FORD WSK-M7C80-A2-2015 RUST PREVENTIVE WAX SOLVENT BASED UNDERBODY PROTECTION HIGH SOLID CONTENT TO BE USED WITH FORD WSS-M99P1111-A .pdf

上传人:吴艺期 文档编号:751002 上传时间:2019-01-14 格式:PDF 页数:5 大小:57.64KB
下载 相关 举报
FORD WSK-M7C80-A2-2015 RUST PREVENTIVE WAX SOLVENT BASED UNDERBODY PROTECTION HIGH SOLID CONTENT  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第1页
第1页 / 共5页
FORD WSK-M7C80-A2-2015 RUST PREVENTIVE WAX SOLVENT BASED UNDERBODY PROTECTION HIGH SOLID CONTENT  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第2页
第2页 / 共5页
FORD WSK-M7C80-A2-2015 RUST PREVENTIVE WAX SOLVENT BASED UNDERBODY PROTECTION HIGH SOLID CONTENT  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第3页
第3页 / 共5页
FORD WSK-M7C80-A2-2015 RUST PREVENTIVE WAX SOLVENT BASED UNDERBODY PROTECTION HIGH SOLID CONTENT  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第4页
第4页 / 共5页
FORD WSK-M7C80-A2-2015 RUST PREVENTIVE WAX SOLVENT BASED UNDERBODY PROTECTION HIGH SOLID CONTENT  TO BE USED WITH FORD WSS-M99P1111-A  .pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Ver 5 2015 01 30 A2 N Status A2 no future usage or replacement U. Mueller, EU 2008 04 11 Activated Added WSS-M7C80-A4; Revised 3.5.1, 3.5.2, 3.5.4, 3.6.3, 3.6.4 3.6.5, 3.7.1, 3.8.4, 3.8.5; Deleted 3.4 no blisters, no slipping of the wax or an

2、y damages of the film allowed. Light re-emulsification may be accepted if reversible within 24 h after test end. 3.8.4 Resistance Against High Temperature no flow (1 h at 80 +/- 2 C) Test Method: Spray wax to one half of an electrocoated test panel. Mark the edge and place the panel vertically in a

3、convection oven, wax side up. Evaluation for flow after 1 hour. 3.8.5 Resistance Against Low Temperature -30 C (ASTM D 522, Method B) Test Method: Prepare test panels with 40 - 50 and 70 - 80 micrometer film thickness and place them in a cold box for 24 h, together with a mandrel of 30 mm diameter.

4、While in the cold box, bend the panels 180 C over the mandrel. Evaluation: No cracking or chipping allowed. ENGINEERING MATERIAL SPECIFICATION WSK-M7C80-A2 WSK-M7C80-A4 Copyright 2015, Ford Global Technologies, LLC Page 4 of 5 3.9 INFLUENCE ON PAINTED SURFACES Substrates: Ford Standard steel panels

5、and plastic panels or actual production parts, painted with current production as well as repair top coats; white and silver metallic. Test Method: Spray wax on one half of each specimen and place them for 16 h in an oven at 45 +/- 2 C. After test end remove the wax with a cloth and a suitable solve

6、nt per para 3.7.4. Evaluation: The wax must not strain, soften, lift, or otherwise degrade current production or repair paint materials. 3.10 STAINING OF UNPAINTED PLASTIC BUMPER MATERIAL (only if applicable) Substrates: Samples from white and dark grey current production bumper material. Test Metho

7、d: Spray wax on one half of each specimen and place them for 16 h in an oven at 45 +/- 2 C. After test end remove the wax with a cloth and a suitable solvent per para 3.7.4. Evaluation: The wax must not stain, soften, or otherwise degrade the plastic substrate. 3.11 INFLUENCE ON UNDERBODY STONE CHIP

8、 PROTECTION MATERIAL (ASTM D 968) Substrates: Prepare electrocoated test panels with current production stone chip protection material for the underbody application and film build as required in the relevant material specification. Test Method: Spray wax on one half of the specimens and age them for

9、 7 days at 23 +/- 2 C. Perform abrasion tests as required in the specification of the stone chip coating material. After test end remove the wax with a cloth and a suitable solvent per para 3.7.4. Evaluation: The wax under investigation shall not deteriorate the resistance of stone chip protection u

