MSFC NASA MPR 7123 2-2009 TECHNICAL REVIEWS AND REVIEW ITEM DISCREPANCY (RID) PROCESSING MSFC PROGRAMS AND PROJECTS《技术审查和审查项目差异(rid)处理 马歇尔太空飞行中心计划和项目》.pdf

上传人:花仙子 文档编号:822882 上传时间:2019-02-16 格式:PDF 页数:63 大小:405.11KB
下载 相关 举报
MSFC NASA MPR 7123 2-2009 TECHNICAL REVIEWS AND REVIEW ITEM DISCREPANCY (RID) PROCESSING MSFC PROGRAMS AND PROJECTS《技术审查和审查项目差异(rid)处理 马歇尔太空飞行中心计划和项目》.pdf_第1页
第1页 / 共63页
MSFC NASA MPR 7123 2-2009 TECHNICAL REVIEWS AND REVIEW ITEM DISCREPANCY (RID) PROCESSING MSFC PROGRAMS AND PROJECTS《技术审查和审查项目差异(rid)处理 马歇尔太空飞行中心计划和项目》.pdf_第2页
第2页 / 共63页
MSFC NASA MPR 7123 2-2009 TECHNICAL REVIEWS AND REVIEW ITEM DISCREPANCY (RID) PROCESSING MSFC PROGRAMS AND PROJECTS《技术审查和审查项目差异(rid)处理 马歇尔太空飞行中心计划和项目》.pdf_第3页
第3页 / 共63页
MSFC NASA MPR 7123 2-2009 TECHNICAL REVIEWS AND REVIEW ITEM DISCREPANCY (RID) PROCESSING MSFC PROGRAMS AND PROJECTS《技术审查和审查项目差异(rid)处理 马歇尔太空飞行中心计划和项目》.pdf_第4页
第4页 / 共63页
MSFC NASA MPR 7123 2-2009 TECHNICAL REVIEWS AND REVIEW ITEM DISCREPANCY (RID) PROCESSING MSFC PROGRAMS AND PROJECTS《技术审查和审查项目差异(rid)处理 马歇尔太空飞行中心计划和项目》.pdf_第5页
第5页 / 共63页
点击查看更多>>
资源描述

1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MPR 7123.2 BASELINE EFFECTIVE DATE: July 10, 2009 EXPIRATION DATE: July 10, 2014 MARSHALL PROCEDURAL REQUIREMENTS DA01 TECHNICAL REVIEWS AND REVIEW ITEM DISCREPANCY (

2、RID) PROCESSING, MSFC PROGRAMS AND PROJECTS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 Technical Reviews and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Programs and Projects

3、 Date: July 10, 2009 Page 2 of 63 DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 7/10/2009 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 Technic

4、al Reviews and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Programs and Projects Date: Page 3 of 63 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TABLE OF CONTENTS Preface P.1 Pur

5、pose P.2 Applicability P.3 Authority P.4 Applicable Documents P.5 References P.6 Cancellation Document Content 1. Definitions 2. Responsibilities 3. Procedures 4. Records 5. Flow Diagram Appendix A Conducting Successful Reviews A.1 Program/Project Readiness A.2 RID Criteria/Ground Rules A.3 PreRID S

6、creening A.4 RID Tracking A.5 Review Kickoff Meeting A.6 Pre-board and Board A.7 Example RID form Appendix B Acronyms Appendix C Systems Engineering Review “Focus Items” Figure A 4-1 Typical RID Tracking Chart Example Table 3-1 Flight Systems and Ground Support Project Reviews Table C-1A PDR “Focus

7、Items” Table C-1B PDR “Focus Items” (continued) Table C-2A Life Cycle “Focus Item” Maturity Table C-2B Life Cycle “Focus Item” Maturity (continued) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 Technical Review

8、s and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Programs and Projects Date: Page 4 of 63 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE PREFACE P.1 PURPOSE This Marshall Procedur

9、al Requirement (MPR) document provides requirements for planning and conducting formal Technical Reviews compliant with NASA Procedural Requirements (NPR) 7123.1 and NPR 7120.5. It provides a consistent and disciplined process to assure thorough technical reviews and adequate management oversight pr

