ITU-T M 760-1988 Transfer link for common channel Signalling System No 6《公共信道No 6信令系统的传递链路》.pdf

上传人:sumcourage256 文档编号:799977 上传时间:2019-02-02 格式:PDF 页数:7 大小:95.73KB
下载 相关 举报
ITU-T M 760-1988 Transfer link for common channel Signalling System No 6《公共信道No 6信令系统的传递链路》.pdf_第1页
第1页 / 共7页
ITU-T M 760-1988 Transfer link for common channel Signalling System No 6《公共信道No 6信令系统的传递链路》.pdf_第2页
第2页 / 共7页
ITU-T M 760-1988 Transfer link for common channel Signalling System No 6《公共信道No 6信令系统的传递链路》.pdf_第3页
第3页 / 共7页
ITU-T M 760-1988 Transfer link for common channel Signalling System No 6《公共信道No 6信令系统的传递链路》.pdf_第4页
第4页 / 共7页
ITU-T M 760-1988 Transfer link for common channel Signalling System No 6《公共信道No 6信令系统的传递链路》.pdf_第5页
第5页 / 共7页
点击查看更多>>
资源描述

1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 - TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU-!).4%.!.#% G0G0#/-/.G0G0#(!%,G0G03).!,).3934%-342!.3b) the maintenance of the transfer link between two centres, from the output of one data modem to the inputof another data modem. This link does not includ

2、e data modems.4.2 By agreement between Administrations, one terminal international centre, or an equivalent point specified bythe Administration concerned, will be designated as the overall maintenance control station. This station will maintainan overview of the performance of Signalling System No.

3、 6 and in general be responsible to ensure that actions arecoordinated when responsibility for a particular fault is not clearly identified. Additionally, one terminal internationalcentre should function as the control station for transfer link maintenance activities.Note For a signalling system thi

4、s role may be combined with that of overall maintenance control.4.3 Organizational points or stations need to be assigned to provide for the following functions:a) Overall signalling system maintenancei) control stationii) sub-control stationiii) fault report pointiv) testing pointb) Transfer link m

5、aintenancei) control stationFascicle IV.1 - Rec. M.760 3ii) sub-control stationiii) fault report pointiv) transmission maintenance point (international line) (TMP-IL)These may be assigned by an Administration as best suited to its individual needs.It is essential that the appropriate contact point i

6、nformation be exchanged in order to minimize maintenancedifficulties. Figure B-1/M.93 offers a plan for the exchange of contact point information for the international telephoneservice and allows for the exchange of contact point information Signalling System No. 6 maintenance.4.4 This Recommendatio

7、n relates to the maintenance of the transfer link. However, maintenance activities on thetransfer link should be controlled in order to preclude interruption of signalling functions, either during normal serviceor while tests initiated by the overall maintenance control station are being carried out

8、 Furthermore, the TMP-IL forthe transfer link is not likely to be aware of any faults in the signalling system unless advised by the overall signallingmaintenance control station or transfer link control station. Therefore, testing of the transfer link will not be undertakenuntil advice (or concurr

9、ence) is received from the overall maintenance control station or the transfer link controlstation.4.5 Once a fault is indicated in Signalling System No. 6, a possible series of events is illustrated in Figure 2/M.760.In the presentation of the flowchart it has been necessary to assume a possible or

10、ganizational arrangement andassignment of responsibilities see 4.1, a) above.This chart does not go into all possibilities. It is intended to depict a process toward fault correction, lookingfirst at the most likely causes of faults in the transfer link with speedy correction in mind, and then towar

11、d moredetailed and time- consuming tests to discover more elusive faults. It should be noted that some long-term testing maybe required in this latter process.4Fascicle IV.1 - Rec. M.760Fascicle IV.1 - Rec. M.760 5References1 CCITT Recommendation Testing and maintenance Overall tests of Signalling System No. 6, Vol. VI,Rec. Q.295.2 CCITT Recommendation Reserve facilities provided, Vol. VI, Rec. Q.292.

