GMW GMW16994-2013 Double Vision Inspection Procedure For Windshields Issue 1 English [Replaced GMNA GM9628P GMNA GM9628P].pdf

上传人:赵齐羽 文档编号:757962 上传时间:2019-01-19 格式:PDF 页数:4 大小:235.80KB
下载 相关 举报
GMW GMW16994-2013 Double Vision Inspection Procedure For Windshields Issue 1 English [Replaced GMNA GM9628P GMNA GM9628P].pdf_第1页
第1页 / 共4页
GMW GMW16994-2013 Double Vision Inspection Procedure For Windshields Issue 1 English [Replaced GMNA GM9628P GMNA GM9628P].pdf_第2页
第2页 / 共4页
GMW GMW16994-2013 Double Vision Inspection Procedure For Windshields Issue 1 English [Replaced GMNA GM9628P GMNA GM9628P].pdf_第3页
第3页 / 共4页
GMW GMW16994-2013 Double Vision Inspection Procedure For Windshields Issue 1 English [Replaced GMNA GM9628P GMNA GM9628P].pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW16994 Double Vision Inspection Procedure For Windshields Copyright 2013 General Motors Company All Rights Reserved December 2013 Page 1 of 4 1 Scope Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of con

2、flict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. This document is the GM Worldwide Glazing Testing Standard. Its purpose is to establish a common test methodology for Glazing Materials to ensure that a high quality world class system is consis

3、tently developed and produced. This standard describes the test method used to inspect for double vision in automotive windshields. This is a living document and any suggestions or revisions will be reviewed and/or updated annually by the Fixed Glass Global Subsystem Leadership Team (GSSLT). 1.2 For

4、eword. This is a component/subsystem test. 1.3 Applicability. This standard is applicable for all passenger vehicles, multipurpose passenger vehicle (MPV), and truck models with heated grid elements in fixed glass and produced by GM worldwide. 2 References Note: Only the latest approved standards ar

5、e applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW3600 2.3 Additional References. GM Security Guidelines Subsystem Technical Specifications (SSTS) 3 Resources 3.1 Facilities. 3.1.1 Calibration. The test facilities and equipment s

6、hall be in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with respect to their physical definition. 3.2 Equipmen

7、t. 3.2.1 A light box consisting of a 25 W light source mounted behind a No. 3480 Corning yellow-red glass or equivalent. 3.2.2 A 12.7 mm diameter light aperture positioned at the front of the light box. Centered on the aperture is a 102 mm diameter circle. 3.2.3 Test shall be performed in a dimly li

8、t room. See Figure 1 for test setup. 3.3 Test Vehicle/Test Piece. Test samples shall be of production intent design and material for design validation (DV); or, production intent design and materials manufactured with production processes (home line) for product validation (PV). Any changes to the c

9、omponents or material, e.g., design, fit, form, function, properties, manufacturing process, and/or location of manufacture require revalidation. GM shall approve Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking per

10、mitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16994 Copyright 2013 General Motors Company All Rights Reserved December 2013 Page 2 of 4 validation methods for product/process changes before the supplier is committed to the change. Refer to GMW3600. 3.4 Test Time. Calendar

11、 time: 1 day Test hours: 8 hours Coordination hours: 4 hours 3.5 Test Required Information. Review GM Security Guidelines. Note: The supplier shall work with the GM Design Responsible Engineer to comprehend this requirement. 3.6 Personnel/Skills. Not applicable. 4 Procedure 4.1 Preparation. 4.2 Cond

12、itions. All conditions specified shall be targeted toward the specified value with any given tolerance () used to compensate for variation. During testing, conditions specified shall not be readjusted within the tolerance unless it is to maintain the particular test condition within the specified to

13、lerance. If such an adjustment is made, it shall be approved by the appropriate GM engineer prior to the start of any testing. Unless otherwise specified, perform the tests in the as received condition without any special pre-conditioning. 4.2.1 Environmental Conditions. The following conditions app

14、ly to all tests unless otherwise specified: Temperature: +23 C 3 C. Humidity 20% to 70% unless otherwise specified. 4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, rep

15、orts, etc. 4.3 Instructions. 4.3.1 Position the windshield at the specified installation angle with the horizontal centerline parallel to the target and normal to the observers line of sight. 4.3.2 The light box should be positioned 7.6 m away from the windshield with the aperture located in the lin

16、e of sight according to Figure 1. 4.3.3 From a position 600 mm behind the drivers eye position the observer, using one eye only, evaluates any shift of the secondary image of the 12.7 mm dot. 4.3.4 The step described in 4.3.2 is repeated for the passenger side of the vehicle. Figure 1: Windshield Do

17、uble Vision Standard Setup Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16994 Copyright 2013 General Motors Company All Rights Reserve

18、d December 2013 Page 3 of 4 5 Data 5.1 Calculations. Not applicable. 5.2 Interpretation of Results. Acceptance Criteria: There is only one secondary image. The entire secondary image is with in the 102 mm diameter circle. Figure 2 identifies interpretation of the results. Figure 2: Interpretation of

19、 Results 5.3 Test Documentation. Record all test results and include in the test report. Include photographs of the test setup and the individual test results. The Supplier shall write evaluation reports to document the results of all validation activities and shall make the test results and evaluat

