HUD 24 CFR PART 60-2011 PROTECTION OF HUMAN SUBJECTS《人体受试者的保护》.pdf

上传人:孙刚 文档编号:782873 上传时间:2019-01-24 格式:PDF 页数:1 大小:189.29KB
下载 相关 举报
HUD 24 CFR PART 60-2011 PROTECTION OF HUMAN SUBJECTS《人体受试者的保护》.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、405 Office of the Secretary, HUD 70.1 actions by the recipient and the State or HUD (using procedures provided for in program regulations) to assure that decisions adopted through the environ-mental review process are carried out during project development and imple-mentation. (d) Responsibility for

2、 monitoring and training. (1) At least once every three years, HUD intends to conduct in-depth monitoring and exercise quality con-trol (through training and consulta-tion) over the environmental activities performed by responsible entities under this part. Limited monitoring of these environmental

3、activities will be con-ducted during each program moni-toring site visit. If through limited or in-depth monitoring of these environ-mental activities or by other means, HUD becomes aware of any environ-mental deficiencies, HUD may take one or more of the following actions: (i) In the case of proble

4、ms found dur-ing limited monitoring, HUD may schedule in-depth monitoring at an earlier date or may schedule in-depth monitoring more frequently; (ii) HUD may require attendance by staff of the responsible entity at HUD- sponsored or approved training, which will be provided periodically at various

5、locations around the country; (iii) HUD may refuse to accept the certifications of environmental compli-ance on subsequent grants; (iv) HUD may suspend or terminate the responsible entitys assumption of the environmental review responsi-bility; (v) HUD may initiate sanctions, cor-rective actions, or

6、 other remedies spec-ified in program regulations or agree-ments or contracts with the recipient. (2) HUDs responsibilities and action under paragraph (d)(1) of this section shall not be construed to limit or re-duce any responsibility assumed by a responsible entity with respect to any particular r

7、elease of funds under this part. Whether or not HUD takes action under paragraph (d)(1) of this section, the Certifying Officer remains the re-sponsible Federal official under 58.13 with respect to projects and activities for which the Certifying Officer has submitted a certification under this part

8、 PART 60PROTECTION OF HUMAN SUBJECTS AUTHORITY: 5 U.S.C. 301; 42 U.S.C. 300v1(b) and 3535(d). SOURCE: 61 FR 36463, July 10, 1996, unless otherwise noted. 60.101 Cross-reference. The provisions set forth at 45 CFR part 46, subpart A, concerning the pro-tection of human research subjects, apply to al

9、l research conducted, sup-ported, or otherwise subject to regula-tion by HUD. PART 70USE OF VOLUNTEERS ON PROJECTS SUBJECT TO DAVIS- BACON AND HUD-DETERMINED WAGE RATES Sec. 70.1 Purpose and authority. 70.2 Applicability. 70.3 Definitions. 70.4 Procedure for implementing prevailing wage exemptions f

10、or volunteers. 70.5 Procedure for obtaining HUD waiver of prevailing wage rates for volunteers. AUTHORITY: Sec. 955, Cranston-Gonzalez National Affordable Housing Act (42 U.S.C. 1437(j), 5310 and 12 U.S.C. 1701q(c)(3); Sec. 7(d) Department of Housing and Urban Develop-ment Act (42 U.S.C. 3535(d). SO

11、URCE: 57 FR 14756, Apr. 22, 1992, unless otherwise noted. 70.1 Purpose and authority. (a) This part implements section 955 of the National Affordable Housing Act (NAHA), which provides an exemption from the requirement to pay prevailing wage rates determined under the Davis-Bacon Act or (in the case

12、 of la-borers and mechanics employed in the operation of public housing projects, and architects, technical engineers, draftsmen and technicians employed in the development of public housing projects) determined or adopted by HUD, for volunteers employed on projects that are subject to prevailing wa