展开阅读全文
相关资源
猜你喜欢
  • ASTM C120 C120M-2015 Standard Test Methods of Flexure Testing of Slate (Breaking Load Modulus of Rupture Modulus of Elasticity)《石板弯曲试验 (断裂载荷 断裂模数以及弹性模量) 的标准试验方法》.pdf ASTM C120 C120M-2015 Standard Test Methods of Flexure Testing of Slate (Breaking Load Modulus of Rupture Modulus of Elasticity)《石板弯曲试验 (断裂载荷 断裂模数以及弹性模量) 的标准试验方法》.pdf
  • ASTM C120 C120M-2015a Standard Test Methods for Flexure Testing of Structural and Roofing Slate《屋面结构石板挠曲试验的标准试验方法》.pdf ASTM C120 C120M-2015a Standard Test Methods for Flexure Testing of Structural and Roofing Slate《屋面结构石板挠曲试验的标准试验方法》.pdf
  • ASTM C120-2006e1 Standard Test Methods of Flexure Testing of Slate (Breaking Load Modulus of Rupture Modulus of Elasticity)《石板的弯曲标准试验方法(断裂荷载、弯曲模数和弹性模数)》.pdf ASTM C120-2006e1 Standard Test Methods of Flexure Testing of Slate (Breaking Load Modulus of Rupture Modulus of Elasticity)《石板的弯曲标准试验方法(断裂荷载、弯曲模数和弹性模数)》.pdf
  • ASTM C1201 C1201M-2009 Standard Test Method for Structural Performance of Exterior Dimension Stone Cladding Systems by Uniform Static Air Pressure Difference《用均匀静态空气压差法测定规格石料的房屋骨袈外.pdf ASTM C1201 C1201M-2009 Standard Test Method for Structural Performance of Exterior Dimension Stone Cladding Systems by Uniform Static Air Pressure Difference《用均匀静态空气压差法测定规格石料的房屋骨袈外.pdf
  • ASTM C1201 C1201M-2015 Standard Test Method for Structural Performance of Exterior Dimension Stone Cladding Systems by Uniform Static Air Pressure Difference《采用统一静态空气压差法测定外部规格石料覆层系.pdf ASTM C1201 C1201M-2015 Standard Test Method for Structural Performance of Exterior Dimension Stone Cladding Systems by Uniform Static Air Pressure Difference《采用统一静态空气压差法测定外部规格石料覆层系.pdf
  • ASTM C1201-1991(2003) Standard Test Method for Structural Performance of Exterior Dimension Stone Cladding Systems by Uniform Static Air Pressure Difference《用均匀静态空气压差法测定规格石料的房屋骨袈外墙.pdf ASTM C1201-1991(2003) Standard Test Method for Structural Performance of Exterior Dimension Stone Cladding Systems by Uniform Static Air Pressure Difference《用均匀静态空气压差法测定规格石料的房屋骨袈外墙.pdf
  • ASTM C1202-2005 Standard Test Method for Electrical Indication of Concretes Ability to Resist Chloride Ion Penetration《混凝土耐氯离子渗透能力的电指示的标准试验方法》.pdf ASTM C1202-2005 Standard Test Method for Electrical Indication of Concretes Ability to Resist Chloride Ion Penetration《混凝土耐氯离子渗透能力的电指示的标准试验方法》.pdf
  • ASTM C1202-2008 Standard Test Method for Electrical Indication of Concretes Ability to Resist Chloride Ion Penetration.pdf ASTM C1202-2008 Standard Test Method for Electrical Indication of Concretes Ability to Resist Chloride Ion Penetration.pdf
  • ASTM C1202-2009 Standard Test Method for Electrical Indication of Concretes Ability to Resist Chloride Ion Penetration《混凝土耐氯离子渗透能力的电指示的标准试验方法》.pdf ASTM C1202-2009 Standard Test Method for Electrical Indication of Concretes Ability to Resist Chloride Ion Penetration《混凝土耐氯离子渗透能力的电指示的标准试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1