1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 0 2016 05 18 Released Z. Penny, APA Controlled document at www.MATS Copyright 2016, Ford Global Technologies, LLC Page 1 of 3 FABRIC, COPAN PATTERN, WOVEN JACQUARD, WSS-M1H1259-A13 100% VIRGIN WITH SOIL REPELLANT AND BACKCOATING 1. SCOPE
2、 The material defined is a flat woven 100% virgin polyester face fabric. 2. APPLICATION This specification was released originally for material used as an interior trim fabric for Figo 2015 seat insert. The fabric was originally approved as tri-laminated with foam and a backing scrim. 3. REQUIREMENT
3、S 3.1 APPROVED SOURCES This specification requires the use of approved sources. Only the sources identified on the Ford Approved Source List (ASL) can be used when this specification is listed on the drawing, CAD file, or other documents. The list of approved sources is located within Ford at or av
4、ailable externally through a Ford Materials Engineer. 3.2 FABRIC PERFORMANCE In addition to the requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-B1/B2/B3/B4/latest as applicable. 3.3 VEHICLE INTERIOR ENVIRONMENTAL PERFORMANCE Materials used in interior applications mus
5、t meet the requirements outlined in WSS-M99P2222-D1/latest, Performance, Vehicle Interior Environmental Quality Material/Component Requirements. Data must be included in material submission package. 3.4 CONDITIONING AND TEST CONDITIONS All test values are based on material conditioned for not less t
6、han 24 h prior to testing in a controlled environment of 23 +/- 2 C and 50 +/- 5% relative humidity. Testing of the material should occur in the conditioning environment or soon after removal. 3.5 FABRIC CONSTRUCTION 3.5.1 Fabric Count, + / - 10 % tolerance (ASTM D3775) Warp 283 / 10 cm Fill 260 / 1
7、0 cm 3.5.2 Fabric Weight, -/+ 10 % tolerance (FLTM BN 106-01) Face Fabric 327 g/m2 Back Coating 3 g/m2 Total Weight 330 g/ m2 ENGINEERING MATERIAL SPECIFICATION WSS-M1H1259-A13 Copyright 2016, Ford Global Technologies, LLC Page 2 of 3 3.6 COMPOSITION (ASTM D629) Fabric 100% polyester 3.7 YARN CONSTR
8、UCTION (ASTM D1244) Warp 650 Dtex, f144 (Semi-dull, Air Textured Polyester yarn) Weft 480 Dtex, f144 (Semi-dull, False Twist Polyester yarn) 3.8 METHOD OF DYEING Package dyeing yarn 3.9 FINISHED OPERATIONS Washing - Heat setting - Finishing with Acrylic Binder & Soil Repellent - Lamination 4. GENERA
9、L INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. Contact for questions concerning Engineering Material Specifications. 4.1 Purchase departments will ensure that the material defined in this specification and sh
10、ipped to any one assembly plant will be produced by one supplier only. 4.2 If yarn is locally sourced it must meet the above fabric construction, composition and yarn construction. The fabric must also meet the requirements of WSS-M8P18-B1/B2/B3/B4/latest. 4.3 Global strategy for this fabric is to u
11、se tri-laminate/foam & scrim construction in all regions. 4.4 APPROVAL OF MATERIALS Suppliers desiring approval of their materials shall first obtain an expression of interest from Purchasing, Design or Product Development, and Materials Engineering. The supplier shall submit a completed copy of the
12、ir laboratory test reports, signed by a qualified and authorized representative of the test facility, demonstrating full compliance with all the requirements of the Material Specification. Tested material samples must be available for review upon request and kept for a minimum of one year. Upon requ
13、est, the supplier will review the associated quality control documents (Process Failure Mode and Effects Analysis, Control Plans, Certification testing) with Ford. 4.5 SUPPLIERS ONGOING RESPONSIBILITY All materials must be equivalent in all characteristics to the material upon which approval was ori
14、ginally granted. Prior to making any changes to the material originally approved, whether or not such changes affect the materials ability to meet the specification requirements, the supplier shall notify the affected Supplier Technical Assistance (STA), Purchasing, and Materials Engineering activit
15、ies of the ENGINEERING MATERIAL SPECIFICATION WSS-M1H1259-A13 Copyright 2016, Ford Global Technologies, LLC Page 3 of 3 proposed changes (with reasons) by submission of a completed Suppliers Request for Engineering Approval, SREA. For parts and components using Ford Engineering Material Specificatio
16、ns, all samples tested to the specifications for Design Verification (DV), Production Verification (PV) and Production Part Approval Process (PPAP) sign off must be kept until Job 1. 4.6 RESTRICTED SUBSTANCE MANAGEMENT STANDARD Substance restrictions imposed by regulations or Company direction applies to the materials addressed by this document. The restrictions are identified in the Restricted Substance Management Standard WSS-M99P9999-A1/latest which is updated yearly. It is the suppliers responsibility to comply with this standard on a continuing basis. 5. SUMMARY OF REVISIONS