GME 60277-2007 Test Method for Determining the Press-in Force and Retaining Force of Clips for Attachment of Trim Components to Vehicle Doors (English German This standard may be Ep.pdf

上传人:proposalcash356 文档编号:754940 上传时间:2019-01-19 格式:PDF 页数:5 大小:31.15KB
下载 相关 举报
GME 60277-2007 Test Method for Determining the Press-in Force and Retaining Force of Clips for Attachment of Trim Components to Vehicle Doors (English German  This standard may be  Ep.pdf_第1页
第1页 / 共5页
GME 60277-2007 Test Method for Determining the Press-in Force and Retaining Force of Clips for Attachment of Trim Components to Vehicle Doors (English German  This standard may be  Ep.pdf_第2页
第2页 / 共5页
GME 60277-2007 Test Method for Determining the Press-in Force and Retaining Force of Clips for Attachment of Trim Components to Vehicle Doors (English German  This standard may be  Ep.pdf_第3页
第3页 / 共5页
GME 60277-2007 Test Method for Determining the Press-in Force and Retaining Force of Clips for Attachment of Trim Components to Vehicle Doors (English German  This standard may be  Ep.pdf_第4页
第4页 / 共5页
GME 60277-2007 Test Method for Determining the Press-in Force and Retaining Force of Clips for Attachment of Trim Components to Vehicle Doors (English German  This standard may be  Ep.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 11/07Prepared/Ausgefertigt: JKRPage ofSeite 1 von 5LBSP GME PVS 2 11/95ENGINEERINGSTANDARDSEUROPETEST METHODPRFVERFAHRENTest Method for Determining the Press-in Force and RetainingForce of Clips for Attachment of Trim Components to Vehicle DoorsBestimmung

2、der Eindrck- und Haltekraft von Klippsen zurBefestigung von Verkleidungsteilen an Fahrzeugtren GME 60277Note: This standard may be applied only for current projects incl. Global Epsilon (37#). It isSuperceded for all future projects and replaced by GMW15530.Hinweis: Diese Spezifikation darf nur noch

3、 fr laufende Projekte einschlielich Global Epsilon (37#)angewendet werden und ist fr alle zuknftigen Projekte ungltig und ersetzt durch GMW15530.Revisions/nderungenDate/Datum Description/Beschreibung Approved/Genehmigt12.11.2007 was Issue 1; Ausgabedatum 04/90 / set to Supersededwar Ausgabe 1; Ausga

4、bedatum 04/90 / Status auf Superseded“ gesetztApproved/GenehmigtJ. Kruse 12.11.2007 Klaus OsterhageAdam Opel GmbHGME Engineering Requirements EngineeringStructural TestsAdam Opel GmbHGME EngineeringDespite spot checks possibly performed by the receiver, it is the suppliers responsibility that the de

5、livered parts are in line with thesespecifications. Deliveries of samples, first off-tool parts and parts, the performance of which has been changed, must be accompanied by a testreport showing the test results in terms of figures./Unbeschadet etwaiger durch den Abnehmer erfolgenden Stichprobenprfun

6、gen trgt der Lieferant die Verantwortung dafr, da die gelieferteWare diese Vorschriften erfllt. Ein Prfbericht mit zahlenmigen Ergebnissen aus Prfungen der Lieferung selbst, ist bei jeder Bemusterung,Erstbelieferung und Ausfhrungsnderung mitzugeben.Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 11/07Pr

7、epared/Ausgefertigt: JKRPage ofSeite 2 von 5ENGINEERINGSTANDARDSEUROPETEST METHODPRFVERFAHREN GME 60277Reference is made to the following Test Method, National Standard and Material Specification:DIN 51 221, Part 1, 10.76 Material Testing Machines; Tensile Testing Machines;General RequirementsGME 60

8、 300 Test Method for Conditioning of Plastic Materials,T extiles, Fibreboards, Wood etc.QS 1010 Z0 Mild Steel Strip and Sheet1 ScopeThis test method shall be used to determine the press-in force and retaining force of clips used forattachment of door trim panels to vehicle doors.2 Test Pieces and Nu

9、mber of Test Pieces2.1Clips according to drawing specification shall be used as test pieces.2.2For initial sample approval, arbitration purposes and for routine quality control at least 10 test pieces shallbe tested.3 ConditioningFor initial sample approval and arbitration purposes, conditioning sha

10、ll be carried out according to GME60300 - B1. Routine quality control tests shall be carried out on test pieces in the as received condition (i.e.no special pre-conditioning)4 Apparatus4.1Apparatus for conditioning to the appropriate requirements of GME 60300.Issue/Ausgabe: 2Date of Issue/Ausgabedat

