FORD WSS-M3H123-C2-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) NON WOVEN FLOOR BACKING TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD WSS-M3H123-C).pdf

上传人:王申宇 文档编号:753287 上传时间:2019-01-14 格式:PDF 页数:5 大小:66.41KB
下载 相关 举报
FORD WSS-M3H123-C2-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) NON WOVEN FLOOR BACKING  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M3H123-C).pdf_第1页
第1页 / 共5页
FORD WSS-M3H123-C2-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) NON WOVEN FLOOR BACKING  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M3H123-C).pdf_第2页
第2页 / 共5页
FORD WSS-M3H123-C2-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) NON WOVEN FLOOR BACKING  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M3H123-C).pdf_第3页
第3页 / 共5页
FORD WSS-M3H123-C2-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) NON WOVEN FLOOR BACKING  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M3H123-C).pdf_第4页
第4页 / 共5页
FORD WSS-M3H123-C2-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) NON WOVEN FLOOR BACKING  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD WSS-M3H123-C).pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 2 2018 05 04 Revised See Summary of Revisions L. Sinclair, NA 2015 05 08 Revised See Summary of Revisions L. Sinclair, NA 2014 06 13 Released L. Sinclair, NA Controlled document at www.MATS Copyright 2018, Ford Global Technologies, LLC P

2、age 1 of 5 CARPET, BCF NYLON, CUT PILE, WSS-M3H123-C SHIVA PATTERN, 678 g/m2 (20 oz), TUFTED FLOOR BACKING CARPET, BCF NYLON, CUT PILE, WSS-M3H123-C2 SHIVA PATTERN, 678 g/m2 (20 oz), NON WOVEN FLOOR BACKING 1. SCOPE The materials defined by this specification are fine denier, bulked continuous filam

3、ent (BCF) nylon, cut pile carpets, tufted into a synthetic primary foundation. The mat may be backed with either rubber or other material. 2. APPLICATION WSS-M3H123-C- The material approved to this specification was released originally for floor mats used on tufted floors. WSS-M3H123-C2 The material

4、 approved to this specification was released originally for floor mats used on tufted floors. 2.1 LIMITATION Model year 2016 and beyond compression molding is not allowed to marry the face to backing material or to pull any B side features. Compression molding is only allowed as a secondary process

5、to change geometry (3D shape). 3. REQUIREMENTS 3.1 APPROVED SOURCES This specification requires the use of approved sources. Only the sources identified on the Ford Approved Source List (ASL) can be used when this specification is listed on the drawing, CAD file, or other documents. The list of appr

6、oved sources is located within Ford at or available externally through a Ford Materials Engineer. 3.2 CONDITIONING AND TEST CONDITIONS All test values are based on material conditioned for not less than 24 h prior to testing in a controlled environment of 23 +/- 2 C and 50 +/- 5% relative humidity.

7、 Testing of the material should occur in the conditioning environment or soon after removal. 3.3 PERFORMANCE CRITERIA 3.3.1 In addition to the requirements listed herein, the end-item mat assembly shall be tested to WSS-M15P44-B and any additional SDS requirements. 3.3.2 The details for each of the

8、suppliers specific construction shall be documented in the supplement attached and saved by Ford in the construction package. ENGINEERING MATERIAL SPECIFICATION WSS-M3H123-C/C2 Copyright 2018, Ford Global Technologies, LLC Page 2 of 5 3.4 SAMPLE SELECTION All evaluations shall be conducted on test s

9、pecimens taken from finished mat assemblies. 3.5 APPEARANCE The color, pattern, and gloss shall match the approved Design Center master sample. 3.6 COMPOSITION 3.6.1 Pile Yarn 100% Nylon 6/6 or 6* (ASTM D 276) *Type will be documented on the approved construction supplement held in the Ford Construc

10、tion Package. 3.6.2 Primary Foundation Polyester (ASTM D 276) 3.6.3 Back Coating Report* (ASTM D 276) 3.6.4 Pre Coat Report * (ASTM D 276) 3.6.5 Secondary Foundation Report * (ASTM D 276) 3.6.6 Secondary Backing Report * (ASTM D 276) * Materials approved for each suppliers construction can be found

11、in the Ford Construction package. 3.7 METHOD OF DYING Solution Dyed 3.8 CONSTRUCTION 3.8.1 Pile Yarn 1000 Denier (ASTM D 1244) 3.8.2 Pile Count (ISO 1763) Rows / 100 mm 50.4 Stitches / 100 mm 65.0 Rows and stitches per 100 mm shall be based on an average count on a 254 mm length of carpet and shall

12、not exceed the tolerance provided on the approved construction supplement in the Ford Construction Package for the approved material. 3.8.3 Needle Gauge 1.98 mm 3.9 THICKNESS 3.9.1 Final Pile Height 6.2 mm Nominal (ISO 1765) ENGINEERING MATERIAL SPECIFICATION WSS-M3H123-C/C2 Copyright 2018, Ford Glo

13、bal Technologies, LLC Page 3 of 5 Pile Height tolerances approved for each suppliers construction can be found in the Ford Construction package. 3.9.2 Primary Foundation (mm) Report * (ISO 1765) 3.9.3 Back Coating (mm) Report * (ISO 1765) The back coating shall thoroughly saturate the base of the pi

14、le fiber bundles to ensure adequate tuft lock. Penetration of the back coating through to the face shall be controlled to provide the required resistance to abrasion and fiber loss, but it shall not be visible on the face of the pile fiber. 3.9.4 Pre Coat (mm) Report * (ISO 1765) 3.9.5 Secondary Fou