13、ge rates under Title I of the Housing and Community Development Act of 1974 (including Community Develop-ment Block Grants, section 108 loan guarantees, and Urban Development Action Grants), under section 12 of the VerDate Mar2010 08:31 Apr 29, 2011 Jkt 223077 PO 00000 Frm 00415 Fmt 8010 Sfmt 8010 Y:SGML223077.XXX 223077jdjones on DSK8KYBLC1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 13615-2001 en Methods for the Analysis of Ingot Tin - Determination of Impurity Element Contents in Tin Grades 99 90% and 99 85% by Atomic Spectrometry (Incorporating Corrigendu.pdf EN 13615-2001 en Methods for the Analysis of Ingot Tin - Determination of Impurity Element Contents in Tin Grades 99 90% and 99 85% by Atomic Spectrometry (Incorporating Corrigendu.pdf
  • EN 13616-1-2016 en Overfill prevention devices for static tanks for liquid fuels - Part 1 Overfill prevention devices with closure device《液体石油燃料用固定罐的防溢出设备-第1部分 溢出带封口装置的防护装置》.pdf EN 13616-1-2016 en Overfill prevention devices for static tanks for liquid fuels - Part 1 Overfill prevention devices with closure device《液体石油燃料用固定罐的防溢出设备-第1部分 溢出带封口装置的防护装置》.pdf
  • EN 13616-2-2016 en Overfill prevention devices for static tanks for liquid fuels - Part 2 Overfill prevention devices without a closure device《液体石油燃料用固定罐的防溢出设备-第2部分 溢油设备没有关闭装置》.pdf EN 13616-2-2016 en Overfill prevention devices for static tanks for liquid fuels - Part 2 Overfill prevention devices without a closure device《液体石油燃料用固定罐的防溢出设备-第2部分 溢油设备没有关闭装置》.pdf
  • EN 13617-1-2012 en Petrol filling stations - Part 1 Safety requirements for construction and performance of metering pumps dispensers and remote pumping units《加油站 第1部分 计量泵 分配器和遥控泵送.pdf EN 13617-1-2012 en Petrol filling stations - Part 1 Safety requirements for construction and performance of metering pumps dispensers and remote pumping units《加油站 第1部分 计量泵 分配器和遥控泵送.pdf
  • EN 13617-2-2012 en Petrol filling stations - Part 2 Safety requirements for construction and performance of safe breaks for use on metering pumps and dispensers《汽油加油站 第2部分 施工安全要求和性.pdf EN 13617-2-2012 en Petrol filling stations - Part 2 Safety requirements for construction and performance of safe breaks for use on metering pumps and dispensers《汽油加油站 第2部分 施工安全要求和性.pdf
  • EN 13617-3-2012 en Petrol filling stations - Part 3 Safety requirements for construction and performance of shear valves《汽油加油站-第3部分 安全施工要求和剪切阀的性能》.pdf EN 13617-3-2012 en Petrol filling stations - Part 3 Safety requirements for construction and performance of shear valves《汽油加油站-第3部分 安全施工要求和剪切阀的性能》.pdf
  • EN 13617-4-2012 en Petrol filling stations - Part 4 Safety requirements for construction and performance of swivels for use on metering pumps and dispensers《汽油加油站-第4部分 施工安全要求和性能的商务.pdf EN 13617-4-2012 en Petrol filling stations - Part 4 Safety requirements for construction and performance of swivels for use on metering pumps and dispensers《汽油加油站-第4部分 施工安全要求和性能的商务.pdf
  • EN 13618-2011 3750 Flexible hose assemblies in drinking water installations - Functional requirements and test methods《饮用水中软管总成安装 功能需求和测试方法》.pdf EN 13618-2011 3750 Flexible hose assemblies in drinking water installations - Functional requirements and test methods《饮用水中软管总成安装 功能需求和测试方法》.pdf
  • EN 13618-2016 en Flexible hose assemblies in drinking water installations - Functional requirements and test methods《饮用水设施中的挠性软管组件-功能要求和试验方法》.pdf EN 13618-2016 en Flexible hose assemblies in drinking water installations - Functional requirements and test methods《饮用水设施中的挠性软管组件-功能要求和试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1