ITU-T E 148-1993 Routing of Traffic by Automatic Transit Exchanges《自动转接交换业务选路》.pdf

上传人:孙刚 文档编号:794874 上传时间:2019-02-02 格式:PDF 页数:3 大小:41.98KB
下载 相关 举报
ITU-T E 148-1993 Routing of Traffic by Automatic Transit Exchanges《自动转接交换业务选路》.pdf_第1页
第1页 / 共3页
ITU-T E 148-1993 Routing of Traffic by Automatic Transit Exchanges《自动转接交换业务选路》.pdf_第2页
第2页 / 共3页
ITU-T E 148-1993 Routing of Traffic by Automatic Transit Exchanges《自动转接交换业务选路》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 % TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU4%,%0(/.%G0G0.%47/2+G0G0!.$G0G0)3$./0%2!4)/. G0G0.5-“%2). G0G02/54).!.$G0G0-/“),%G0G03%26)#%2/54).G0G0/&G0G042!&)#G0G0“9G0G0!54/-!4)#42!.3)4G0G0%8#(!.%3)45G134G0G0RecommendationG0G0% (Extract from the “LUEG0“

2、OOK)NOTES1 ITU-T Recommendation E.148 was published in Fascicle II.2 of the Blue Book. This file is an extract from theBlue Book. While the presentation and layout of the text might be slightly different from the Blue Book version, thecontents of the file are identical to the Blue Book version and c

3、opyright conditions remain unchanged (see below).2 In this Recommendation, the expression “Administration” is used for conciseness to indicate both atelecommunication administration and a recognized operating agency. ITU 1988, 1993All rights reserved. No part of this publication may be reproduced or

4、 utilized in any form or by any means, electronic ormechanical, including photocopying and microfilm, without permission in writing from the ITU.Fascicle II.2 - Rec. E.148 1Recommendation E.148Fascicle II.2 - Rec. E.148ROUTING OF TRAFFIC BY AUTOMATIC TRANSIT EXCHANGESIn the two cases mentioned herea

5、fter it may be advantageous from a general economic point of view (takinginto account the loss probability and cost) to route traffic by automatic transit exchanges:Case 1Where there is a light traffic load between two countries, it may be desirable to route this traffic through anautomatic transit

6、exchange, rather than to provide a small group of direct circuits.The considerations normally apply to the case where the introduction of semiautomatic operation is considered,but they should be equally valid for traffic which terminates on a manual international trunk exchange, reachedthrough an au

7、tomatic transit exchange.Note The purely economic point of view from which these conclusions are drawn excludes all otherconsiderations, particularly the following:a) It is necessary that the transit exchanges through which it is desired to route the traffic should be preparedto accept the transit t

8、raffic which would be offered to them and Administrations involved should designtheir circuit groups to satisfy the requirements of Part II of Fascicle II.3 in so far as loss probability isconcerned.b) The provision of direct circuits may be preferred to a routing entirely via a transit centre for o

9、ther reasons,e.g. the provision of broadcast programme circuits, control circuits for these transmissions, voice-frequencytelegraph circuits, etc.Case 2In certain cases, particularly where the traffic between two countries is heavy, and when, for instance, it maylead to the deferment of a new installation, it may be advantageous to route a certain proportion of theadditional traffic (peak traffic) by way of a transit automatic centre.

展开阅读全文
相关资源
猜你喜欢
  • BS EN 13230-5-2016 Railway applications Track Concrete sleepers and bearers Special elements《轨道交通 钢轨 混凝土轨枕及轨座 专用组件》.pdf BS EN 13230-5-2016 Railway applications Track Concrete sleepers and bearers Special elements《轨道交通 钢轨 混凝土轨枕及轨座 专用组件》.pdf
  • BS EN 13231-1-2013 Railway applications Track Acceptance of works Works on ballasted track Plain line switches and crossings《轨道交通 轨道 工程验收 有碴轨道的作业 平原线、侧线和道岔口》.pdf BS EN 13231-1-2013 Railway applications Track Acceptance of works Works on ballasted track Plain line switches and crossings《轨道交通 轨道 工程验收 有碴轨道的作业 平原线、侧线和道岔口》.pdf
  • BS EN 13231-3-2012 Railway applications Track Acceptance of works Acceptance of reprofiling rails in track《轨道交通 轨道 工程验收 钢轨重新修复轮廓验收》.pdf BS EN 13231-3-2012 Railway applications Track Acceptance of works Acceptance of reprofiling rails in track《轨道交通 轨道 工程验收 钢轨重新修复轮廓验收》.pdf
  • BS EN 13231-4-2013 Railway applications Track Acceptance of works Acceptance of reprofiling rails in switches and crossings《轨道交通 轨道 工程验收 铁路侧线和道岔口中钢轨重新修复轮廓验收》.pdf BS EN 13231-4-2013 Railway applications Track Acceptance of works Acceptance of reprofiling rails in switches and crossings《轨道交通 轨道 工程验收 铁路侧线和道岔口中钢轨重新修复轮廓验收》.pdf
  • BS EN 13232-1-2003 Railway applications - Track - Switches and crossings - Definitions《轨道交通 轨道 铁路侧线和道岔口 定义》.pdf BS EN 13232-1-2003 Railway applications - Track - Switches and crossings - Definitions《轨道交通 轨道 铁路侧线和道岔口 定义》.pdf
  • BS EN 13232-2-2003 Railway applications - Track - Switches and crossings - Requirements for geometric design《轨道交通 轨道 铁路侧线和道岔口 几何设计要求》.pdf BS EN 13232-2-2003 Railway applications - Track - Switches and crossings - Requirements for geometric design《轨道交通 轨道 铁路侧线和道岔口 几何设计要求》.pdf
  • BS EN 13232-3-2003 Railway applications - Track - Switches and crossings - Requirements for wheel rail interaction《轨道交通 轨道 铁路侧线和道岔口 车轮 钢轨相互作用要求》.pdf BS EN 13232-3-2003 Railway applications - Track - Switches and crossings - Requirements for wheel rail interaction《轨道交通 轨道 铁路侧线和道岔口 车轮 钢轨相互作用要求》.pdf
  • BS EN 13232-4-2005 Railway applications - Track - Switches and crossings - Part 4 Actuation locking and detection《轨道交通 轨道 铁道侧线和道岔口 驱动、锁紧和检测》.pdf BS EN 13232-4-2005 Railway applications - Track - Switches and crossings - Part 4 Actuation locking and detection《轨道交通 轨道 铁道侧线和道岔口 驱动、锁紧和检测》.pdf
  • BS EN 13232-5-2005 Railway applications - Track - Switches and crossings - Switches《轨道交通 轨道 铁道侧线和道岔口 铁道侧线》.pdf BS EN 13232-5-2005 Railway applications - Track - Switches and crossings - Switches《轨道交通 轨道 铁道侧线和道岔口 铁道侧线》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1