10、nderbody coatings. ENGINEERING MATERIAL SPECIFICATION WSK-M7C80-A2 WSK-M7C80-A4 Copyright 2015, Ford Global Technologies, LLC Page 5 of 5 3.12 INFLUENCE ON PLASTIC AND RUBBER ASSEMBLY PARTS Substrates: Specimens of rubber or plastic parts placed in the spraying area during application such as: brake

11、 hose, fuel line or heater hose. Test Method: Spray wax onto the test specimens and age for 7 days at 23 +/- 2 C. After test end wipe off the test compound with a cloth and a suitable solvent per para 3.7.4. Compare volume and hardness of the test specimens with untreated parts. Evaluation: The mate

12、rial under test shall not deteriorate properties of rubber or plastic assembly parts. 5. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of these specifications. 5.1 MATERIAL REFERENCE All related materials used for approval of wax according to this specification, e.g. substrate materials, paint materials, solvents, etc. as well as the application parameter shall be noted in the Initial Sample Report of the wax.

展开阅读全文
相关资源
猜你喜欢
  • DIN 69901-2-2009 Project management - Project management systems - Part 2 Processes process model《项目管理 项目管理系统 第2部分 过程模型》.pdf DIN 69901-2-2009 Project management - Project management systems - Part 2 Processes process model《项目管理 项目管理系统 第2部分 过程模型》.pdf
  • DIN 69901-3-2009 Project management - Project management systems - Part 3 Methods《项目管理 项目管理系统 第3部分 方法》.pdf DIN 69901-3-2009 Project management - Project management systems - Part 3 Methods《项目管理 项目管理系统 第3部分 方法》.pdf
  • DIN 69901-4-2009 Project management - Project management systems - Part 4 Data data model《项目管理 项目管理系统 第4部分 数据模型》.pdf DIN 69901-4-2009 Project management - Project management systems - Part 4 Data data model《项目管理 项目管理系统 第4部分 数据模型》.pdf
  • DIN 69901-5-2009 Project management - Project management systems - Part 5 Concepts《项目管理 项目管理系统 第5部分 概念》.pdf DIN 69901-5-2009 Project management - Project management systems - Part 5 Concepts《项目管理 项目管理系统 第5部分 概念》.pdf
  • DIN 69909-1-2013 Multi Project Management - Management of project portfolios programmes and projects - Part 1 Fundamentals《多项目管理 项目组合管理 计划和项目 第1部分 基本原理》.pdf DIN 69909-1-2013 Multi Project Management - Management of project portfolios programmes and projects - Part 1 Fundamentals《多项目管理 项目组合管理 计划和项目 第1部分 基本原理》.pdf
  • DIN 69909-2-2013 Multi-Project Management - Management of project portfolios programmes and projects - Part 2 Processes process model《多项目管理 组合 计划和项目管理 第2部分 流程 流程模式》.pdf DIN 69909-2-2013 Multi-Project Management - Management of project portfolios programmes and projects - Part 2 Processes process model《多项目管理 组合 计划和项目管理 第2部分 流程 流程模式》.pdf
  • DIN 69909-3-2015 Multi-Project Management - Management of project portfolios programmes and projects - Part 3 Methods《多项目管理 组合 计划和项目管理 第3部分 方法》.pdf DIN 69909-3-2015 Multi-Project Management - Management of project portfolios programmes and projects - Part 3 Methods《多项目管理 组合 计划和项目管理 第3部分 方法》.pdf
  • DIN 69909-4-2015 Multi-Project Management - Management of project portfolios programmes and projects - Part 4 Roles《多项目管理 组合 计划和项目管理 第4部分 角色》.pdf DIN 69909-4-2015 Multi-Project Management - Management of project portfolios programmes and projects - Part 4 Roles《多项目管理 组合 计划和项目管理 第4部分 角色》.pdf
  • DIN 70003-1993 Vibrational stress measurement of parameters on vehicle parts《振动应力 车辆零部件参数的测量》.pdf DIN 70003-1993 Vibrational stress measurement of parameters on vehicle parts《振动应力 车辆零部件参数的测量》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1