FORD WSD-M6H40-A-2000 CORD POLYESTER《聚酯线》.pdf

上传人:outsidejudge265 文档编号:749948 上传时间:2019-01-14 格式:PDF 页数:3 大小:27.94KB
下载 相关 举报
FORD WSD-M6H40-A-2000 CORD POLYESTER《聚酯线》.pdf_第1页
第1页 / 共3页
FORD WSD-M6H40-A-2000 CORD POLYESTER《聚酯线》.pdf_第2页
第2页 / 共3页
FORD WSD-M6H40-A-2000 CORD POLYESTER《聚酯线》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2000 03 03 Activated J. Willi ams Page 1 of 3 CORD, POLYESTER WSD - M6H40 - A 1. SCOPE The material defined by this specification is a plaited polyester cord. 2. APPLICATION This specification was released o

2、riginally for materials used as a rear package tray lifting strap. 3. REQUIREMENTS In addition to the requirements listed herein all materials must meet any additional requirements quoted in the Package Tray Performance Specification, WSS - M15P6 - D. Alternative compositions and constructions may b

3、e used providing that they meet: A) Design Appearance requirements. B) Component Engineering functional and feasibility requirements. C) Material performance requirements quoted in this specification. 3.1 QUALITY SYSTEM REQUIREMENTS Material suppliers and part producers must conform to Quality Syst

4、em Requirements, QS - 9000. Material specification requirements are to be used for initial qualification of materials. A Control Plan for ongoing production verification is required. This plan must be reviewed and approved by the relevant Ford Materials activity and/or Ford Supplier Technical Assist

5、ance (STA) prior to production parts submission. Appropriate statistical tools must be used to analyze process/product data and assure consistent processing of the materials. Part producers using this material in their products, must use Ford approved materials and must conform to a process control

6、plan which has been approved by STA and/or the relevant Materials Activity. 3.2 INFRARED SPECTROPHOTOMETRY AND/OR THERMAL ANALYSIS Ford Motor Company, at its option, may conduct infrared and/or thermal analysis of material/parts supplied to this specification. The IR spectra and thermograms establis

7、hed for initial approval shall constitute the reference standard and shall be kept on file at the designated material laboratory. All samples shall produce IR spectra and thermograms that correspond to the reference standard when tested under the same conditions. ENGINEERING MATERIAL SPECIFICATION W

8、SD - M6H40 - A Page 2 of 3 3.3 CONDITIONING AND TEST CONDITIONS All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/ - 2 C and 50 +/ - 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise

9、 specified. 3. 4 APPEARANCE (FLTM BI 109 - 01) Colour, pattern and finish shall me et the requirements of the Design Department. 3.5 DIAMETER, min 1.5mm 3.6 COMPOSTION 100% Polyester (ASTM D276) High Tenacity 3.7 TENSILE STRENGTH, min 500 N (ASTM D 204, Test Speed: 125mm/minute) 3.8 ULTRAVIOLET DETE

10、RIORATION (SAE J1885) 3.8.1 Retained Tensile Strength, min (FLTM BN 117 - 03, Method A) 225.6kJ/m2 70% 3.9 RESISTANCE TO FADE, min (SAE J1885, ISO 105 - A02/ AATCC Evaluation Procedure 1) 225.6 kJ/m2 Rating 4 488.8 kJ/m2 Rating 3 3.10 RESISTANCE TO RUBBING (CROCKING) (FLTM BN 107 - 0 1) Dry Rating 5

11、 Wet Rating 5 3.11 FASTNESS TO WATER Rating 5 (FLTM AN 101 - 01) 3.12 ODOUR, max Rating 2 (FLTM BO 131 - 01) 3.13 FOGGING (SAE J1756, 3 h at 100 C heating, 21 C cooling plate, post test conditioning 1 h) Fog Number, min 70 Formation of clear film, droplets or crystals is cause for rejection. ENGINEE

12、RING MATERIAL SPECIFICATION WSD - M6H40 - A Page 3 of 3 3.14 RESISTANCE TO MILDEW The material shall exhibit no visible evidence of mildew growth and/or objectionable odor after 7 d exposure in a humidity cabi net maintained at 98 +/ - 2 % relative humidity and 38 +/ - 2 C. 3.15 FLAMMABILITY (SAE J3

13、69/ISO 3795) Burn Rate, max 100 mm/minute 3 .16 ADDITIONAL REQUIREMENTS Specific requirements for material and/or manufactured parts shall be specified on the Engineering drawing, Engineering parts specification and/or performance specification. All critical areas with respect to these properties sh

14、all be clearly designated on the engineering drawing. 3.17 SUPPLIERS RESPONSIBILITY All materials supplied to this specification must be equivalent in all characteristics to the material upon which approval was originally granted. Prior to making any change in the properties, composition, constructi

15、on, color, processing or labeling of the material originally approved under this specification, whether or not such changes affect the materials ability to meet the specification requirements, the Supplier shall notify Purchasing, Toxicology and the affected Materials Engineering activity of the pro

16、posed ch anges and obtain the written approval of the Materials Engineering activity. Test data, test samples and a new code identification are to be submitted with the request. Substance restrictions imposed by law, regulations or Ford, apply to the materials addressed by this document. The regulat

17、ions are defined in Engineering Materials Specification WSS - M99P9999 - A1. 4 . APPROVAL OF MATERIALS Materials defined by this specification must have prior approval by the responsible Materials Engineering activity. Suppliers desiring approval of their materials shall first obtain an expression o

18、f interest from the affected Purchasing, Design and Materials Engineering activity. Upon request, the Supplier shall submit to the affected Materials Engineering activity a completed copy of their laboratory test reports, signed by a qualified and authorized representative of the test facility, demo

19、nstrating full compliance with all the requirements of this specification (test results, not nominal values), the material designa tion and code number, and test specimens for Ford evaluation. Ford engineering approval of a material will be based on its performance to this specification and on an assessment of suitability for intended processes and/or applications. Upon approval, the material will be added to the Engineering Material Approved Source List.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1