1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2008 12 03 N-STATUS No Replacement L. Schmalz, FNA / M. Montgomery, FOE2003 04 10 Revised Para 3.0 inserted; Para 3.1, 3.2, 3.3, 3.10, 3.11, 4 deleted 1997 10 28 Activated N.J. KomatsuPrinted copies are unco
2、ntrolled Page 1 of 2 Copyright 2008, Ford Global Technologies, Inc. FABRIC, MAZE, WEFT KNITTED WSS-M1H761-A NOT TO BE USED FOR NEW DESIGN 1. SCOPE The material defined by this specification is a weft knitted jacquard 19 gauge velour fabric. 2. APPLICATION This specification was released originally f
3、or material used as an interior trim fabric for the 1999 Mondeo. 3. REQUIREMENTS In addition to the requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-A1/A2/A3/A4. 3.0 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to th
4、e Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.4 FABRIC CONSTRUCTION 3.4.1 Fabric Count, +/- 7 % tolerance (ASTM D 3887) Wales 105 wales/10 cm Courses 155 courses/ 10 cm 3.4.2 Fabric Weight, range +/- 5 % tolerance (FLTM BN 106-01) 280 - 320 g/m23.4.3 Pile Height, min
5、1.7 mm 3.5 COMPOSITION (ASTM D 629) Fabric 100 % polyester ENGINEERING MATERIAL SPECIFICATION WSS-M1H761-A Page 2 of 2 Copyright 2008, Ford Global Technologies, Inc. 3.6 YARN CONSTRUCTION (ASTM D 1244) *Ground 167 dtex f32 - 48 (polyester, semi-dull, FTF dyed yarn) Pile 167 dtex f47 - 50 (polyester,
6、 semi-dull, dyed yarn, octolobal FTF) *Ground construction based on a knitted jersey 3.7 METHOD OF DYEING Yarn dyed or as approved by Materials Engineering 3.8 FINISHED OPERATIONS As approved by Materials Engineering 3.9 FLAMMABILITY (ISO 3795/SAE J369) Burn Rate, max 100 mm/minute Note: Not require
7、d on face fabric when used as a fully bonded composite. 5. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification: 5.1 Purchase departments will ensure that both materials defined in this specification and shipped to any one assembly plant will be produced by one supplier only.