1、 ENGINEERING MATERIAL SPECIFICATIONDate Action Revisions Rev. 2 2010 01 20 N-STATUS Replaced by WSS-M1H1016-B2 M. Dumitrescu, NA 2009 08 20 Revised Revised 3.6; Added 4 & 4.1 M. Dumitrescu, NA 2008 08 19 Activated M. Dumitrescu Printed copies are uncontrolled Copyright 2010, Ford Global Technologies
2、, LLC Page 1 of 2 FABRIC, SPECK S PATTERN, KNIT WSS-M1H1016-A2 MIN 25% PIR CONTENT NOT TO BE USED FOR NEW DESIGN 1. SCOPE The material defined by this specification is a SPECK S PATTERN, 4 bars, 28 Gauge, TRICOT knit, body cloth of good quality and uniform composition. 2. APPLICATION This specificat
3、ion was released originally for material used as an interior trim fabric for 2007 P356 seat bolster. 3. REQUIREMENTS In addition, to the requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-A1/A4 as applicable. 3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material su
4、ppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.2 FABRIC CONSTRUCTION 3.2.1 Fabric Count, +/- 5% tolerance (ASTM D 3887) Wales 126 wales/10 cm Courses 236 courses/10 cm 3.2.2 Fabric Weight, range, g/m2 (FLTM BN 106-01) Lamina
5、ted * Face w/no Backcoat 453 - 500 320 353 * 3 mm foam thickness 3.3 COMPOSITION (ASTM D 629) Tolerance as specified in WSS-M8P18-A1/A4 Fabric 100% Polyester ENGINEERING MATERIAL SPECIFICATIONWSS-M1H1016-A2 Printed copies are uncontrolled Copyright 2010, Ford Global Technologies, LLC Page 2 of 2 3.4
6、 YARN CONSTRUCTION (ASTM D 1244) Face (A) 11.1 tex (textured polyester yarn) (B) 11.1 tex (textured polyester yarn) Middle 11.1 tex (textured polyester yarn) Back 11.1 tex (100% post industrial yarn) 3.5 METHOD OF DYEING Piece Dye and/or solution dye 3.6 FINISHING OPERATIONS Washing, heat-setting, r
7、esin-finish, heat-setting Note: The fabric is treated with maximum 1% resin to prevent seam appearance issue due to broken filaments. 4. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. 4.1 Purchase department will ensure that the material defined in this specification and shipped to any one assembly plant will be produced by one supplier only.