GMKOREA EDS-T-5711-2008 TEST STANDARD OF SLOW BLOW FUSE.pdf

上传人:appealoxygen216 文档编号:757184 上传时间:2019-01-19 格式:PDF 页数:11 大小:203.33KB
下载 相关 举报
GMKOREA EDS-T-5711-2008 TEST STANDARD OF SLOW BLOW FUSE.pdf_第1页
第1页 / 共11页
GMKOREA EDS-T-5711-2008 TEST STANDARD OF SLOW BLOW FUSE.pdf_第2页
第2页 / 共11页
GMKOREA EDS-T-5711-2008 TEST STANDARD OF SLOW BLOW FUSE.pdf_第3页
第3页 / 共11页
GMKOREA EDS-T-5711-2008 TEST STANDARD OF SLOW BLOW FUSE.pdf_第4页
第4页 / 共11页
GMKOREA EDS-T-5711-2008 TEST STANDARD OF SLOW BLOW FUSE.pdf_第5页
第5页 / 共11页
点击查看更多>>
资源描述

1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards TEST STANDARD OF SLOW BLOW FUSE Do Not Use on New Programs. Being Replaced by GMW3172 EDS-T-5711 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 (Superceded) EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE P

2、AGE: 1/10 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project (incl. T255 Program). It is Superceded for all future projects and replaced by GMW3172. 1. PURPOSE This standard aims at specifying the pr

3、ocedures of testing whether slow blow tubes used for vehicles manufactured by GMDAT are appropriate. 2. SCOPE This standard applies to test for checking appropriateness of slow blow tubes at new car development or at engineering change of the fuse for production vehicles. 3. TEST EQUIPMENT 3.1. Powe

4、r supply - DC 24V/200A 3.2. Oscilloscope 3.3. Recorder 3.4. Electric load 3.5. Digital multimeter 3.6. Tension tester 3.7. Thermostatic chamber 3.8. Composite environment chamber 3.9. Slide calipers, project 3.10. Vibration equipment 4. TEST ITEM 4.1. Basic performance test 4.1.1. Appearance inspect

5、ion (1) Test method: Inspect visually or by feel under luminous intensity of at least 300LX (2) Evaluation standard: The sample shall show no signs of flaw, breakage, burr, rust, etc. that mars appearance and functions. EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE PAGE: 2/10 ISSUED DATE: 1999. 08. 20 R

6、EVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology 4.1.2. Fusing part visibility test (1) Test method: Visually inspect from above the fuse upper surface. (2) Evaluation standard: The element fusing part shall be clearly seen through the cover. 4.1.3. Terminal insertion/removal force t

7、est (1) Test method 1) While applying a force perpendicularly to each terminal, insert/remove the fuse into/from the measuring instrument. 2) Apply the force at a constant speed of 50 150mm/min. (2) Evaluation standard 1) Insertion force of the () terminal for connection into the mating (+) terminal

8、 shall be 4.5Kgf. 2) The detachment force shall be 1 2.5 Kgf. 4.1.4. Cover detachment strength test (1) Test method 1) With the housing fixed, apply a tensile force to the cover. 2) Apply the force at a constant speed of 50 150mm/min (2) Evaluation standard: The tensile detachment strength of the co

9、ver from the housing shall be a minimum of 1Kgf. 4.1.5. Lens breaking strength test (1) Test method 1) With the housing fixed, apply a perpendicular force to each terminal from below. 2) Apply the force at a constant speed of 50 150mm/min (2) Evaluation standard: The breaking strength of the element

10、 and housing lens shall be a minimum of 6Kgf. 4.1.6. Impact strength test (1) Test method: Drop the sample from a height of 1m onto the concrete floor. (2) Evaluation standard: The sample shall show no signs of bending of the terminal and damage or breakage of the housing that mars functions. 4.1.7.