15、ndation (mm) Report * (ISO 1765) 3.9.6 Secondary Backing (mm) Report * (ISO 1765) * Thicknesses and tolerances approved for each suppliers construction can be found in the Ford Construction package. 3.10 WEIGHT 3.10.1 Pile Yarn 678 g/m2 (20 oz) (ASTM D5848) Nominal 3.10.2 Primary Foundation 120 +/-

16、10 g/m2 (ASTM D5848) (3.5+/- 0.3 oz) 3.10.3 Back Coating (g/m2 (oz) Report * (ASTM D5848) 3.10.4 Pre Coat (g/m2 (oz) Report * (ASTM D5848) 3.10.5 Secondary Foundation (g/m2 (oz) Report * (ASTM D5848) 3.10.6 Secondary Backing (g/m2 (oz) Report * (ASTM D5848) * Weights and tolerances approved for each

17、 suppliers construction can be found in the Ford Construction package. 4. GENERAL INFORMATION This information given below is provided for clarification and assistance in meeting the requirements of this specification. Contact for questions concerning Engineering Material Specifications. 4.1 DRAWIN

18、G CALL OUT The following shall be called out on the Engineering drawing to correctly designate the approved material. ENGINEERING MATERIAL SPECIFICATION WSS-M3H123-C/C2 Copyright 2018, Ford Global Technologies, LLC Page 4 of 5 WSS-M3H123-C or C2 Supplier Name and Product Code WSS-M15P44-B 4.2 APPROV

19、AL OF MATERIALS Suppliers desiring approval of their materials shall first obtain an expression of interest from Purchasing, Design or Product Development, and Materials Engineering. The supplier shall submit a completed copy of their laboratory test reports, signed by a qualified and authorized rep

20、resentative of the test facility, demonstrating full compliance with all the requirements of the Material Specification. Tested material samples must be available for review upon request and kept for a minimum of one year. Upon request, the supplier will review the associated quality control documen

21、ts (Process Failure Mode and Effects Analysis, Control Plans, Certification testing) with Ford. 4.3 SUPPLIERS ONGOING RESPONSIBILITY All materials must be equivalent in all characteristics to the material upon which approval was originally granted. Prior to making any changes to the material origina

22、lly approved, whether or not such changes affect the materials ability to meet the specification requirements, the supplier shall notify the affected Supplier Technical Assistance (STA), Purchasing, and Materials Engineering activities of the proposed changes (with reasons) by submission of a comple

23、ted Suppliers Request for Engineering Approval, SREA. For parts and components using Ford Engineering Material Specifications, all samples tested to the specifications for Design Verification (DV), Production Verification (PV) and Production Part Approval Process (PPAP) sign off must be kept until J

24、ob 1. 4.4 RESTRICTED SUBSTANCE MANAGEMENT STANDARD Substance restrictions imposed by regulations or Company direction applies to the materials addressed by this document. The restrictions are identified in the Restricted Substance Management Standard WSS-M99P9999-A1, which is updated yearly. It is t

25、he suppliers responsibility to comply with this standard on a continuing basis through IMDS and or GMAP reporting. 5. SUMMARY OF REVISIONS 2018 05 04 Created C2 suffix and separated out approvals based on compatability with non woven or tufted floor. Updated application Updated standard paragraphs a

26、nd re-numbered. Updated appearance section Removed WSS-M99P2222-D1 2015 05 08 Added limitation not allowing compression molded mats for 2016 and beyond. ENGINEERING MATERIAL SPECIFICATION WSS-M3H123-C/C2 Copyright 2018, Ford Global Technologies, LLC Page 5 of 5 Floor Mat Construction Supplement Supp

27、lier _Supplier Contact Name_ Number _ Product Name _ Supplier Rubber Grade _ Supplier Product Code _ Performance Specification _ Supplier Lab Number _ Supplier Lab Date _ Manufacturing Location _Tufter _ Composition Product Code / Trade Name Supplier Pile Yarn ASTM D276 _ _ Primary Foundation ASTM D

28、276 _ _ Back Coating (rubber) ASTM D276 _ _ Pre Coat ASTM D276 _ _ Secondary Foundation ASTM D276 _ _ Secondary Backing ASTM D276 _ _ Construction Solution or piece dyed (circle one) Please provide the following thermal data on the rubber backing: FTIR (ASTM E1252) _ DSC (ASTM D1356/D3418) _ TGA (AS

29、TM E1131) _ Pile Yarn ASTM D1244 _ Denier Pile Count ISO 1763 _+/- _ binding sites/ 100 mm length _+/- _binding sites/100 mm width Needle Gauge _ mm Pile Thickness ISO 1765 _+/- _ mm Primary Thickness ISO 1765 _+/- _ mm Back Coating Thickness ISO 1765 _+/- _ mm Pre Coat Thickness ISO 1765 _+/- _ mm

30、Secondary Thickness ISO 1765 _+/- _ mm Secondary Backing Thickness ISO 1765 _+/- _ mm Mass per Unit Area Weight Pile Yarn ASTM D5848 _+/- _ g/m2 Primary Foundation ASTM D5848 _+/- _ g/m2 Back Coating (rubber) ASTM D5848 _+/- _ g/m2 Pre Coat ASTM D5848 _+/- _ g/m2 Secondary Foundation ASTM D5848 _+/- _ g/m2 Secondary Backing ASTM D5848 _+/- _ g/m2 Materials Engineering Signature _Date _ Comments _ Design Verification _ Production Verification _

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1