FORD WSB-M11P28-B-2014 ADHESION REQUIREMENTS ADHESIVE FOR BONDING LAMP ASSEMBLIES TO BE USED WITH FORD WSS-M99P1111-A .pdf

上传人:roleaisle130 文档编号:748864 上传时间:2019-01-14 格式:PDF 页数:5 大小:49.81KB
下载 相关 举报
FORD WSB-M11P28-B-2014 ADHESION REQUIREMENTS ADHESIVE FOR BONDING LAMP ASSEMBLIES  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第1页
第1页 / 共5页
FORD WSB-M11P28-B-2014 ADHESION REQUIREMENTS ADHESIVE FOR BONDING LAMP ASSEMBLIES  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第2页
第2页 / 共5页
FORD WSB-M11P28-B-2014 ADHESION REQUIREMENTS ADHESIVE FOR BONDING LAMP ASSEMBLIES  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第3页
第3页 / 共5页
FORD WSB-M11P28-B-2014 ADHESION REQUIREMENTS ADHESIVE FOR BONDING LAMP ASSEMBLIES  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第4页
第4页 / 共5页
FORD WSB-M11P28-B-2014 ADHESION REQUIREMENTS ADHESIVE FOR BONDING LAMP ASSEMBLIES  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2014 01 07 N Status Replace with WSS-M11P28-D R. Harris, NA 2002 08 19 Revised Rev para 3.2.3, updated & renumbered L. Graham 1996 11 04 Revised Added B2, Revised para 2,3.1 W. Curtiss, M. Myers 1992 01 13 N

2、B00E10181048000 W. Curtiss, E. Rezendes Page 1 of 5 Copyright 2014, Ford Global Technologies, Inc. ADHESION REQUIREMENTS, ADHESIVE FOR BONDING WSB-M11P28-B LAMP ASSEMBLIES ADHESION REQUIREMENTS, ADHESIVE FOR BONDING WSS-M11P28-B2 VENTED LAMP ASSEMBLIES NOT TO BE USED FOR NEW DESIGN 1. SCOPE These sp

3、ecifications define the performance requirements for an adhesive or adhesive system suitable for bonding headlamps, rear lamps, or other lamps of varying substrates. 2. APPLICATION WSB-M11P28-B: This specification was released originally for an adhesive or an adhesive system used to bond lenses to b

4、odies in construction of vented and non-vented lamp assemblies. WSS-M11P28-B2: This specification was released originally for an adhesive or an adhesive system used to bond lenses to bodies in the construction of vented lamp assemblies only. Use of this specification in non-vented headlamp assembly

5、applications is not recommended. Mechanical attachments may be required depending on the lamp design. If mechanical attachments are required, it shall be noted on the assembly drawing. Materials meeting these performance specifications are identified on the Corporate Approved Source List along with

6、specific substrates for each lamp design. Compliance with these performance specifications does not guarantee the adhesive or adhesive system will function for all potential applications on a vehicle. The specific design condition must be evaluated prior to release of these materials. 3. REQUIREMENT

7、S 3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.2 ADHESION STRENGTH - TONGUE AND GROOVE WSB-M11P28-B - Minimum load specified or substrate breakage greater than

8、400 N WSS-M11P28-B2 - Minimum load specified and cohesive failure ENGINEERING MATERIAL SPECIFICATION WSB-M11P28-B WSS-M11P28-B2 Page 2 of 5 Copyright 2014, Ford Global Technologies, Inc. WSB-M11P28-B WSS-M11P28-B2 Normal (Condition for 30 minutes at specified temperature prior to test) 3.2.1 Test at

9、 23 +/- 2 C 900 N 140 N 3.2.2 Test at 82 +/- 2 C 400 N 50 N (Test at 107 +/- 2 C for headlamps only) 3.2.3 Test at - 30 +/- 1 C 1000 N 200 N Conduct Environmental Aging (In accordance with 3.2.4 3.2.9 after aging condition for 24 h 23 +/- 2 C) 3.2.4 14 days heat age at 88 +/- 2 C 1000 N 140 N 3.2.5