11、um: 11/07Prepared/Ausgefertigt: JKRPage ofSeite 3 von 5ENGINEERINGSTANDARDSEUROPETEST METHODPRFVERFAHREN GME 60277Folgende Vorschriften kommen in diesem Prfverfahren zur Anwendung:DIN 51221, Teil 1, 10.76 Werkstoffprfmaschinen; Zugprfmaschinen, Allgemeine AnforderungenGME 60300 Probenvorbehandlung v

12、on Kunststoffen, Textilien,Pappen, Holz o.QS 1010 Z0 Band und Blech aus weichen unlegierten Sthlen1 ZweckDieses Prfverfahren dient der Ermittlung der Eindrck- und Haltekraft von Klippsen, die zur Befestigungvon Trverkleidungen an Fahrzeugtren eingesetzt werden.2 Probekrper und Anzahl der Probekrper2

13、.1Geprft werden die Klippse entsprechend den Zeichnungsangaben.2.2Bei Erstbemusterungen, in Schiedsfllen und fr die laufende Qualittsberwachung sind mindestens 10Probekrper zu prfen.3 ProbenvorbehandlungBei Erstbemusterungen und in Schiedsfllen erfolgt die Probenvorbehandlung nach GME 60300 - B1. Di

14、elaufende Qualittsberwachung wird an Probekrpern ohne Vorbehandlung im Anlieferungszustanddurchgefhrt.4 Prfgerte4.1Prfgerte zur Probenvorbehandlung nach GME 60300.Issue/Ausgabe: 2Date of Issue/Ausgabedatum: 11/07Prepared/Ausgefertigt: JKRPage ofSeite 4 von 5ENGINEERINGSTANDARDSEUROPETEST METHODPRFVE

15、RFAHREN GME 602774.2 Test EquipmentA device capable of performing the press-in and extraction operation at a maximum speed of 100 mm/min(class 2 tensile testing machine to DIN 51221, part 1 or equivalent). Overall accuracy of the forcemeasuring equipment shall be 2 % of the measured value. One side

16、of the device shall be equipped witha clamping fixture capable of securely holding the clip during the press-in and extraction operation. On theother side the test panel shall be clamped. The test panel shall be made from sheet steel to QS1010ZL,thickness (0,75 0,05)mm in the area of the test hole.

17、The test panel shall be provided with a reamed anddeburred (7,3 0,05)mm in dia hole without chamfer. Care shall be taken to ensure that the clamping fixturefor the clip is in exact alignment with the hole of the test panel.Note: In principle other simplified test set-ups simulating the practical app

18、lication of the clip may be used,provided the limiting values can definitely be reached.4.3Heating oven with air circulation capable of maintaining the required temperature within 2 K.5 ProcedureThe press-in force shall be measured at (+23 5) C, the retaining force at +80 C min. The clip shall becla

19、mped into the clamping fixture of the test device and pressed into the test hole at a uniform maximumspeed of 100 mm/min. The press-in force in N shall be read from the force indicator of the test device. Fordetermining the retaining force, the clip shall be extracted from the test hole at a uniform

20、 maximum speedof 100 mm/min. The retaining force in N shall be read from the force indicator of the test device (Priortesting the retaining force the clip together with the test panel shall be stored in a heating oven for at least 1h at a temperature of +80 C min).6 Expression of ResultsWith referen

21、ce to this test method the determined individual values for press-in force and retaining forceshall be recorded in N accurate to the nearest 1 N.7 Coding SystemOn drawings the press-in force and the retaining force shall be indicated as follows: Example:7.1Press-in and retaining force to GME 60277.7

22、.1.1 Press-in force . N max7.1.2 Retaining force . N min8 DeviationsDeviations from the conditions of this test method shall have been agreed upon. These shall be specified onthe component drawings, material specifications etc. and shall be indicated on test certificates, reports etc.Issue/Ausgabe:

23、2Date of Issue/Ausgabedatum: 11/07Prepared/Ausgefertigt: JKRPage ofSeite 5 von 5ENGINEERINGSTANDARDSEUROPETEST METHODPRFVERFAHREN GME 602774.2 PrfeinrichtungEine Einrichtung mit der der Eindrck- und Ausziehvorgang mit einer Geschwindigkeit von maximal 100mm/min durchgefhrt werden kann (Geeignet ist

