GME 13003 PART 7-2008 Passenger Car - Heating - Ventilation and Air Conditioning Part 7 Heater Core (English German This standard may be applied only for current projects incl Globfut.pdf

上传人:livefirmly316 文档编号:754863 上传时间:2019-01-19 格式:PDF 页数:7 大小:43.74KB
下载 相关 举报
GME 13003 PART 7-2008 Passenger Car - Heating - Ventilation and Air Conditioning Part 7 Heater Core (English German This standard may be applied only for current projects incl Globfut.pdf_第1页
第1页 / 共7页
GME 13003 PART 7-2008 Passenger Car - Heating - Ventilation and Air Conditioning Part 7 Heater Core (English German This standard may be applied only for current projects incl Globfut.pdf_第2页
第2页 / 共7页
GME 13003 PART 7-2008 Passenger Car - Heating - Ventilation and Air Conditioning Part 7 Heater Core (English German This standard may be applied only for current projects incl Globfut.pdf_第3页
第3页 / 共7页
GME 13003 PART 7-2008 Passenger Car - Heating - Ventilation and Air Conditioning Part 7 Heater Core (English German This standard may be applied only for current projects incl Globfut.pdf_第4页
第4页 / 共7页
GME 13003 PART 7-2008 Passenger Car - Heating - Ventilation and Air Conditioning Part 7 Heater Core (English German This standard may be applied only for current projects incl Globfut.pdf_第5页
第5页 / 共7页
点击查看更多>>
资源描述

1、Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 1 von 7LBSP GME PVS 1 09/97ENGINEERINGSTANDARDSEUROPEaTEST SPECIFICATIONPRFVORSCHRIFTPassenger Car - Heating - Ventilation and Air ConditioningPart 7, Heater CoreGME 13003Part/Teil 7Fahrzeug - Heizung - Belf

2、tung und Klimatisierung,Teil 7, WrmetauscherNote: This standard may be applied only for current projects incl. Global Epsilon (37#). It isSuperceded for all future projects and replaced by GMW14322.Hinweis: Diese Spezifikation darf nur noch fr laufende Projekte einschlielich Global Epsilon (37#)ange

3、wendet werden und ist fr alle zuknftigen Projekte ungltig und ersetzt durch GMW14322.Revisions/nderungenDate/Datum Description/Beschreibung Approved/Genehmigt23/JAN/2008 was issue 1, date of issue 06/95 / set to Supersededwar Ausgabe 1, Ausgabedatum 06/95 / Status auf Superseded“ gesetzt.Approved/Ge

4、nehmigtVolker Weber 21/JAN/2008 Jrg Kruse 23/JAN/2008Adam Opel GmbHGME VS ThermalAdam Opel GmbHGME Requirements EngineeringDespite spot checks possibly performed by the receiver, it is the suppliers responsibility that the delivered parts are in line with thesespecifications. Deliveries of samples,

5、first off-tool parts and parts, the performance of which has been changed, must be accompanied by a testreport showing the test results in terms of figures./Unbeschadet etwaiger durch den Abnehmer erfolgenden Stichprobenprfungen trgt der Lieferant die Verantwortung dafr, da die gelieferteWare diese

6、Vorschriften erfllt. Ein Prfbericht mit zahlenmigen Ergebnissen aus Prfungen der Lieferung selbst, ist bei jeder Bemusterung,Erstbelieferung und Ausfhrungsnderung mitzugeben.ENGINEERINGSTANDARDSEUROPETEST SPECIFICATIONPRFVORSCHRIFTGME 13003Part/Teil 7Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08

7、Prepared/Ausgefertigt: K. MasanPage ofSeite 2 von 71 Test Methods and Requirements1.1 General1.1.1Heater cores must fulfill the requirements according to part 1.1.1.2If not otherwise specified, test samples shall be tested with production hoses. The hoses shall beconnected as in the vehicle applicat

8、ion. The connection shall be evaluated at the same time as theheater cores.1.2 Key CharacteristicsThe heater core must fulfill key characteristics (airside heat transfer, airside pressure drop, coolant sidepressure drop) as specified on the drawing or in the specification. Testing shall be performed

