1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev 00 2011 10 07 Activated M. Dumitrescu, NA Controlled document at www.MATS Copyright 2011, Ford Global Technologies, LLC Page 1 of 2 FABRIC, CARBONITE PATTERN, CIRCULAR KNIT WRS-M1H1235-A1 18% PIR LAMINATED, EMBOSSED 1. SCOPE The material
2、defined by this specification is a warp knit polyester face fabric, laminated with foam and scrim and roller embossed with Carbonite pattern. The fabric is made with 18% PIR (post industrial) recycled yarn 2. APPLICATION This specification was released originally for material used as an interior tri
3、m fabric for P415 FX4 2013 seat insert. The fabric was originally approved as Tri-laminated with foam and backing fabric/scrim. 3. REQUIREMENTS In addition to the requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-A1/A2/A3/A4 as applicable. 3.1 STANDARD REQUIREMENTS FOR
4、PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.1.1 Recycled Content This specification must contain 18% recycled content as defined by WRS-M99P42-A2 (Textile Materials, Identification of Recyc
5、led Content). The remaining portion of the material can come from virgin sources. 3.2 FABRIC CONSTRUCTION 3.2.1 Fabric Count, +10 % tolerance (ASTM D 3775) Wales 102 / 10 cm Courses 90 / 10 cm 3.2.2 Fabric Weight, +10 % tolerance 350 g/m2 (FLTM BN 106-01) 3.3 COMPOSITION (ASTM D 629) Fabric 100% pol
6、yester 3.4 YARN CONSTRUCTION (ASTM D 1244) Face 167 dtex f72 (polyester texturized yarn) x 2 ENGINEERING MATERIAL SPECIFICATION WRS-M1H1235-A1 Copyright 2011, Ford Global Technologies, LLC Page 2 of 2 Back 167 dtex f36 (100% polyester PIR texturized yarn) x 1 3.5 METHOD OF DYEING Piece Dyed or as ap
7、proved by Materials Engineering 3.6 FINISHED OPERATIONS Dye, tenter, heatset, inspect, laminated, embossed, inspect, Or as approved by Materials Engineering 4. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. Contact for questions concerning Engineering Material Specifications. 4.1 Purchase departments will ensure that the material defined in this specification and shipped to any one assembly plant will be produced by one supplier only.