1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards DRAWING REVISIONS Do Not Use on New Programs. Being Replaced by Global Design Standards EDS-A-1007 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 (Superceded) EDS-A-1007DRAWING REVISIONS PAGE: 1/12 IS
2、SUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project drawings generated by CATIA. It is Superceded for all future projects and replaced by Global Design Standards. 1. PURPOSE This standard aims at correc
3、tly conveying the contents of drawing revisions resulting from a variety of reasons, such as the quality improvement, productivity enhancement and cost and weight reduction, and keeping the reasons and history of drawing revision. 2. SCOPE 2.1. This standard applies to product drawings (hereinafter
4、called “drawings“) released to the Engineering Change Procedures, and may also apply to the layout and package drawings. 2.2. It applies to cases where any letters and figures in the drawing are changed, added, deleted or re-generated. 3. TYPES OF DRAWING REVISION 3.1. Revision of drawing : when the
5、 original drawing is changed as follows: 3.1.1. Change in drawing contents 3.1.2. Addition of drawing contents 3.1.3. Deletion of drawing contents 3.2. Remaking of drawing : when a drawing is redrawn while keeping the previous drawing number 3.2.1. Redrawn with change 3.2.2. Redrawn without change 4
6、. NOTES IN DRAWING REVISION 4.1. Revision shall be made in conformity with the latest drawing standards. 4.2. Relations with other parts, development, assembly, maintenance and other overall effects shall be reviewed fully and carefully. 4.3. The original drawing shall not be damaged and the un-revi
7、sed portions shall not be erased. 4.4. The type of letters and the thickness of lines shall be as similar to the original drawings as possible. 4.5. When parts drawings are revised, the related assembly, instruction or installation drawings shall also be revised. EDS-A-1007DRAWING REVISIONS PAGE: 2/
8、12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology 4.6. In the following cases, the revised drawing shall have a new part number or drawing number, not the existing part number or drawing number. 4.6.1. When performance or durability is influenced to an ex
9、tent that existing parts must be scrapped in order to ensure safety or to supplement insufficient function. 4.6.2. When full compatibility with the existing part is not ensured after revision in terms of performance and mounting condition due to changes in part dimensions, material or other characte
10、ristics. 5. REVISION METHOD 5.1. Order of revision registration 5.1.1. Revisions shall be registered from the bottom to the top of the revision table. When the revisions are made frequently to fill up the revision blocks, a new drawing is to be made in principle. 5.1.2. When revisions ought to be re
11、gistered in the same drawing for special reasons, they shall be continued in new blocks just left to them from the left top to the bottom as shown in Fig. 1. Fig. 1. Order of revision registration 5.2. Drawing revision table 5.2.1. All blocks in the revision table shall be filled. Blocks not requiri
12、ng entering shall be filled with a dash or vertical line. 5.2.2. In case a number of revision items occur at the same time, or when the recording must be made through several lines, the date, sign, and ECR number are entered only at the top line and a vertical line is drawn throughout related column
13、s. EDS-A-1007DRAWING REVISIONS PAGE: 3/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology Fig. 2. Example of revision 5.3. Revision record column 5.3.1. Contents of revision shall be entered in English in a simple and clear manner in principle. When requir
14、ed, both English and Koreans letters may be entered together. 5.3.2. The initial release shall be identified according to the drawing release procedure. (1) PROTO EPI RELEASE : Drawing release for preview of prototype product (2) PROTO RELEASE : Drawing release for prototype product (3) PRODUCTION E
15、PI RELEASE : Drawing release for preview of mass-production product (4) PRODUCTION RELEASE : Drawing release for mass-production product 5.3.3. In case of revision from PROTO EPI RELEASE to PROTO RELEASE, from PROTO RELEASE to PRODUCTION EPI RELEASE, and from PRODUCTION EPI RELEASE to PRODUCTION REL
16、EASE, drawings shall be released after contents of revision is arranged in the revision table in principle. Drawing revision history may be left intact for special purposes (Ex: When working method and drawing revision history are required due to production line installation, part manufacturing proc
17、edure, etc.). Note) EPI : ENGINEERING PRELIMINARY RELEASE Fig. 3. Example of revision history left by release stage EDS-A-1007DRAWING REVISIONS PAGE: 4/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology Fig. 4. Example of revision history left by release s
18、tage Fig .5. Example of release after arrangement of revision history 5.3.4. Such words as CHANGED, DELETED, and ADDED shall not be used it self. (1) Record in case of adding contents of drawing REMARK ADDED PART NO ADDED DIMENSION ADDED SECT BB ADDED (2) Record in case of changing contents of drawi
19、ng WAS 750.1 WAS 96108367 MATL WAS SCP 1 CHANGED ACC TO 96000135 WAS LOCATION HOLE Note) ACC TO : ACCORDING TO (3) Record in case of deleting contents of drawing DIMENSION 750.5 DELETED 13 HOLE DELETED HARDNESS SPEC DELETED SECT CC DELETED Fig. 6. Examples of records in drawings EDS-A-1007DRAWING RE
20、VISIONS PAGE: 5/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology 5.3.5. Long contents are entered in two lines bundled by s square bracket on the left. 5.3.6. When the upper and lower tolerances are changed, they shall be recorded in a line continuously,
21、 not in the top and bottom. 5.3.7. When the form tolerance is changed, it shall be recorded as follows. Ex) WAS 0.25 A B Fig.7. Drawing revision record 5.4. Authority column 5.4.1. The ECR (ENGINEERING CHANGE RECOMMENDATION) number relating to the revision shall be entered by the design engineer. 5.
