1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2015 12 09 N Status No replacements D. Murtonen, NA 2003 02 26 Revised Para 3.0 ; Para 3.1, 3.2, 3.3, 3.10, 3.11, 4 deleted 1999 05 21 Activated L. Daniv-Zarewych Page 1 of 2 Copyright 2015, Ford Global Tech
2、nologies, Inc. FABRIC, CANVAS PATTERN, WOVEN WSS-M1H811-A NOT TO BE USED FOR NEW DESIGN 1. SCOPE The material defined by this specification is a flat woven body cloth of good quality and uniform composition. 2. APPLICATION This specification was released originally for material used as an interior t
3、rim fabric for Canvas Bags for 1999 Explorer. The fabric is backcoated, but not laminated. 3. REQUIREMENTS In addition, to the requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-A1/A4 as applicable. Exception: The materials meet resistance to fade requirement at 225.6 kJ
4、/m2 at R=4, only. 3.0 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.4 FABRIC CONSTRUCTION 3.4.1 Fabric Count, +/- 5 % tolerance (ASTM D 3775) Warp 323.80 ends/10 cm
5、Fill 133.80 picks/10 cm 3.4.2 Fabric Weight, range 302.6 - 334.5 g/m2 (FLTM BN 106-01) 3.5 COMPOSITION (ASTM D 629) Tolerance as specified in WSS-M8P18-A1/A4 Fabric 100 % Polyester Backcoating Acrylic ENGINEERING MATERIAL SPECIFICATION WSS-M1H811-A Page 2 of 2 Copyright 2015, Ford Global Technologie
6、s, Inc. 3.6 YARN CONSTRUCTION (ASTM D 1244) Warp 33.3 tex, 34 f (100 % semi-dull polyester, textured), 2 ply Fill 73.9 tex, (100 % semi- dull polyester, open end, 38.1 mm staple), 1 ply 3.7 METHOD OF DYEING Piece Dye 3.8 FINISHING OPERATIONS Coat, Inspect 3.9 FLAMMABILITY (ISO 3795/SAE J369) Burn Ra
7、te, max 100 mm/minute Note: Not required on face fabric when used as a fully bonded composite. 5. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. 5.1 Purchase departments will ensure that both materials defined in this specification and shipped to any one assembly plant will be produced by one supplier only.