FORD WSS-M1P83-C2-2008 ELECTROPLATING BRIGHT OR LOW GLOSS DECORATIVE FINISH OVER ABS PC ABS OR FILLED NYLON - EXTERIOR TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD WSS-M1P8.pdf

上传人:lawfemale396 文档编号:752473 上传时间:2019-01-14 格式:PDF 页数:7 大小:40.95KB
下载 相关 举报
FORD WSS-M1P83-C2-2008 ELECTROPLATING BRIGHT OR LOW GLOSS DECORATIVE FINISH OVER ABS PC ABS OR FILLED NYLON - EXTERIOR  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M1P8.pdf_第1页
第1页 / 共7页
FORD WSS-M1P83-C2-2008 ELECTROPLATING BRIGHT OR LOW GLOSS DECORATIVE FINISH OVER ABS PC ABS OR FILLED NYLON - EXTERIOR  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M1P8.pdf_第2页
第2页 / 共7页
FORD WSS-M1P83-C2-2008 ELECTROPLATING BRIGHT OR LOW GLOSS DECORATIVE FINISH OVER ABS PC ABS OR FILLED NYLON - EXTERIOR  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M1P8.pdf_第3页
第3页 / 共7页
FORD WSS-M1P83-C2-2008 ELECTROPLATING BRIGHT OR LOW GLOSS DECORATIVE FINISH OVER ABS PC ABS OR FILLED NYLON - EXTERIOR  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M1P8.pdf_第4页
第4页 / 共7页
FORD WSS-M1P83-C2-2008 ELECTROPLATING BRIGHT OR LOW GLOSS DECORATIVE FINISH OVER ABS PC ABS OR FILLED NYLON - EXTERIOR  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M1P8.pdf_第5页
第5页 / 共7页
点击查看更多>>
资源描述

1、 ENGINEERING MATERIAL SPECIFICATIONDate Action Revisions Rev. 2 2008 10 29 C2 N-STATUS C2 Replaced by WSS-M1P83-D2/D3 C. McComb, FNA 2006 11 10 Activated C. McComb/J. Crist Printed copies are uncontrolled Copyright 2008, Ford Global Technologies, LLC Page 1 of 7 ELECTROPLATING, BRIGHT OR LOW GLOSS D

2、ECORATIVE FINISH WSS-M1P83-C1 OVER ABS PC/ABS OR FILLED NYLON INTERIOR ELECTROPLATING, BRIGHT OR LOW GLOSS DECORATIVE FINISH WSS-M1P83-C2 OVER ABS, PC/ABS, OR FILLED NYLON EXTERIOR NOT TO BE USED FOR NEW DESIGN 1. SCOPE These specifications define the performance requirements for finished coatings o

3、f mechanically or chemically deposited electrical conductor coat and electrodeposited copper, nickel, and chromium for the decoration and protection of acrylonitrile butadiene styrene (ABS), polycarbonate/acrylonitrile butadiene styrene (PC/ABS) or filled nylon (PA) parts. 2. APPLICATION These speci

4、fications were released originally where a bright or low gloss decorative and/or protective finish is required for interior or exterior parts. Unless otherwise specified on the engineering drawing, all parts shall be finished with a final coating of chromium. Two levels of performance are defined as

5、 follows: WSS-M1P83-C1 Interior part applications WSS-M1P83-C2 Exterior part applications For coating over chrome applications, refer to WSS-M2P191-A1 for interior applications and WSS-M2P191-A2 for exterior applications. Testing to be conducted at Design Verification (DV) or Process Validation (PV)

6、 per Table 1 unless otherwise agreed to by Materials Engineering. 3. REQUIREMENTS All requirements identified for each specification must be met to achieve acceptable field durability. No one requirement, exclusive of others, is capable of insuring satisfactory performance. Any deviations to the req

7、uirements of these specifications may be subject to additional performance requirements. All part testing requirements apply to those areas of the part identified as a significant surface (per paragraph 4.3) unless otherwise specified on the engineering drawing. 3.1 STANDARD REQUIREMENTS FOR PRODUCT

8、ION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.2 APPEARANCE The plated parts shall be free from surface imperfections. Parts shall match the approved Styling master sample for appearance from Color A

9、-, B-, C, and D-Pillars; upper quarter panels; center finish panels, demisters and roof-rail moldings): . 5 h at -40 +/- 2 C . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 5 h at 100 +/- 2 C . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 2 h at 50 +/- 2 C and 95 +/- 5% Relative h