11、 Breaking strength test (1) Test method: Apply a compressive force to the upper and lower ends of the fuse. (2) Evaluation standard: The insertion breaking strength of the fuse shall be a minimum of 20Kgf. 4.1.8. Heat resistance test (1) Test method: Expose the sample to the ambient temperature of 1

12、20 for 100 hours. (2) Evaluation standard: The sample shall show no signs of defects, such as corrosion, breakage and deformation, which mar functions. 4.1.9. Cold resistance test (1) Test method: Expose the sample to the ambient temperature of -40 for 24 hours. EDS-T-5711TEST STANDARD OF SLOW BLOW

13、FUSE PAGE: 3/10 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology (2) Evaluation standard: The sample shall show no signs of defects, such as corrosion, breakage and deformation, which mar functions. 4.1.10. Oil resistance test (1) Test method: After applyin

14、g engine oil and antifreeze to the sample, expose it to the ambient temperature of 120 for 24 hours. (2) Evaluation standard: The sample shall show no signs of defects, such as corrosion, breakage and deformation, which mar functions. 4.1.11. Indication inspection (1) Test method: Inspect visually u

15、nder luminous intensity of at least 300LX. (2) Evaluation standard: Indication of the rated current and reading shall be clear to avoid misunderstanding. 4.2. Electric performance, environmental, durability test 4.2.1. Voltage drop (1) Test method: After having the current equivalent to 50%, 70%, an

16、d 100% of the rated current flow through the fuse for 15minutes, measure the voltage drop between fuse terminals at the measuring points shown in the attached sketch #2. (2) Evaluation standard Transmission rate Maximum voltage drop 50% 100mV 70% 150mV 100% 250mV 4.2.2. Fusing performance test (1) T

17、est method: By having the rated current flow through the fuse, measure the time from start of flow to fusing. Measure the insulation resistance after fusing 1 minute after fusing with a 500V insulation resistance meter. (2) Evaluation standard 1) When the current equivalent to 110% of the rated curr

18、ent flows through it, the fuse shall not blow within 100 hours. 2) When the current equivalent to 135% of the rated current flows through it, the fuse shall blow within 60 1800 seconds. 3) When the current equivalent to 200% of the rated current flows through it, the fuse shall blow within 2 60 seco

19、nds. 4) When the current equivalent to 355% of the rated current flows through it, the fuse shall blow within 0.2 7 seconds. 5) When the current equivalent to 600% of the rated current flows through it, the fuse shall blow within 0.04 1 second. 6) After fusing of the fuse according to 2) 5), the ins

20、ulation resistance between terminals shall not be smaller EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE PAGE: 4/10 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology than 1.0 . Also, the housing shall not be damaged at fusing. 4.2.3. Temperature rise (1) Test met

21、hod: After having the current equivalent to 50% and 70% of the rated current flow through the fuse for 20 minutes, measure the temperature rise at the measuring point of fuse terminals shown in the attached sketch #2. (2) Evaluation standard Transmission rate Temperature rise 50% 40 70% 60 4.2.4. Vi

22、bration durability performance (1) Test method: After placing the fuse onto the vibration test stand and fixing the advancement range to 1.5mm, apply vibration in 3 mutually perpendicular directions for 2 hours respectively to make a total of 6 hours by changing the frequency between 10Hz55Hz evenly

23、 with sweeping time of 1 minute. (2) Evaluation standard: During and after test, the sample shall show no signs of abnormalities, such as loosening and breakage, and after test meet the requirements in 4.2.2. 4.2.5. Current ON/OFF durability performance test (1) Test method: With the current equival

24、ent to 50% of the rated current ON for 5 minutes and OFF for 10 minutes to the fuse as a cycle, perform a total of 10,000cycles. (2) Evaluation standard: During and after test, the sample shall show no signs of abnormalities, such as breakage and fusing. 4.2.6. Over-current durability performance (1