10、14 days humidity 1000 N 140 N (38 +/- 1 C and 95 100 % R.H.) 3.2.6 14 days water immersion 900 N 140 N at 32 +/- 1 C 3.2.7 500 h salt spray described 900 N 140 N per ASTM B 117 3.2.8 500 h ultraviolet light 1000 N 140 N (Equipment described in FLTM BV 107-02 or as agreed upon by the responsible engi

11、neering activity.) 3.2.9 10 thermal cycles: 1000 N 140 N 4 h at 88 +/- 2 C 4 h at - 30 +/- 1 C, and 16 h humidity (38 +/- 1 C and 95 - 100 % R.H.) ENGINEERING MATERIAL SPECIFICATION WSB-M11P28-B WSS-M11P28-B2 Page 3 of 5 Copyright 2014, Ford Global Technologies, Inc. Test Method: . The tongue and gr

12、oove plaques shall consist of materials molded by an approved source as recommended by Body Engineering. . Clean the surfaces to be bonded with a hot, soapy water solution. The soap shall be free-rinsing, similar to that used for glassware. After cleaning, the plaques are blown dry and aged at 23 +/

13、- 2 C for 24 h to insure dryness. . Dispense an adequate amount of adhesive into the groove plaque. After the appropriate open time for the adhesive being tested, the tongue is inserted into the adhesive filled groove. Remove any excess adhesive. Maintain proper alignment of the assemblies during cu

14、re. Cure the assemblies as indicated by the adhesive manufacturer. . Test the assemblies at a crosshead speed of 12.7 mm/minute. Note: Proper alignment of the test assembly is critical. Every effort should be made to maintain uniform tension across the bond area. Cleavage and/or peel of the bond are

15、a could yield inaccurate results. . Evaluate a minimum of three assemblies per condition. Report failure mode and peak load in newtons. 3.3 CREEP RESISTANCE (WSB-M11P28-B only) No slippage (ASTM D 1780, prepare test samples per para 3.2, apply a 4.5 kg dead weight load to test samples and expose to

16、88 +/- 2 C for 24 h) ENGINEERING MATERIAL SPECIFICATION WSB-M11P28-B WSS-M11P28-B2 Page 4 of 5 Copyright 2014, Ford Global Technologies, Inc. 3.4 COLD SLAM RESISTANCE No cracking, adhesive (FLTM BV 101-02, 10 cycles of 6 slams or cohesive failure per cycle at - 30 +/- 1 C, 3 samples min) . Prepare t

17、est assemblies as illustrated in Figure 1. Test substrates shall consist of 100 x 250 mm panels identified in para 4.1. Cure bonded assemblies as indicated by the adhesive manufacturer. . Mechanically attach bonded test assembly to a 0.76 x 300 x 300 mm CRS base panel. Centrally locate test assembly

18、 on base panel. . Conduct test as outlined per FLTM BV 101-02 following steps 9, 10 and 11. Position panel in slam fixture with reinforcement facing inward. Subject each test assembly to 10 cycles of six slams per cycle at - 30 +/- 1 C. 3.5 LAMP PERFORMANCE REQUIREMENTS Parts assembled with adhesive

19、 shall meet all engineering requirements specified by Design Engineering and as indicated on the appropriate prints. 3.6 FUNCTIONAL APPROVAL Materials being evaluated for approval to this specification shall be subjected to a production trial. Functional trial results must be approved by the affecte

20、d assembly operation and Design Engineering. Results shall be made available to Materials Engineering prior to material approval and release. 4. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. 4.1 SUBSTRA

21、TES Substrates as specified by Design and Materials Engineering activities. 4.2 CURE SCHEDULES Cure schedules as specified by the Adhesive Manufacturer. ENGINEERING MATERIAL SPECIFICATION WSB-M11P28-B WSS-M11P28-B2 Page 5 of 5 Copyright 2014, Ford Global Technologies, Inc. COLD SLAM TEST ASSEMBLY Figure 1

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1