ITU-R F 1566-1-2007 Performance limits for maintenance of digital fixed wireless systems operating in plesiochronous and synchronous digital hierarchy-based international paths and.pdf

上传人:jobexamine331 文档编号:791076 上传时间:2019-02-02 格式:PDF 页数:8 大小:47.73KB
下载 相关 举报
ITU-R F 1566-1-2007 Performance limits for maintenance of digital fixed wireless systems operating in plesiochronous and synchronous digital hierarchy-based international paths and.pdf_第1页
第1页 / 共8页
ITU-R F 1566-1-2007 Performance limits for maintenance of digital fixed wireless systems operating in plesiochronous and synchronous digital hierarchy-based international paths and.pdf_第2页
第2页 / 共8页
ITU-R F 1566-1-2007 Performance limits for maintenance of digital fixed wireless systems operating in plesiochronous and synchronous digital hierarchy-based international paths and.pdf_第3页
第3页 / 共8页
ITU-R F 1566-1-2007 Performance limits for maintenance of digital fixed wireless systems operating in plesiochronous and synchronous digital hierarchy-based international paths and.pdf_第4页
第4页 / 共8页
ITU-R F 1566-1-2007 Performance limits for maintenance of digital fixed wireless systems operating in plesiochronous and synchronous digital hierarchy-based international paths and.pdf_第5页
第5页 / 共8页
点击查看更多>>
资源描述

1、 Rec. ITU-R F.1566-1 1 RECOMMENDATION ITU-R F.1566-1 Performance limits for maintenance of digital fixed wireless systems operating in plesiochronous and synchronous digital hierarchy-based international paths and sections (Question ITU-R 161/9) (2002-2007) Scope This Recommendation provides perform

2、ance limits for international plesiochronous digital hierarchy (PDH) and synchronous digital hierarchy (SDH) paths and sections implemented using fixed wireless systems (FWSs). The approach is aligned with the maintenance approach taken by ITU-T, but some media-specific aspects for digital fixed wir

3、eless systems are incorporated. The Annex details the application of the performance limits for bringing into service (BIS). The ITU Radiocommunication Assembly, considering a) that digital fixed wireless systems (FWSs) for use in constant bit-rate digital paths at or above the primary rate in the i

4、nternational portion of a 27 500 km hypothetical reference path (HRP) are being designed, operated and maintained; b) that performance objectives for planning of FWSs are specified in practice for real digital paths; c) that there is a need to specify maintenance performance limits for digital FWSs;

5、 d) that ITU-T has prepared performance limits for maintenance and bringing into service (BIS) of international multi-operator plesiochronous digital hierarchy (PDH) paths and connections in ITU-T Recommendation M.2100 and for international multi-operator synchronous digital hierarchy (SDH) paths an

6、d international SDH multiplex sections in ITU-T Recommendation M.2101, being based on ITU-T Recommendations G.826 and G.828, respectively; e) that ITU-T Recommendation M.2120 provides procedures for fault detection and localization, with and without in-service monitoring, for international multi-ope

7、rator digital paths, sections and transmission systems; f) that ITU-R has prepared Recommendation ITU-R F.1668 for the error performance objectives for real FWS links used in 27 500 km hypothetical reference paths and connections; g) that the influence of propagation conditions on the fault detectio

8、n and localization procedures for determining maintenance intervention for digital FWSs is currently under study in ITU-R; h) that performance limits for maintenance and procedures for their measurement for PDH and SDH digital FWSs transporting PDH and/or SDH signals should be defined; j) that in de

9、fining the performance limits for maintenance of PDH and SDH digital FWSs and for the purposes of identifying possible maintenance interventions, levels of performance limits should be considered. ITU-T Recommendations M.2100 and M.2101 identify and define levels of performance limits as degraded pe

10、rformance, unacceptable performance, and in addition, performance after intervention (repair); 2 Rec. ITU-R F.1566-1 k) that the performance limits for maintenance may be different from the BIS limits, as defined in Recommendation ITU-R F.1330; l) that due consideration should be taken of periods of

11、 severe fading when undertaking measurements that relate to performance limits for maintenance, recognizing a) that for the purpose of allocating the performance objectives for the international portion of a constant bit-rate path at or above the primary rate, an international digital path has been

12、partitioned in geographical terms; these portions have been titled path core elements (PCEs). Two types of international PCE are used: an international PCE (IPCE) between an international gateway and a frontier station in a terminating country, or between frontier stations in a transit country1; an

13、inter-country PCE (ICPCE) between the adjacent frontier stations of the two countries involved. The ICPCE corresponds to the highest order digital path carried on a digital transmission system linking the two countries; recommends 1 that the limits for maintenance should be based on end-to-end refer