25、) Test method: Perform 20,000cycles of ON/OFF of excessive current to the fuse as shown in Fig 1. (2) Evaluation standard: During and after test, the sample shall show no signs of abnormalities, such as breakage and fusing, and after test meet the requirements in 4.2.2. 4.2.7. Power window actual wa

26、veform durability performance (less than 30A) EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE PAGE: 5/10 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology (1) Test method: Perform 5,000cycles of applying P/W actual waveform to the fuse as shown below. (2) Evaluati

27、on standard: During and after test, the sample shall show no signs of abnormalities, such as breakage and fusing, and after test meet the requirements in 4.2.2. 4.2.8. Thermal impact resistance test (1) Test method: With the exposure of the fuse to ambient temperature of - 40 1 for 30 minutes and su

28、bsequent exposure to 100 1 for 30 minutes as 1 cycle, perform 1,000 cycles. Change from -40 to 100 shall be carried out within 30 seconds. (2) Evaluation standard: During and after test, the sample shall show no signs of abnormalities, such as breakage and fusing, and after test meet the requirement

29、s in 4.2.2. 4.2.9. Dust resistance test (1) Test method: The dust resistance test of the fuse shall be based on KSR 1063 Generals Rules for Dust Test of Automobile parts. The fuse shall be placed laterally on a grid (wood sticks webbed in mutually perpendicular directions). (2) Evaluation standard:

30、During and after test, the sample shall show no signs of abnormalities, such as breakage and fusing, and after test meet the requirements in 4.2.2. 4.2.10. Temperature / humidity resistance test (1) Test method 1) With the fuse placed inside a thermostatic chamber under the following condition as 1

31、cycle, perform 15 cycles. 2) Condition a. 1 cycle : . 16hours +801 Humidity : 95 % Min. . 2hours +401 . 2hours +1201 . 4hours +19 29 b. Total no of cycles : 15cycle (360 hours) EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE PAGE: 6/10 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAE

32、WOO Auto & Technology (2) Evaluation standard: During and after test, the sample shall show no signs of abnormalities, such as breakage and fusing, and after test meet the requirements in 4.2.2. 4.2.11. Composite environmental performance test (1) Test method: With the fuse placed on the vibration t

33、est stand, apply vibration at 801 with the vibrating frequency of 20Hz 200Hz, sweep time of 3 minutes and vibrating acceleration of 44.1h 4.5G and simultaneously perform 45 minutes ON and 15 minute OFF of the current equivalent to 50% of the rated current to the fuse. With this as 1 cycle, perform 3

34、00 cycles. (2) Evaluation standard: During and after test, the sample shall show no signs of abnormalities, such as breakage and fusing, and after test meet the requirements in 4.2.2 and 4.2.3. 4.3. Instructions in test 4.3.1. The test shall be conducted under the following conditions: 4.3.2. The am

35、bient temperature shall be 21 to 27 and there shall be no wind. If other separate conditions are set, however, these shall be y will be followed. 4.3.3. All tests shall be conducted with the fuse placed laterally. 4.3.4. For electric tests, the fuse shall be mounted on the test jig shown in the atta

36、ched sketch #2. 4.3.5. The cable used for electric tests shall conform to KS C 3311. 4.3.6. When the test is conducted with two or more fuses connected, an interval of at least 300mm shall be provided between them and a cable of at least 1,000mm long shall be used for connection. 4.4. Supplementary

37、provision Addition of test items or omission of unnecessary items may be determined following an agreement with the design engineer. 5. NO OF TEST SAMPLES Test areas Items Test samples Appearance inspection S1 S420 Fusing part visibility S1 S420 Indication inspection S1 S420 Terminal insertion/remov

38、al force S1 S5 Cover detachment strength S6 S10 Lens breaking strength S11 S15 Impact strength S16 S20 Breaking strength S21 S25 Heat resistance test S26 S30 Cold resistance test S31 S35 Basic performance test Cold resistance test S36 S40 EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE PAGE: 7/10 ISSUED D