9、 accordingto GME L-13D-2.1.3 Odour TestIn the as received condition, after 5 min of usage and after completion of testing according to clauses 1.7and 1.12 the heater core must fulfill the requirements as specified in part 1, clause 7.1.7 of thisspecification (no objectionable odour permitted).1.4 Ti

10、ghtnessThe heater core and assembled connections must be tight. For verification the heater core shall becharged with air at a static pressure of 320 5 kPa gauge. No air bubbles may occur if heater core issubmerged in a water bath for 1 min. No visible deformation may occur after test.1.5 Internal T

11、ightnessTo verify internal tightness (between coolant inlet and outlet) of the heater core the test sample shall beinstalled in equipment (as described in specification GME L-13D-2). The inlet pipe of the heater coreshall be connected to the reservoir (content 3 l). The reservoir shall be filled wit

12、h water up to theoverflow outlet ( at 2/3 of its height). Within the test period of 1 h no water may drop out of the heatercore outlet.1.6 Tightness Under VacuumThe heater core shall provide sufficient strength and tightness under vacuum. The heater core shall beexposed for 3 min to an internal stat

13、ic pressure of -20 kPa gauge. Following this test the heater coremust fulfill the requirements according to clause 1.4.ENGINEERINGSTANDARDSEUROPETEST SPECIFICATIONPRFVORSCHRIFTGME 13003Part/Teil 7Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 3 von 71 Pr

14、fverfahren und Anforderungen1.1 Allgemein1.1.1Wrmetauscher mssen die Anforderungen nach Teil 1 erfllen.1.1.2Wenn nicht anders gefordert, werden die Prfungen an den Wrmetauschern mit serienmigangeschlossenen Originalschluchen durchgefhrt und diese Verbindungen mitbeurteilt.1.2 KenndatenDer Wrmetausch

15、er mu bezglich der Kenndaten (Wrmeleistung luftseitig, Druckabfall Luft,Druckabfall Khlmittel) die Anforderungen nach Zeichnung bzw. Prfvorschrift erfllen. Die Prfungerfolgt nach GME L-13D-2.1.3 GeruchsprfungIm Anlieferungszustand, nach 5 min Betriebszeit und nach Abschlu der Prfungen 1.7 und 1.12,

16、muder Wrmetauscher die Anforderungen nach Teil 1, Pos. 7.1.7, dieser Spezifikation erfllen (keinstrender Geruch).1.4 DichtheitDer Wrmetauscher und die montierten Verbindungen mssen dicht sein. Zur Prfung wird derWrmetauscher in ein Wasserbad getaucht und ein statischer berdruck von 320 kPa 5 kPaaufg

17、ebaut. Innerhalb der Prfzeit von 1 min darf keine Blasenbildung auftreten. Nach der Prfung darfder Wrmetauscher keine erkennbare Verformung aufweisen.1.5 Innere DichtheitZur Prfung der inneren Dichtheit (zwischen Vor- und Rcklauf) des Wrmetauschers wird dieser in eineVorrichtung aufgebaut (wie in GM

18、E L-13D-2) dargestellt. Der Vorlauf des Wrmetauschers wird mit demWasserbehlter (Inhalt 3 l) verbunden und dieser bis zum berlauf ( auf 2/3 seiner Hhe) mit Wasserbefllt. Innerhalb der Prfzeit von 1 h darf am Rcklauf des Wrmetauschers kein Wasserheraustropfen.1.6 Dichtheitsprfung mit UnterdruckDer Wr

19、metauscher mu bei Unterdruck ausreichende Festigkeit und Dichtheit aufweisen. Auf denWrmetauscher wird 3 min lang ein statischer Druck von -20 kPa aufgebracht. Anschlieend mu derWrmetauscher die Anforderungen nach Pos. 1.4 erfllen.ENGINEERINGSTANDARDSEUROPETEST SPECIFICATIONPRFVORSCHRIFTGME 13003Par

20、t/Teil 7Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 4 von 71.7 Temperature Cycle TestThe heater core shall be resistant against temperature cycles. For testing the heater core shall bemounted on a test stand and tested according to the following proce