20、ion reports available to GM Engineers upon request. See GMW3600. All test reports are to be in English. The following is also required for ALL test reports: Procedure number and section numbers on all test reports. Requirement being met and Subsystem Technical Specification (SSTS) requirement number

21、. All test parameters for environment and equipment. Any authorized deviations to the plan. 6 Safety This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the us

22、er of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 7 Notes 7.1 Glossary. 5-Phase document: Supplier to use current approved 5-Phase to be provided by GM Product Engineering. 5-Phase to include at a minimum:

23、 1. Issue Description. 2. Root Cause Analysis. 3. Containment. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16994 Copyright 2013 Gener

24、al Motors Company All Rights Reserved December 2013 Page 4 of 4 4. Implementation. 5. Evaluation/Validation. 7.2 Acronyms, Abbreviations, and Symbols. DRE Design Release Engineer DV Design Validation GSSLT Global Subsystem Leadership Team IR Infrared MPV Multipurpose Passenger Vehicle PV Product Val

25、idation SSTS Subsystem Technical Specification SVE Subsystem Validation Engineer VTS Vehicle Technical Specification 8 Coding System This standard shall be referenced in other documents, drawings, etc., as follows: Test to GMW16994 9 Release and Revisions This standard was originated in June 2013. I

26、t was first approved by the Fixed Glass GSSLT in November 2013. It was first published in December 2013. Issue Publication Date Description (Organization) 1 DEC 2013 Initial publication. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ANSI ASTM D2152-2013 Standard Test Method for Adequacy of Fusion of Extruded Poly(Vinyl Chloride) (PVC) Pipe and Molded Fittings by Acetone Immersion《利用丙酮浸泡法浸入挤压聚氯乙烯(PVC)管材和模铸管件熔解充.pdf ANSI ASTM D2152-2013 Standard Test Method for Adequacy of Fusion of Extruded Poly(Vinyl Chloride) (PVC) Pipe and Molded Fittings by Acetone Immersion《利用丙酮浸泡法浸入挤压聚氯乙烯(PVC)管材和模铸管件熔解充.pdf
  • ANSI ASTM D2152-2017 Standard Test Method for Adequacy of Fusion of Extruded Poly(Vinyl Chloride) (PVC) Pipe and Molded Fittings by Acetone Immersion.pdf ANSI ASTM D2152-2017 Standard Test Method for Adequacy of Fusion of Extruded Poly(Vinyl Chloride) (PVC) Pipe and Molded Fittings by Acetone Immersion.pdf
  • ANSI ASTM D2219-2017 Standard Specification for Poly(Vinyl Chloride) Insulation for Wire and Cable 60 Operation.pdf ANSI ASTM D2219-2017 Standard Specification for Poly(Vinyl Chloride) Insulation for Wire and Cable 60 Operation.pdf
  • ANSI ASTM D2239 REV A-2012 Standard Specification for Polyethylene (PE) Plastic Pipe (SIDR-PR) Based on Controlled Inside Diameter.pdf ANSI ASTM D2239 REV A-2012 Standard Specification for Polyethylene (PE) Plastic Pipe (SIDR-PR) Based on Controlled Inside Diameter.pdf
  • ANSI ASTM D2276-2006 Standard Test Method for Particulate Contaminant in Aviation Fuel by Line Sampling《线性取样测试航空燃料的微粒污染物的试验方法》.pdf ANSI ASTM D2276-2006 Standard Test Method for Particulate Contaminant in Aviation Fuel by Line Sampling《线性取样测试航空燃料的微粒污染物的试验方法》.pdf
  • ANSI ASTM D229-2013 Standard Test Methods for Rigid Sheet and Plate Materials Used for Electrical Insulation《电气装置用硬板和厚板材的试验方法》.pdf ANSI ASTM D229-2013 Standard Test Methods for Rigid Sheet and Plate Materials Used for Electrical Insulation《电气装置用硬板和厚板材的试验方法》.pdf
  • ANSI ASTM D2301-2010 Standard Specification for Vinyl Chloride Plastic Pressure-Sensitive Electrical Insulating Tape《氯乙烯塑料压实敏感电绝缘带规范》.pdf ANSI ASTM D2301-2010 Standard Specification for Vinyl Chloride Plastic Pressure-Sensitive Electrical Insulating Tape《氯乙烯塑料压实敏感电绝缘带规范》.pdf
  • ANSI ASTM D2303-2013 Standard Test Methods for Liquid-Contaminant Inclined-Plane Tracking and Erosion of Insulating Materials《绝缘材料液体污染、斜面漏电痕迹和侵蚀的新标准试验方法》.pdf ANSI ASTM D2303-2013 Standard Test Methods for Liquid-Contaminant Inclined-Plane Tracking and Erosion of Insulating Materials《绝缘材料液体污染、斜面漏电痕迹和侵蚀的新标准试验方法》.pdf
  • ANSI ASTM D2304-2010 Standard Test Method for Thermal Endurance of Rigid Electrical Insulating Materials《刚性电绝缘材料耐热性试验方法》.pdf ANSI ASTM D2304-2010 Standard Test Method for Thermal Endurance of Rigid Electrical Insulating Materials《刚性电绝缘材料耐热性试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1