39、ATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Test areas Items Test samples Voltage drop test S41 S50 Fusing performance test S51 S95 (1) 110% fusing S51 S55 (2) 135% fusing S56 S65 (3) 200% fusing S66 S75 (4) 355% fusing S76 S85 (5) 600% fusing S86 S95 (6) Insu

40、lation resistance S51 S95 Temperature rise test S51 S95 Vibration durability performance test S96 S140 (1) 110% fusing S96 S100 (2) 135% fusing S101 S110 (3) 200% fusing S111 S120 (4) 355% fusing S121 S130 (5) 600% fusing S131 S140 (6) Insulation resistance S96 S140 Current ON/OFF durability perform

41、ance test S141 S150 Over-current durability performance test S151 S195 (1) 110% fusing S151 S155 (2) 135% fusing S156 S165 (3) 200% fusing S166 S175 (4) 355% fusing S176 S185 (5) 600% fusing S186 S195 (6) Insulation resistance S151 S195 P/W actual waveform durability performance test S196 S240 (1) 1

42、10% fusing S196 S200 (2) 135% fusing S201 S210 (3) 200% fusing S211 S220 (4) 355% fusing S221 S230 (5) 600% fusing S231 S240 (6) Insulation resistance S196 S240 Thermal impact resistance test S241 S285 (1) 110% fusing S241 S245 (2) 135% fusing S246 S255 (3) 200% fusing S256 S265 (4) 355% fusing S266

43、 S275 (5) 600% fusing S276 S285 Electric performance, environmental, durability test (6) Insulation resistance S241 S285 EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE PAGE: 8/10 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Test areas Items Test samples Dust

44、 resistance test S286 S330 (1) 110% fusing S286 S290 (2) 135% fusing S291 S300 (3) 200% fusing S301 S310 (4) 355% fusing S311 S320 (5) 600% fusing S321 S330 (6) Insulation resistance S286 S330 Temperature/humidity resistance test S331 S375 (1) 110% fusing S331 S335 (2) 135% fusing S336 S345 (3) 200%

45、 fusing S346 S355 (4) 355% fusing S356 S365 (5) 600% fusing S366 S375 (6) Insulation resistance S331 S375 Composite environmental durability test S376 S420 (1) 110% fusing S376 S380 (2) 135% fusing S381 S390 (3) 200% fusing S391 S400 (4) 355% fusing S401 S410 (5) 600% fusing S411 S420 (6) Insulation

46、 resistance S376 S420 Electric performance, environmental, durability test (7) Temperature rise test (section 4.2.3) S376 S420 EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE PAGE: 9/10 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Attached sketch #1 EDS-T-5711TEST STANDARD OF SLOW BLOW FUSE PAGE: 10/10 ISSUED DATE: 1999. 08. 20 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Attached sketch #2