10、ior to authorization for programs/projects to proceed to the next stage of development. P.2 APPLICABILITY This MPR applies to the personnel, programs, projects, and activities at Marshall Space Flight Center (MSFC) and MSFCs Michoud Assembly Facility (MAF), including contractors and resident agencie

11、s to the extent specified in their respective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement parties.) P.3 AUTHORITY a. NPR 7120.5, “NASA Space Flight Program a

12、nd Project Management Requirements” b. NPR 7123.1, “NASA Systems Engineering Processes and Requirements” P.4 APPLICABLE DOCUMENTS a. NPR 1441.1, “NASA Record Retention Schedules” b. MPD 1150.1, “Establishment of Councils, Boards, and Committees” c. MPR 1440.2, “MSFC Records Management Program” d. MP

13、R 7120.1, “Program/Project Planning” e. MPR 7123.1, “MSFC Systems Engineering Processes and Requirements” f. MPR 8040.1, “Configuration Management, MSFC Programs/Projects” g. MPR 8823.1, “Design Control of Facilities” P.5 REFERENCES a. NASA/SP-2007-6105, “NASA Systems Engineering Handbook” Provided

14、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 Technical Reviews and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Programs and Projects Date: Page 5 of 63 CHECK THE MASTER LIST at https:/r

15、epository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE b. MPR 8500.1, “MSFC Environmental Management Program” c. MSFC-HDBK-3173, “Project Management and Systems Engineering Handbook” P.6 CANCELLATION None Original signed by Robert M. Lightfoot Acting Dir

16、ector Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 Technical Reviews and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Programs and Projects Date: Page 6 of 63 CHECK THE MASTER L

17、IST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT CONTENT 1. DEFINITIONS 1.1 Board - The management panel that serves as the final disposition authority for RIDs. This is an ad hoc Board, in accordance with MPD 1150.1. 1.2 Ce

18、nter Management Council (CMC) - The council at a Center that performs oversight of all Center programs and projects by evaluating all program and project work executed at the Center. 1.3 Data Package - Package of Review Documentation and supporting Reference Documents, provided for evaluation during

19、 the review. 1.4 Decision Authority (DA) - The Agencys responsible individual who authorizes the transition at a Key Decision Point (KDP) to the next life-cycle phase for a program/project. 1.5 Designated Governing Authority (DGA) - The management entity above the program, project, or activity level

20、 with technical oversight responsibility. The Center Director or the person or organization that has been designated to ensure the appropriate level of technical management oversight. The DGA is the final approval signature on the Systems Engineering Management Plans (SEMPs), waiver authorizations,

21、and other key technical documents. 1.6 Document Developer - Individual or organization involved in development of the documents comprising the Data Package. 1.7 Disposition - Authorized Individual, Committee, Board and/or Pre-board approval of a proposed plan of action to resolve a RID. 1.8 Editoria

22、l Comments - Comments that do not relate to or affect technical content, e.g., typographical errors, punctuation, grammar, misspelled words, different way of saying the same thing, and format. 1.9 KDP - An event where the DA makes a decision on the readiness of a program/project to progress to the n

23、ext phase of the life-cycle. 1.10 Mission Management Team (MMT) - The management team that evaluates performance during specific missions and makes decisions on implementing mission operations to obtain the mission objectives. 1.11 Peer Review - Independent evaluation by internal or external subject

24、 matter experts who do not have a vested interest in the work product under review. Peer reviews can be planned and focused reviews conducted on selected work products by the producers peers to identify defects and issues prior to that work product moving into a milestone review or approval cycle. P

25、rovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 Technical Reviews and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Programs and Projects Date: Page 7 of 63 CHECK THE MASTER LIST at

26、https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 1.12 Pre-board - The panel, chaired by the Chief Engineer (CE) or designee, that serves as an intermediate management review authority between the Review Committee/Team and the Board. The Pre

27、-board recommends RID dispositions to the Board, and forwards RIDs to the Board that are out-of-scope as defined in the Review Plan. 1.13 Preliminary Review Item Discrepancy (PreRID) - An identified discrepancy presented to the RID Screening Lead/Committee for evaluation of compliance with the revie