21、dure:Cold coolant: 7 min coolant flow: (-10 C 3 K)then change within 10 s toHot coolant: 5 min coolant flow: (+100 C 2,5 K)Flow rate: 1000 l/h 50 l/hPressure gauge: +150 kPa 10 kPaNumber of cycles: 10001.8 Long-term Heat AgeingThe heater core shall be long term temperature resistant.For testing the

22、heater core shall be charged with coolant according to GME L 1301 at a pressure of+150 kPa 10 kPa gauge. Then the heater core shall be stored for 1350 h at an ambient temperature of+120 C 2,5 K and for 50 h at an ambient temperature of +130 C 2,5 K.After 1400 h the heater core must fulfill the requi

23、rements according to clause 1.5.1.9 Strength including PipesThe heater core and its connecting pipes must be designed to provide adequate strength to withstand allrequirements of transportation, vehicle installation and vehicle application.A heater core assembled into a heater or air conditioning un

24、it may not show any functional deviations ifan effort of 150 N is applied in direction of pipes or any other possible direction to the pipe ends. Aftercompletion of test pipe end location must be within 2 mm of the original pipe end location. Nopermanent deformation of pipe ends is permitted if cool

25、ant hoses and clamps are mounted. Thefastening torque of the clamp screw shall be 3,5 Nm.1.10 Fin DeformationIn the as received condition 2 % max of the fins shall show slight deformations.1.11 Vibration TestVibration testing according to QT 12 6537 shall be performed with the heater core installed

26、into theheater or air conditioning unit.At the end of the test no noise may be created by the heater core or its mounting to the heater or airconditioning unit. The heater core shall be securely mounted after the test and shall not show anymechanical or functional damage.ENGINEERINGSTANDARDSEUROPETE

27、ST SPECIFICATIONPRFVORSCHRIFTGME 13003Part/Teil 7Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 5 von 71.7 TemperaturwechselprfungDer Wrmetauscher mu gegen Temperaturwechsel bestndig sein. Dazu wird der Wrmetauscher ineine Prfeinrichtung montiert und wie

28、 folgt geprft:7 min Durchflu kaltes Prfmittel: (-10 C 3 K)Wechsel innerhalb 10 s zu5 min Durchflu heies Prfmittel: (+100 C 2,5 K)Durchflumenge: 1000 l/h 50 l/hDruck: +150 kPa 10 kPaAnzahl der Zyklen: 10001.8 Langzeit-WrmealterungDer Wrmetauscher mu dauerhaft temperaturbestndig sein.Zur Prfung wird d

29、er Wrmetauscher, befllt mit Khlerschutzmittel nach GME L 1301, unter einemRelativdruck von +150 kPa 10 kPa, 1350 h lang in einer Umgebungstemperatur von +120 C 2,5 Kund 50 h lang in +130 C 2,5 K gelagert.Nach 1400 h mu der Wrmetauscher die Anforderungen nach Pos. 1.5 erfllen.1.9 Festigkeit einschlie

30、lich AnschlurohreDer Wrmetauscher und seine Anschlurohre mssen so ausgelegt sein, da sie bei allenAnforderungen des Transports, der Bandmontage und des Fahrbetriebes ausreichende Festigkeitaufweisen.An dem in der Heizkammer montierten Wrmetauscher darf durch eine in Richtung der Rohre bzw. inalle an

31、deren mglichen Richtungen wirkende Kraft von 150 N keine die Funktion beeinflussendeBeeintrchtigung auftreten. Die bleibende Rohrlagevernderung darf 2 mm max betragen. Bei derMontage der Schluche und Schlauchschellen auf das Rohr darf bei einem Anzugsmoment an derSchelle von 3,5 Nm an den Rohren kei

32、ne bleibende Verformung auftreten.1.10 Verformung der LamellenIm Anlieferungszustand drfen 2 % max der Lamellen leichte Deformationen aufweisen.1.11 SchwingungsprfungDie Schwingungsprfung nach QT 12 6537 wird an dem in Heizkammer bzw. Klimagert eingebautenWrmetauscher durchgefhrt.Nach der Prfung drf

