ITU-T M 725-1988 RESTORATION CONTROL POINT《恢复控制点》.pdf

上传人:feelhesitate105 文档编号:799949 上传时间:2019-02-02 格式:PDF 页数:4 大小:43.74KB
下载 相关 举报
ITU-T M 725-1988 RESTORATION CONTROL POINT《恢复控制点》.pdf_第1页
第1页 / 共4页
ITU-T M 725-1988 RESTORATION CONTROL POINT《恢复控制点》.pdf_第2页
第2页 / 共4页
ITU-T M 725-1988 RESTORATION CONTROL POINT《恢复控制点》.pdf_第3页
第3页 / 共4页
ITU-T M 725-1988 RESTORATION CONTROL POINT《恢复控制点》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 - TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU-!).4%.!.#% ).4%2.!4)/.!,G0G04%,%0(/.%G0G0#)2#5)432%34/2!4)/.G0G0#/.42/,G0G00/).4)45G134G0G0RecommendationG0G0- (Extract from the “LUEG0“OOK)NOTES1 ITU-T Recommendation M.725 was published in Fascicle IV.1 of

2、 the Blue Book. This file is an extract fromthe Blue Book. While the presentation and layout of the text might be slightly different from the Blue Book version, thecontents of the file are identical to the Blue Book version and copyright conditions remain unchanged (see below).2 In this Recommendati

3、on, the expression “Administration” is used for conciseness to indicate both atelecommunication administration and a recognized operating agency. ITU 1988, 1993All rights reserved. No part of this publication may be reproduced or utilized in any form or by any means, electronic ormechanical, includi

4、ng photocopying and microfilm, without permission in writing from the ITU.Fascicle IV.1 - Rec. M.725 1Recommendation M.725Fascicle IV.1 - Rec. M.725RESTORATION CONTROL POINT1 Definition of restoration control point (RCP)The restoration control point (RCP) is an element within the general maintenance

5、 organization for theinternational telecommunication services. It initiates and coordinates service restoration activities in case of failures orplanned outages of transmission systems in accordance with plans and ad hoc arrangements agreed by the technicalservices of the Administrations concerned.S

6、ince two or more RCPs are involved in agreed restoration plans, it is practical to nominate one RCP as theOverall RCP which then initiates and controls implementation of the plan. The additional responsibilities and functionsof an Overall RCP are given in 3 below.2 Responsibilities and functionsThe

7、restoration control point (RCP) is responsible for the following set of functions:2.1 Initiating the implementation of a restoration plan and ad hoc arrangements with the other stations involvedwithin its Administrations boundaries.2.2 Monitoring the implementation of the restoration plan.2.3 Coordi

8、nating the restoration activities of the repeater stations and other stations involved within itsAdministrations boundaries.2.4 Liaising with restoration control points of other Administrations as necessary and agreeing the times of eventswith them.2.5 Exchanging information with the network managem

9、ent (implementation and control point) (seeRecommendation E.413 1) for coordination purposes as appropriate.2.6 Monitoring and coordinating the return to normal service conditions after the fault has been cleared or theplanned work has been finished.2.7 Keeping, throughout the period during which th

10、e restoration and the return to normal conditions is executed,an accurate log of events, including any circuit, channel, group, supergroup, etc., or baseband patching which takesplace.2.8 Requesting and receiving reports from other RCPs and disseminating this information within its ownAdministration

11、 as required.2.9 Reporting the events to the responsible authorities of its Administration as desired and advising the systemavailability information point about the progress of restoration.2.10 Sending a final restoration report, after the return to normal, containing all relevant data (including a

12、greedtimes) for accounting purposes to the responsible authorities within its Administration.2.11 If no restoration plan exists or, for some reason, an existing plan cannot be implemented, advising theresponsible authorities in its own Administration and suggesting suitable ad hoc arrangements in th

13、e light of theinformation available.3 Additional responsibilities of an overall RCPThe responsibilities of an overall RCP are much the same as an ordinary RCP but with additionalresponsibilities as follows:3.1 Initiating the implementation of a restoration plan with other RCPs concerned.3.2 Requesti