24、z.B. eine Zugprfmaschine der Klasse 2 nach DIN 51221,Teil 1). Genauigkeit der Kraftmessung 2 % des gemessenen Wertes. Eine Seite der Vorrichtung ist miteiner Aufnahme zu versehen, die in der Lage ist, den Klipp whrend des Eindrck- und Ausziehvorgangessicher zu halten. An der anderen Seite wird ein P

25、rfblech eingespannt. Das Prfblech aus QS 1010 ZL miteiner Dicke von (0,75 0,07) mm im Prflochbereich ist mit einer geriebenen, entgrateten jedoch nichtangefasten Bohrung von (7,3 0,05) mm versehen. Auf genaues Fluchten der Klippaufnahme mit derBohrung des Bleches ist zu achten.Hinweis: Eine vereinfa

26、chte dem praktischen Einsatz des Klipps nahekommende Prfanordnung ist zulssigsolange die Grenzwerte mit Sicherheit erreicht werden.4.3Wrmeschrank mit natrlicher Luftumwlzung, regelbar, der in der Lage ist, die geforderte Temperaturinnerhalb 2 K konstant zu halten.5 DurchfhrungDie Eindrckkraft wird b

27、ei (+23 5) C die Haltekraft bei +80C min gemessen. Der Klipp wird in dieAufnahmevorrichtung der Prfeinrichtung eingespannt und mit einer gleichbleibenden Geschwindigkeit vonmaximal 100 mm/min in das Prfloch gedrckt. Die auftretende Eindrckkraft in N wird am Kraftanzeigerder Prfeinrichtung abgelesen.

28、 Zur Ermittlung der Haltekraft wird der Klipp mit einer gleichbleibendenGeschwindigkeit von maximal 100 mm/min aus dem Prfloch herausgezogen. Die auftretende Haltekraft inN wird am Kraftanzeiger der Prfeinrichtung abgelesen. (Der Klipp mit dem Prfblech wird vor der Prfungder Haltekraft mindestens 1

29、h bei +80C min im Wrmeschrank gelagert).6 Angabe des ErgebnissesUnter Hinweis auf dieses Prfverfahren werden die ermittelten Einzelwerte angegeben. Eindrckkraft undHaltekraft in N auf 1 N gerundet.7 Angaben in ZeichnungenIn Zeichnungen wird die Eindrck- und Haltekraft z.B. wie folgt angegeben:7.1Ein

30、drck- und Haltekraft nach GME 60277.7.1.1 Eindrckkraft . N max7.1.2 Haltekraft . N min8 AbweichungenAbweichungen von den Bedingungen dieses Prfverfahrens mssen vereinbart werden. Diese sind aufTeilezeichnungen, Werkstoffvorschriften u.dergl. vorgeschrieben bzw. mssen in Prfzeugnissen, Berichtenund dergl. angegeben werden.

展开阅读全文
相关资源
猜你喜欢
  • ETSI TS 123 682-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Architecture enhancements to facilitate commuc.pdf ETSI TS 123 682-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Architecture enhancements to facilitate commuc.pdf
  • ETSI TS 124 002-2016 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE GSM - UMTS Public Land Mobile Network (PLMN) .pdf ETSI TS 124 002-2016 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE GSM - UMTS Public Land Mobile Network (PLMN) .pdf
  • ETSI TS 124 002-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE GSM - UMTS Public Land Mobile Network (PLMN) .pdf ETSI TS 124 002-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE GSM - UMTS Public Land Mobile Network (PLMN) .pdf
  • ETSI TS 124 002-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE GSM - UMTS Public Land Mobile Network (PLMN) .pdf ETSI TS 124 002-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE GSM - UMTS Public Land Mobile Network (PLMN) .pdf
  • ETSI TS 124 002-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE GSM - UMTS Public Land Mobile Network (PLMN) _1.pdf ETSI TS 124 002-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE GSM - UMTS Public Land Mobile Network (PLMN) _1.pdf
  • ETSI TS 124 007-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Mobile radio interface signalling layer 3 Gen.pdf ETSI TS 124 007-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Mobile radio interface signalling layer 3 Gen.pdf
  • ETSI TS 124 007-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Mobile radio interface signalling layer 3 Gen.pdf ETSI TS 124 007-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Mobile radio interface signalling layer 3 Gen.pdf
  • ETSI TS 124 007-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Mobile radio interface signalling layer 3 Gen_1.pdf ETSI TS 124 007-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Mobile radio interface signalling layer 3 Gen_1.pdf
  • ETSI TS 124 008-2016 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Mobile radio interface Layer 3 specification .pdf ETSI TS 124 008-2016 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Mobile radio interface Layer 3 specification .pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1