33、en durch den Wrmetauscher bzw. durch seine Montage in Heizkammer bzw.Klimagert keine Gerusche verursacht werden, er mu festen Sitz aufweisen und darf keinemechanischen oder funktionellen Schden aufweisen.ENGINEERINGSTANDARDSEUROPETEST SPECIFICATIONPRFVORSCHRIFTGME 13003Part/Teil 7Issue/Ausgabe: 2Dat

34、e of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 6 von 71.12 Pressure cycle testHeater core for air mix heater or air conditioning systems shall be tested according to the followingprocedure:At a frequency of 0,5 Hz the heater core shall be submitted to pressure cycles (gaug

35、e pressures).5 pressure cycles from 0 kPa to 180 kPa gauge1 pressure cycle from 0 kPa to 250 kPa gauge5 pressure cycles from 0 kPa to 180 kPa gauge1 pressure cycle from 0 kPa to 250 kPa gaugeand so onThe pressure peaks shall be reached within 100 ms +50 ms. After the peak the pressure shall dropinst

36、antly.Coolant: According to GME L 1301Coolant temperature: +120 C 2,5 KFlow rate: 12 l/minVertical heater core vibration with a nearly sinusoidal frequency of 30 Hz and an Amplitude of 0,4 mm.After every 50.000 cycles, one pressure cycle from 0 kPa to 350 kPa gauge shall be applied. The totaltest sh

37、all be 250.000 pressure cycles.After this test the heater cores must be completely functional.Following this test the heater core may not show any defects and must fulfill the requirements accordingto clauses 1.3 and 1.4.1.13 Burst pressureAfter the pressure cycle test the heater core shall be charg

38、ed with water and submitted to a slowlyincreasing pressure of 50 kPa/min until a leak occurs. No leaks may occur until a pressure of 800 kPagauge is reached.1.14 Corrosion testRelative the corrosion resistance heater cores made of copper or copper alloys must fulfill therequirements according to GME

39、 60 206 - H - Grade 2 and heater cores made of aluminium or aluminiumalloys must fulfill GME 60 213.ENGINEERINGSTANDARDSEUROPETEST SPECIFICATIONPRFVORSCHRIFTGME 13003Part/Teil 7Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 01/08Prepared/Ausgefertigt: K. MasanPage ofSeite 7 von 71.12 Druckwechselprfung

40、 (Dauerprfung)Wrmetauscher fr luftgesteuerte Heizungen werden wie folgt dauergeprft:Mit einer Frequenz von 0,5 Hz werden auf den Wrmetauscher Druckanstiege (berdruck) aufgebracht.5 Druckanstiege von 0 kPa auf 180 kPa1 Druckanstieg von 0 kPa auf 250 kPa5 Druckanstiege von 0 kPa auf 180 kPa1 Druckanst

41、ieg von 0 kPa auf 250 kPausw.Es handelt sich um Druckspitzen, die innerhalb 100 ms +50 ms erreicht werden mssen und sofortwieder abfallen.Prfmittel: Khlerschutzmittel nach GME L 1301Prfmitteltemperatur: +120 C 2,5 KDurchflumenge: 12 l/minVertikales Rtteln des Wrmetauschers mit einer nahezu sinusfrmi

42、gen Frequenz von 30 Hz und 0,4 mm Amplitude.Nach jeden 50 000 Anstiegen wird 1 Druckanstieg von 0 kPa auf 350 kPa aufgebracht.Die Gesamtprfung umfat 250.000 Druckanstiege.Danach mssen die Wrmetauscher ohne Einschrnkung funktionsfhig sein.Nach dieser Prfung darf der Wrmetauscher keine Mngel aufweisen

43、 und mu die Anforderungen nachPos. 1.3 und 1.4 erfllen.1.13 BerstdruckNach der Dauerprfung wird der mit Wasser gefllte Wrmetauscher mit langsam ansteigendem Druckvon 50 kPa/min so lange beaufschlagt, bis ein Wasserleck auftritt. Bis 800 kPa darf kein Wasserleckauftreten.1.14 KorrosionstestBezglich Korrosionsbestndigkeit mssen Wrmetauscher aus Kupfer oder Kupferlegierungen dieAnforderungen nach GME 60 206 - H - Stufe 2 und solche aus Aluminium oder Aluminiumlegierungendie nach GME 60 213 erfllen.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1