展开阅读全文
相关资源
猜你喜欢
  • FORD ESB-M1L77-A2-2003 CABLE LOW TENSION VINYL INSULATED STRANDED FLEXIBLE  TO BE USED WITH FORD WSS-M99P1111-A  《柔性绞合乙烯基塑料绝缘的低压电缆  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD ESB-M1L77-A2-2003 CABLE LOW TENSION VINYL INSULATED STRANDED FLEXIBLE TO BE USED WITH FORD WSS-M99P1111-A 《柔性绞合乙烯基塑料绝缘的低压电缆 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD ESB-M1L85-A-2006 CABLE-LOW TENSION POLYETHYLENE INSULATED C BARE  TO BE USED WITH FORD WSS-M99P1111-A  《聚乙烯绝缘的裸露低压电缆  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD ESB-M1L85-A-2006 CABLE-LOW TENSION POLYETHYLENE INSULATED C BARE TO BE USED WITH FORD WSS-M99P1111-A 《聚乙烯绝缘的裸露低压电缆 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD ESB-M1L85-B-2010 CABLE-LOW TENSION POLYETHYLENE INSULATED (THIN WALL) - BARE  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on FORD ESB-M1L85-A)《聚乙烯绝缘(薄壁)的裸低压电缆  与标准FORD WSS-M99.pdf FORD ESB-M1L85-B-2010 CABLE-LOW TENSION POLYETHYLENE INSULATED (THIN WALL) - BARE TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD ESB-M1L85-A)《聚乙烯绝缘(薄壁)的裸低压电缆 与标准FORD WSS-M99.pdf
  • FORD ESB-M1L85-C-2003 CABLE-LOW TENSION POLYETHYLENE INSULATED (EXTRA THIN WALL) - BARE  TO BE USED WITH FORD WSS-M99P1111-A  《聚乙烯绝缘(超薄壁型)的裸露低压电缆  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD ESB-M1L85-C-2003 CABLE-LOW TENSION POLYETHYLENE INSULATED (EXTRA THIN WALL) - BARE TO BE USED WITH FORD WSS-M99P1111-A 《聚乙烯绝缘(超薄壁型)的裸露低压电缆 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD ESB-M1L85-D-2003 CABLE STRANDED (FLEXIBLE) LOW TENSION POLYETHYLENE INSULATED (THIN WALL) BARE  TO BE USED WITH FORD WSS-M99P1111-A  《聚乙烯绝缘(薄壁型)的裸露低压绞合(柔性)电缆  与标准FORD WSS-M99P.pdf FORD ESB-M1L85-D-2003 CABLE STRANDED (FLEXIBLE) LOW TENSION POLYETHYLENE INSULATED (THIN WALL) BARE TO BE USED WITH FORD WSS-M99P1111-A 《聚乙烯绝缘(薄壁型)的裸露低压绞合(柔性)电缆 与标准FORD WSS-M99P.pdf
  • FORD ESB-M1L86-A-2006 CABLE-LOW TENSION POLYETHYLENE INSULATED - TINNED  TO BE USED WITH FORD WSS-M99P1111-A  (Shown on ESB-M1L85-A)《聚乙烯绝缘的镀锡低压电缆  与标准FORD WSS-M99P1111-A一起使用  列于标准E.pdf FORD ESB-M1L86-A-2006 CABLE-LOW TENSION POLYETHYLENE INSULATED - TINNED TO BE USED WITH FORD WSS-M99P1111-A (Shown on ESB-M1L85-A)《聚乙烯绝缘的镀锡低压电缆 与标准FORD WSS-M99P1111-A一起使用 列于标准E.pdf
  • FORD ESB-M1P15-A-2010 PLATING NICKEL CHROME - RUSTLESS STEEL SCREWS  TO BE USED WITH FORD WSS-M99P1111-A  《镍铬合金电镀不锈钢螺钉  与福特WSS-M99P1111-A  一起使用》.pdf FORD ESB-M1P15-A-2010 PLATING NICKEL CHROME - RUSTLESS STEEL SCREWS TO BE USED WITH FORD WSS-M99P1111-A 《镍铬合金电镀不锈钢螺钉 与福特WSS-M99P1111-A 一起使用》.pdf
  • FORD ESB-M1P17-A-2006 PLATING CHROMIUM - DECORATIVE INTERIOR - COPPER - NICKEL - STEEL  TO BE USED WITH FORD WSS-M99P1111-A  《铜-镍-钢用内部装饰用铬镀层  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD ESB-M1P17-A-2006 PLATING CHROMIUM - DECORATIVE INTERIOR - COPPER - NICKEL - STEEL TO BE USED WITH FORD WSS-M99P1111-A 《铜-镍-钢用内部装饰用铬镀层 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD ESB-M26J200-A-2012 ENAMEL VINYL BAKING - INTERIOR QUALITY  TO BE USED WITH FORD WSS-M99P1111-A  .pdf FORD ESB-M26J200-A-2012 ENAMEL VINYL BAKING - INTERIOR QUALITY TO BE USED WITH FORD WSS-M99P1111-A .pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1