28、w plan RID criteria and ground rules. 1.14 Reference Documentation - Documentation against which the Review Documentation is assessed for compliance. 1.15 Review Committee - A committee who assesses the Data Package for compliance with the review objectives and criteria established in the Review Pla

29、n. In addition, a review committee assesses and recommends the disposition of RIDs. 1.16 Review Documentation - Documentation provided to the Review Committee to be evaluated in accordance with the Review Plan. 1.17 Review Plan - Document provided by the Program/Project Manager (PM), that establishe

30、s the objectives and scope of the Review, entrance and success criteria, data package contents, RID criteria, Review Committee/Review Team roles and responsibilities, and other plans/ground rules for the review. 1.18 Review Team - One or more subsets of the Review Committee that assess a specific ar

31、ea of the data package. 1.19 RID - An accepted PreRID that has been assigned a RID tracking number and is entered into the RID tracking system for disposition. 1.20 RID Actionee - An individual who is assigned a formal action item required to implement an approved action identified in a RID disposit

32、ion. 1.21 RID Closure - Formal approval of RID resolution, based upon documented evidence of completion of actions required by the RID Disposition. 1.22 RID Criteria - The criteria, defined in the Review Plan, used to determine whether or not a PreRID meets the scope and purpose of the review. 1.23

33、RID System Coordinator - Individual responsible for administering the RID tracking process. 1.24 Screening Committee - A committee assigned to assist the Screening Lead in evaluating PreRIDs to determine if they are compliant with the review criteria and ground rules defined in Provided by IHSNot fo

34、r ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 Technical Reviews and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Programs and Projects Date: Page 8 of 63 CHECK THE MASTER LIST at https:/repository.ms

35、fc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE the review plan. 1.25 Screening Lead - The individual appointed by the Chief Engineer (CE) with authority to lead the Screening Committee that reviews and determine validity of proposed PreRIDs and RIDs for comp

36、liance with review criteria/ground rules. 1.26 Standing Review Board (SRB) - The entity responsible for conducting independent reviews of the program/project per the life-cycle requirements defined in NPR 7123.1 and NPR 7120.5. The SRB is advisory and is chartered to objectively assess the material

37、presented by the program/project at a specific review. 1.27 Technical Authority (TA) - Individuals at different levels of responsibility, who provide an independent view of matters within their respective areas of expertise. There are three distinct types of TAs: Engineering TAs, Safety and Mission

38、Assurance (S and for projects by the DA and TA (or their designees). 1.29 Valid RID - A PreRID that is determined through the screening process to define a legitimate discrepancy. Synonymous with an approved RID. 2. RESPONSIBILITIES 2.1 Program/Project Manager or designee shall: 2.1.1 Determine the

39、formal Technical Reviews to be held for the Program/Project, in accordance with this MPR. 2.1.2 Determine Program/Project readiness for the Review in accordance with 3.2.4. 2.1.3 Develop the Review Plan in accordance with 3.2.12. 2.1.4 Appoint the review Pre-board and Board membership and the Review

40、 Committee membership in accordance with 3.2.6 and 3.2.7. 2.1.5 Approve the Chairperson of the SRB. 2.1.6 Invite the SRB Chairperson to review kick-off meetings for reviews supporting a program/project KDP. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS

41、-,-,-Marshall Procedural Requirements DA01 Technical Reviews and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Programs and Projects Date: Page 9 of 63 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VE

42、RSION BEFORE USE 2.1.7 Ensure a Review Report/Presentation is prepared and delivered to the SRB upon completion of the review. 2.1.8 Serve as chairperson of the Review Board. 2.1.9 Approve RID closures in accordance with 3.2.31. 2.1.10 Document results of the Review in accordance with 3.2.27. 2.1.11

43、 Designate custodians for records in accordance with 4. RECORDS. 2.1.12 Request support from other Directorates, Offices, Centers, or other organizations for Review Committee, Pre-board, and Board membership in accordance with 3.2.6 and 3.2.7. 2.2 Directors of supporting Directorates, Offices and ot