22、4.2. In case an ECR involves several drawing revisions, the ECR number is entered in the top line, and a vertical line is drawn downwards. Fig. 8. Record of related authority EDS-A-1007DRAWING REVISIONS PAGE: 6/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Techn
23、ology 5.5. Symbol column 5.5.1. The revision number starts from “1“ in the numerical order. 5.5.2. When a previously revised item in the same zone is revised again, the same previous number shall be used. Fig. 9. Revision of same contents. 5.6. Indication of revision symbol in drawing 5.6.1. Symbols
24、 at the changed position in the drawing shall be indicated inside a circle. d=8.0mm when h=3.5mm d=10.0mm when h=5.0mm 5.6.2. The revision symbol shall be indicated outside the part outline as long as possible and not be overlapped with other letters. 5.6.3. A revision symbol shall be indicated at o
25、ne place on a drawing in principle. When the same content is revised at several places on a drawing, it shall be entered just once in the revision record column, and the revision symbol shall be indicated at each revised portion. For example, “SURFACE TEXTURE SPEC. ADDED, 5 PLACES“ is recorded in th
26、e drawing revision record column, and the revision symbol is indicated at five places where surface texture specification is added. 5.6.4. When a revision requires correction of several places in a drawing, the revision symbol is indicated at one most easily recognizable place. d5 h EDS-A-1007DRAWIN
27、G REVISIONS PAGE: 7/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology 5.7. Zone column 5.7.1. For easy identification of revision symbols on a drawing, the width and length zone numbers, which are marked along the drawing border, are entered in a way that
28、 the width letter (alphabets) precedes the length number. Fig. 10. Zone column 5.7.2. When the contents in the table of a drawing are changed, the revision symbol and zone are not entered but the revised portion is entered specifically in the revision table. Fig. 11. Change of table 5.7.3. When it i
29、s difficult to recognize the position of the table in a drawing or when a drawing has several tables, the position of tables changed shall be entered in the revision zone column. Fig. 12. Change of table EDS-A-1007DRAWING REVISIONS PAGE: 8/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERS
30、ION: 4 GM DAEWOO Auto & Technology 5.8. Date column 5.8.1. The ECR issue date shall be entered by the design engineer in the order of day (two digit figure), month (two alphabetical letters) and year (last two digits of a year). 5.8.2. Abbreviation for month January: JA, February: FE, March: MR, Apr
31、il: AP, May: MY, June: JU, July: JL, August: AU September: SE, October: OC, November: NO, December: DE Fig. 13. Indication of date 5.9. Signature column 5.9.1. In each of signature columns, the following responsible persons shall put their signatures after confirming the contents. DS : Designer CK :
32、 Checker AP : Approver Fig. 14. Indication of date APPROVER CHECKER DESIGNER EDS-A-1007DRAWING REVISIONS PAGE: 9/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology 6. REDRAWING METHOD In principle, drawings are re-made in the following cases. 6.1. When the
33、 original drawing is lost 6.2. When the original drawing is polluted or damaged to an extent that reproduction is impossible or contents are illegible after reproduction 6.3. After several revisions, or in case a revision requires so many changed portions as to make revision of original drawings nea
34、rly impracticable 6.3.1. Redrawn with change (1) Contents of drawing revision before re-drawing are not recorded in principle. (2) The title block and revision table shall be filled in by the drafter, design engineer, reviewer and approver of drawings at the time of re-drawing. (3) The date when the
35、 re-drawing is completed shall be entered in the drawing date column of the title block. (4) In the first line of the drawing revision table, the initial release date of the original drawing and ECR number shall be entered. (5) In the second line, the latest revision date of the original drawing and
36、 ECR number shall be entered. In the remaining columns of the line, dashes shall be put. (6) In the third line, “REDRAWN“ is entered. In the next line, the contents of drawing revision are entered. Others are the same as in clause 5 “REDRAWING METHOD”. Fig. 15. Redrawn with change EDS-A-1007DRAWING
37、REVISIONS PAGE: 10/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology (7) In case of a large revision contents at re-drawing, only major items shall be entered. Fig. 16. Recording a large revision contents at re-drawing 6.4. Redrawn without change 6.4.1. “
38、REDRAWN W/O CHANGE“ shall be entered in the drawing revision table. 6.4.2. Others are the same as in clause 6.3.1 Redrawn with change. Fig. 17. Redrawn without change 6.5. Re-drawing detail drawings When it is necessity to make a separate detail drawing of a part whose specifications were contained
39、in another drawing, Fig. 18 shall be followed. Note) NDS : NO DRAWING SEE Fig. 18. Re-drawing detail drawings EDS-A-1007DRAWING REVISIONS PAGE: 11/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology 6.6. Handling of original drawing The original drawing bef
40、ore redrawing shall be marked as in Fig. 19 and handed over to the ERS engineer after signing along with the redrawn drawing. Fig. 19 EDS-A-1007DRAWING REVISIONS PAGE: 12/12 ISSUED DATE: 1990. 06. 28 REVISED DATE: 2008. 05. 31 VERSION: 4 GM DAEWOO Auto & Technology 7. REVISION AND REDRAWING OF CAD D
41、RAWING 7.1. In case of revising drawings made by CAD, CAD data shall be revised accordingly. 7.2. When the entire drawing is plotted again after CAD data is corrected, clause 5 “REVISION METHOD” shall be followed. The design engineer at the time of final revision shall check all items and put his si
42、gn in the signature column of the title block and the top signature line of the drawing revision table. (See Fig. 20) Fig. 20. Re-plotting of a drawing after CAD data correction 7.3. In case of re-making CAD drawings, clause 6 “REDRAWING METHOD” shall be followed. 8. REVISION OF DRAWINGS OF AFFILIATED COMPANIES When drawings of an affiliated company are revised by GMDAT, revision shall be conform to the DMS-E04-01(PREPARING APPROVED PART DRAWINGS).