1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions 2016 05 05 N Status No longer used D. Murtonen 2006 06 12 Activated L. Neves Copyright 2016, Ford Global Technologies, LLC Page 1 of 2 FABRIC, CORDOBA PATTERN, WOVEN JACQUARD WSS-M1H1095-A NOT TO BE USED FOR NEW DESIGN 1. SCOPE The material d
2、efined by this specification is a woven jacquard polyester fabric. 2. APPLICATION This specification was released originally for material used as an interior trim fabric for Focus 07 Model Year. 3. REQUIREMENTS Material specification requirements are to be used for initial qualification of materials
3、. In addition to the requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-A1/A2/A3/A4 as applicable. 3.1 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements for Production Materials (WSS-M9
4、9P1111-A). 3.2 FABRIC CONSTRUCTION 3.2.1 Fabric Count, +/- 5% (ASTM D 3775) Warp 32 yarn/cm Fill 21 yarn/cm 3.2.2 Fabric Weight, range (FLTM BN 106-01) Laminated to 4.5 mm foam + backing fabric 400 - 480 g/m 3.3 COMPOSITION (ASTM D 629) Fabric 100% Polyester Foam PUR/Polyether Backing Fabric (Seats)
5、 100% Polyester ENGINEERING MATERIAL SPECIFICATION WSS-M1H1095-A Copyright 2016, Ford Global Technologies, LLC Page 2 of 2 3.4 YARN CONSTRUCTION (ASTM D 1244) Warp PES Air textured 560 dtex black Fill PES Air textured 610 dtex Grey PES Air Textured 450 dtex Raw 3.5 METHOD OF DYEING Warp Solution Dye
6、d Fill Grey Solution Dyed Raw Raw (non dyed) 3.6 FINISHING OPERATIONS Heat Set 3.7 THICKNESS, mm, range (ASTM D 1777) Laminated to 4.5 mm foam + backing fabric 4.0 mm 3.8 TRIMMABILITY PROPERTIES 3.8.1 Stretch, %, +/- 5% (SAE J855) Warp 7.0% Fill 2.0% 3.9 FLAMMABILITY (ISO 3795/SAE J369) Burn Rate, m
7、ax 100 mm/minute 4. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. 4.1 Purchase departments will ensure that material defined in this specification and shipped to anyone assembly plant will be produced by one supplier only.