14、ng and receiving reports from other RCPs and disseminating this information as necessary.3.3 Coordinating and controlling all restoration activities including the return to normal conditions.2 Fascicle IV.1 - Rec. M.7254 FacilitiesThe restoration control point should be provided with the following f

15、acilities:4.1 Appropriate communication facilities in order to assume its responsibilities.4.2 Access to information appropriate to its functions and this includes:a) status of relevant international transmission systems;b) current restoration plans;c) list of the sections of border-crossing transmi

16、ssion traffic routes;d) routing information for international group, supergroup, etc., links;e) inventory of spare transmission facilities, in its own and neighbouring countries, lending themselves torestoration.Reference1 CCITT Recommendation International network management - Planning, Vol. II, Rec. E.413.

展开阅读全文
相关资源
猜你喜欢
  • DIN 6855-4-2016 Constancy testing of nuclear medicine instruments - Part 4 Positron emission tomographs (PET)《核医疗测量系统的稳定性试验 第4部分 正电子发射断层成像(PET)》.pdf DIN 6855-4-2016 Constancy testing of nuclear medicine instruments - Part 4 Positron emission tomographs (PET)《核医疗测量系统的稳定性试验 第4部分 正电子发射断层成像(PET)》.pdf
  • DIN 6856-1-2007 Radiological film viewing boxes and viewing conditions - Part 1 Requirements and measures of quality assurance in medical diagnostics《放射学底片影视箱和观察条件 第1部分 医疗诊断中质量保证的要.pdf DIN 6856-1-2007 Radiological film viewing boxes and viewing conditions - Part 1 Requirements and measures of quality assurance in medical diagnostics《放射学底片影视箱和观察条件 第1部分 医疗诊断中质量保证的要.pdf
  • DIN 6856-3-2007 Radiological film viewing boxes and viewing conditions - Part 3 Radiological film viewing boxes for dentistry《放射学底片影视箱和观察条件 第3部分 牙科用放射胶片影视箱》.pdf DIN 6856-3-2007 Radiological film viewing boxes and viewing conditions - Part 3 Radiological film viewing boxes for dentistry《放射学底片影视箱和观察条件 第3部分 牙科用放射胶片影视箱》.pdf
  • DIN 6857-2-2016 Radiation protection accessories for medical use of X-radiation - Part 2 Quality control of protective clothes being in use《医用X射线的辐射保护附件 第2部分 在用防护服的质量控制》.pdf DIN 6857-2-2016 Radiation protection accessories for medical use of X-radiation - Part 2 Quality control of protective clothes being in use《医用X射线的辐射保护附件 第2部分 在用防护服的质量控制》.pdf
  • DIN 6858-1-2014 Quality control of multi-modal imaging - Part 1 Routine test PET CT《多模式成像的质量控制 第1部分 定期试验PET CT》.pdf DIN 6858-1-2014 Quality control of multi-modal imaging - Part 1 Routine test PET CT《多模式成像的质量控制 第1部分 定期试验PET CT》.pdf
  • DIN 6860-1996 Film processing in radiology - Storage transport handling and processing《放射学的胶片处理 存储、运输、操作和处理》.pdf DIN 6860-1996 Film processing in radiology - Storage transport handling and processing《放射学的胶片处理 存储、运输、操作和处理》.pdf
  • DIN 68601-2002 Bonded wood joints - Terms and definitions《胶粘的木制品接头 术语和定义》.pdf DIN 68601-2002 Bonded wood joints - Terms and definitions《胶粘的木制品接头 术语和定义》.pdf
  • DIN 6862-1-1992 Identification and characterisation of radiological images in medical diagnosis direct and indirect radiography《医疗诊断中X射线图相的识别和表征 直接和间接X线照相术》.pdf DIN 6862-1-1992 Identification and characterisation of radiological images in medical diagnosis direct and indirect radiography《医疗诊断中X射线图相的识别和表征 直接和间接X线照相术》.pdf
  • DIN 6862-2-2011 Identification and characterization of radiological images in medical diagnosis - Part 2 Passing on of radiographs and related records in digital radiography digita.pdf DIN 6862-2-2011 Identification and characterization of radiological images in medical diagnosis - Part 2 Passing on of radiographs and related records in digital radiography digita.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1