10、umidity . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 5 h at -40 +/- 2 C . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 5 h at 100 +/- 2 C ENGINEERING MATERIAL SPECIFICATIONWSS-M1P83-C1/C2 Printed copies are uncontrolled Copyright 2008, Ford Global Technologies, LLC Page 6 of 7

11、3.8.1.2 Horizontal or vertical parts BELOW THE BELT LINE (e.g. lower door panels, lower quarter trim panels, consoles). . 5 h at -40 +/- 2 C . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 5 h at 90 +/- 2 C . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 2 h at 50 +/- 2 C and 95 +/

12、- 5% Relative humidity . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 5 h at -40 +/- 2 C . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 5 h at 90 +/- 2 C 3.8.1.3 Scuff Plates, kick panels and other non-sun loaded floor level parts. . 5 h at -40 +/- 2 C . 30 min at 23 +/- 2 C and

13、50 +/- 5% Relative humidity . 5 h at 80 +/- 2 C . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 2 h at 50 +/- 2 C and 95 +/- 5% Relative humidity . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 5 h at -40 +/- 2 C . 30 min at 23 +/- 2 C and 50 +/- 5% Relative humidity . 5 h at 80 +/

14、- 2 C After Environmental testing is complete, perform 3.3.1 and 3.3.2. Appearance Evaluation: No evidence of cracks or blisters, per paragraph 3.7.2. 3.8.2 Environmental Cycling for C2 only (FLTM BQ 104-07, Procedure 1) All parts shall be complete including all components packaged in the assembly a

15、nd fastened onto actual or representative production support foundations that include not only all attaching points but also any boundary conditions that may restrict movement, unless otherwise specified by the affected Materials Engineering Activity. The retention methods, attachments and supportin

16、g moldings shall be the same as proposed for production. The cycled part shall show no evidence of warpage, deformation, cracks, delamination or other failures to an extent that would affect its use in the ultimate assembly. The cycled part shall show no changes in appearance when compared with the

17、original untested part. Gaps, margins and surface waviness must be within original vehicle design tolerances after returning to ambient temperature. After Environmental testing is complete, perform 3.3.1 and 3.3.2. No defects per paragraph 3.7.2. 4. GENERAL INFORMATION The information given below is

18、 provided for clarification and assistance in meeting the requirements of these specifications. ENGINEERING MATERIAL SPECIFICATIONWSS-M1P83-C1/C2 Printed copies are uncontrolled Copyright 2008, Ford Global Technologies, LLC Page 7 of 7 4.1 MATERIAL REFERENCE . Plating Grade ABS Plastic ESB-M4D241-B

19、PC/ABS WSB-M4D813-A . Plating Grade Mineral Filled Nylon WSS-M4D429-C1 4.2 MOLDED PARTS Plastic parts intended for plating by this specification must be molded in keeping within the best commercial practice to achieve stress-free parts and ensure good plateability. Molded-in stresses can result in p

20、art failure by loss of plating adhesion (blistering) and/or cracking of the plastic and/or plating when subjected to service temperature extremes. Parts must be stress relieved prior to plating and subsequent to plating as required. 4.3 SIGNIFICANT SURFACES Unless otherwise specified on the engineer

21、ing drawing, significant surfaces are defined as those surfaces of the finished part that: - Are directly visible and/or visible by reflection when the finished part is assembled in car position. - Can be the source of corrosion products directly visible or visible by reflection. 4.4 DUCTILITY (ASTM

22、 B 490) Although this is considered a portion of the process control and not a requirement of part performance, the ductility percentage of Semi-bright Nickel and Bright Nickel on foils plated in the individual nickel baths should be rated, reported, and included in the Control Plan. TABLE 1 Sample

23、size To be done at DV testing To be done at PV testing 3.3.1 Grind-Saw 3 X 3.3.2 Bend Tests 3 X 3.3.3 Scribe-Grid Test 3 X X 3.3.4 Thermal Shock 3 X 3.3.5.1 Grit Black, Split Shot 3 X X 3.3.5.2 Stone Chip 3 X X 3.5 Microporosity 1 X 3.6 S.T.E.P. 1 X 3.7.1 Thermal Cycle for C1 1 X 3.7.2 Thermal Cycle for C2 1 X 3.8.1 Environmental Cycle for C1 1 X 3.8.2 Environmental Cycle for C2 1 X X = REQUIRED

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1