M1H1221-A 36 % PIR RECYCLED CONTENT 1. SCOPE The material defined by thi
2、s specification is a JAVA pattern, flat woven. The fabric is made with 36% Post Industrial recycled yarns. 2. APPLICATION This specification was released originally for material used as an interior trim fabric for D471 2013 seat insert. The fabric is back-coated. 3. REQUIREMENTS In addition, to the
3、requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-A1/A4 as applicable. The fabric must be backcoated. 3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WS
4、S-M99P1111-A). This specification contains 36% recycled content as defined by WRS-M99P42-A2. The remaining portion of the material can come from virgin sources. 3.2 FABRIC CONSTRUCTION 3.2.1 Fabric Count, +/- 5% tolerance (ASTM D 3775) Warp 325 ends/10 cm Fill 200 picks/10 cm 3.2.2 Fabric Weight (FL
5、TM BN 106-01) Face fabric, +/- 10% tolerance 300 g/m2 Backcoat,+/- 15% tolerance 42 g/m2 3.3 COMPOSITION (ASTM D 629) Tolerance as specified in WSS-M8P18-A1/A4 Fabric 100% Polyester Backcoating Acrylic ENGINEERING MATERIAL SPECIFICATION WRS-M1H1221-A Controlled document at www.MATS Copyright 2011, F
6、ord Global Technologies, Inc. Page 2 of 2 3.4 YARN CONSTRUCTION (ASTM D 1244) Warp 540 dtex f144 (polyester false twisted yarn) Fill 540 dtex f144 (100% PIR polyester textured yarn) 3.5 METHOD OF DYEING Piece dye - Solution dye 3.6 FINISHING OPERATIONS Wash, heat set, backcoat 4. GENERAL INFORMATION
7、 This information given below is provided for clarification and assistance in meeting the requirements of this specification. Contact for questions concerning Engineering Material Specifications 4.1 Purchase departments will ensure that the material defined in this specification and shipped to any one assembly plant will be produced by one supplier only.