14、ence performance objectives (RPOs), applicable to each direction of any real digital FWS link of length d, and derived by using the values in Tables 1a and 1b as well as allocations shown in Table 2; TABLE 1a (see Note 1) RPO for end-to-end international digital paths PDH Primary (see Note 3) Second

15、ary Tertiary Quaternary SDH (Mbit/s) 1.5 to 5 5 to 15 15 to 55 55 to 160 160 to 3 500 Parameter End-to-end RPO ESR for paths designed according to G.826 0.02 0.025 0.0375 0.08 N/A ESR for paths designed according to G.828 0.005 0.005 0.01 0.02 N/A BBER for SDH paths designed according to G.828 2.5 1

16、052.5 1052.5 1055 1055 105SESR 0.001 0.001 0.001 0.001 0.001 ESR: errored second ratio N/A: not applicable BBER: background block error ratio SESR: severely errored second ratio. 1The definition of an international gateway and a frontier station can be found in ITU-T Recommendation M.2101. Rec. ITU-

17、R F.1566-1 3 TABLE 1b (see Note 1) RPO for end-to-end international SDH multiplex sections Rate STM-0 STM-1 STM-4 Blocks 64 000 192 000 768 000 ESR (according to G.826) 0.0375 0.08 N/A ESR (according to G.828) 0.01 0.02 N/A SESR 0.001 0.001 0.001 BBER (according to G.826) N/A N/A N/A BBER (according

18、 to G.828) 2.5 1055 1055 105TABLE 2 Allocation (an) PCE classification (km) Allocation (% of end-to-end RPO) IPCE Terminating/transit national network: d 100 1.2 100 7 500 10 ICPCE(1)d 0.5 to 0.75 to 10 APO) Unacceptable ( 10 APO) *For adverse propagation conditions limits could be doubled. 4 that T

19、Ps for the performance monitoring of digital FWSs have been designed as follows: that for the detection of degraded performance, a shorter-term maintenance test period (TPDP) duration of 24 h should be used, but for adverse propagation conditions a longer-term test period duration of seven days is r

20、ecommended; Rec. ITU-R F.1566-1 5 that for the detection of unacceptable performance in normal propagation conditions, a short-term maintenance test period (TPUP) duration of 15 min may be used; that for returning radio paths and sections into service after a maintenance intervention event, a longer

21、-term return after maintenance intervention test period (TPMI) duration of seven days is recommended but in normal propagation conditions a shorter-term test period duration of 24 h may be used. At present, the test period duration for each of the maintenance performance limits is provisional; 5 tha

22、t Annex 1 contains guidance and further details on the performance limits, monitoring durations, test procedures and methodology for calculation of the MPLs. NOTE 1 It is the responsibility of each country to design its network in a way that is consistent with its country allocation for the internat

23、ional path. NOTE 2 The lengths d referred to in Table 2 are actual route lengths or air-route distances multiplied by an appropriate routing factor (Rf), whichever is less; for multiplex sections the length d refers to the actual distance only (see ITU-T Recommendation M.2100). TABLE 4 PCE great cir

24、cle length vs. routing factor PCE great circle length Routing factor (Rf) Calculated PCE length d 1 000 km 1.5 1.5 d km 1 000 km d 1 200 km 1 500/d 1 500 km d 1 200 km 1.25 1.25 d km NOTE 3 For international multioperator connections using equipment designed according to revised ITU-T Recommendation

25、 G.826 RPO for PDH primary rate could be used. NOTE 4 The periods of normal and adverse propagation conditions may change from country to country and therefore it is the responsibility of the interested parties to reach agreement. Annex 1 MPLs and methodology for calculation 1 Maintenance testing pr

26、ocedure The testing procedures for the fault detection and localization with and without in-service monitoring of PDH/SDH paths and sections, including how to deal with any period of unavailability during the test, are defined in ITU-T Recommendation M.2120 and may be used for digital FWS paths, sec

27、tions and transmission systems during periods with limited fading activities. The test procedures for significant and/or severe fading activities are under study. 6 Rec. ITU-R F.1566-1 2 The methodology for the calculation of MPLs The following steps shall be followed to obtain the relevant PDH/SDH

28、path or section performance limits: Step 1: Identify the bit rate of the path or section Step 2: Read the RPOs for the appropriate bit rate from Tables 1a, 1b or 1c for ESR, SESR and BBER Step 3: Identify all PCEs for the entire path or section, and set N equal to the total number of PCEs Step 4: Id

29、entify the length, d, of each PCE n (n = 1 to N ). The length, d, is either the actual path length or can be estimated by the great circle length between its end points multiplied by the appropriate routing factor Rf (see Note 2 of recommends) Step 5: Take the allocation, an% (as a percentage of end

30、-to-end RPO) for PCE n (n = 1 to N ), from Table 2. Note that the allocations in Table 2 are maximum values; more stringent values can be used by bilateral or multilateral agreement Step 6: Calculate A%, the path allocation, where: %1=NnaA Step 7: Determine the required TP in accordance with recomme