44、her organizations shall provide requested support for Review Committee, Pre-board, and Board membership in accordance with 3.2.6 and 3.2.7. 2.3 RID System Coordinator shall set up the RID processing and tracking system in accordance with the Review Plan, and track all discrepancies from initial subm

45、ission to closure utilizing the process established in the Review Plan. 2.4 Document developers and other Program/Project team members shall: 2.4.1 Prepare presentation materials and data package contents and distribute in accordance with the Review Plan. 2.4.2 Present presentation materials at the

46、kickoff, screening meetings, boards, or other meetings as required in the Review Plan. 2.4.3 Participate as Review Committee members if required in the Review Plan. 2.4.4 Provide support and clarification to Review Committee members in order to facilitate an effective review. 2.4.5 Provide responses

47、 to RIDs as required in the Review Plan. 2.5 Review Committee/Team members shall: 2.5.1 Assess the review documents/items for compliance with reference documents, and ensure technical accuracy and completeness in accordance with review objectives stated in the Review Plan. 2.5.2 Submit PreRIDs that

48、meet the criteria/ground rules stated in the Review Plan. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 Technical Reviews and Review Item Discrepancy (RID) Processing, MPR 7123.2 Revision: Baseline MSFC Program

49、s and Projects Date: Page 10 of 63 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 2.5.3 Participate in processing RIDs with recommended dispositions to the Pre-board and Board. 2.6 Review Team leads shall: 2.6.1 Provide le

展开阅读全文
相关资源
猜你喜欢
  • BS 3321-1986 Method for measurement of the equivalent pore size of fabrics (bubble pressure test)《织物的等效孔径测量方法(气泡压力试验)》.pdf BS 3321-1986 Method for measurement of the equivalent pore size of fabrics (bubble pressure test)《织物的等效孔径测量方法(气泡压力试验)》.pdf
  • BS 3322-1981 Specification for carpenters squares and bevels《木工尺和斜角规规范》.pdf BS 3322-1981 Specification for carpenters squares and bevels《木工尺和斜角规规范》.pdf
  • BS 3332-1987 Specification for white metal bearing alloy ingots《轴承用巴比合金锭规范》.pdf BS 3332-1987 Specification for white metal bearing alloy ingots《轴承用巴比合金锭规范》.pdf
  • BS 3338-10-1961 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of iron in ingot tin tin-lead solders and white metal bearing alloys (pho.pdf BS 3338-10-1961 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of iron in ingot tin tin-lead solders and white metal bearing alloys (pho.pdf
  • BS 3338-11-1961 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of tin in solders (nickel coil reduction method)《锡及锡合金取样及分析方法 第11部分 焊料中锡含.pdf BS 3338-11-1961 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of tin in solders (nickel coil reduction method)《锡及锡合金取样及分析方法 第11部分 焊料中锡含.pdf
  • BS 3338-13-1965 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of antimony in solders and white metal bearing alloys (volumetric potassi.pdf BS 3338-13-1965 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of antimony in solders and white metal bearing alloys (volumetric potassi.pdf
  • BS 3338-14-1965 Methods for the sampling and analysis of tin and tin alloys - Method for the sampling of white metal bearing alloy ingots《锡及锡合金的取样及分析方法 第14部分 轴承用巴比合金锭取样方法》.pdf BS 3338-14-1965 Methods for the sampling and analysis of tin and tin alloys - Method for the sampling of white metal bearing alloy ingots《锡及锡合金的取样及分析方法 第14部分 轴承用巴比合金锭取样方法》.pdf
  • BS 3338-15-1965 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of copper and lead in white metal bearing alloys (electrodeposition metho.pdf BS 3338-15-1965 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of copper and lead in white metal bearing alloys (electrodeposition metho.pdf
  • BS 3338-16-1965 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of tin in white metal bearing alloys (nickel coil reduction method)《锡及锡合金.pdf BS 3338-16-1965 Methods for the sampling and analysis of tin and tin alloys - Method for the determination of tin in white metal bearing alloys (nickel coil reduction method)《锡及锡合金.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1