31、nds 5 (15 min, 24 h or seven days). Express TP in seconds, e.g. TP = 86 400 s for a 24 h TP and TP = 604 800 s for a seven-day TP Step 8: Calculate the APOs for ES, SES and BBE required from the information already obtained: APO = A% RPO TP/100 Step 9: Calculate the appropriate MPL for the path or s

32、ection for ES and SES: MPL = APO PLF where the MPL is for either: Degraded performance limit, MPLDPUnacceptable performance limit, MPLUPsee recommends 3Performance after repair limit, MPLPARNOTE 1 If any PCE within a path is changed, then the entire calculation process must be repeated. 3 Performanc

33、e levels and limits ITU-T Recommendation M.20 states that an entity can be in a limited number of predefined conditions, depending upon its performance. These conditions are referred to as performance levels and are defined as the unacceptable performance level, the degraded performance level and th

34、e acceptable performance level. The boundaries between the performance levels are referred to as the performance limits. In addition to these, ITU-T Recommendation M.35 also defines a special limit referred to as the performance after repair. Each of the performance limits is a function of the APO a

35、nd these limits are shown in Table 3. 4 Performance thresholds and monitoring period durations When a performance limit is given a specific value in terms of ES, SES and/or BBE, each ES, SES and/or BBE performance limit will require to have an associated measurement duration. The concept of performa

36、nce thresholds and measurement durations is addressed in detail within ITU-T Recommendations M.2100 (PDH) and M.2101 (SDH). Rec. ITU-R F.1566-1 7 ITU-T Recommendations M.2100/M.2101 state that the general strategy for the use or performance monitoring information and thresholds is described in ITU-T

37、 Recommendations M.20 and M.34. These thresholds and information will be reported to operations systems via the telecommunications management network for both real time and longer-term analysis. When thresholds of unacceptable or degraded performance levels are reached, maintenance action should be

38、initiated independently from the performance measurement. Other thresholds may be used for maintenance and longer-term quality analysis. The operations systems will use real time processing to assign maintenance priorities to these threshold crossings and information, using the performance supervisi

39、on process described in ITU-T Recommendation M.20. For the general strategy of monitoring the MPLs of digital FWSs, three types of threshold monitoring durations are considered; T1, T2 and T3. Threshold monitoring duration, T1 The monitoring duration T1 is fixed to a 15 min value and ES, SES and BBE

40、 are counted over this period. The T1 period is to assist in detection of transition to or from the unacceptable performance level during normal propagation conditions. A threshold report occurs when an ES, SES or BBE threshold is exceeded. The reset threshold report, which is an optional feature, o

41、ccurs when the number of ES, BBE and SES is lower than or equal to the reset threshold. Those principles are explained in ITU-T Recommendation M.2120. Threshold monitoring duration, T2 The monitoring duration T2 is fixed to a 24 h duration and ES, SES and BBE are counted over this period. The T2 per

42、iod is to assist in the detection of the transition either to, or from, the unacceptable performance level. The threshold report occurs whenever an ES, SES and BBE threshold has been exceeded over the period of time T2. The T2 period is also to be used when returning paths or sections into service f

43、ollowing a maintenance intervention event during normal propagation conditions. The T2 period should be regarded as an initial test period to confirm that the path or section meets the performance limit (MPLPAR) for returning paths/sections to service after repair. Following a successful monitoring

44、period of T2 duration, the path or section should continue to be monitored for a least seven days (T3 period) to confirm that the maintenance intervention is successful (see ITU-T Recommendation M.2120, 5). Threshold monitoring duration, T3 The monitoring duration T3 is fixed to a seven-day duration

45、 and ES, BBE and SES are counted over this period. The T3 period is to assist in the detection of the transition to the degraded performance level. The threshold report occurs whenever an ES, BBE or SES threshold has been exceeded over the period of time T3. Long-term quality monitoring/measurement

46、Performance monitoring history should be kept for at least one year (suggested) by the management system. 8 Rec. ITU-R F.1566-1 5 Availability and unavailability The criteria for entry/exit from the unavailable state are defined with ITU-T Recommendations M.2100 ( 8) and M.2101 ( 12) and the criteri

47、a for evaluating unavailability events when undertaking performance limits for maintenance measurements are contained in ITU-T Recommendation M.2120. At present, unavailability limits are left for negotiation and the ITU-T have the subject under consideration. 6 Evaluation of error performance param

48、eters The procedure for the in-service and out-of-service evaluation of error performance parameters for PDH and SDH entities is considered, in detail, in ITU-T Recommendations M.2100 and M.2101. The evaluation of error performance parameters for the maintenance of digital FWSs during adverse propagation conditions should take due account of the effect of propagation.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1