1、*USACE / NAVFAC / AFCESA / NASA UFGS-40 18 00.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-40 18 00 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 40 - PROCESS INTEGRATIONSECTION 40 18 00.
2、00 40VACUUM SYSTEMS PROCESS PIPING02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 GENERAL REQUIREMENTS1.4 PREDICTIVE TESTING AND INSPECTION TECHNOLOGY REQUIREMENTSPART 2 PRODUCTS2.1 ABOVEGROUND PIPING MATERIALS2.1.1 Vacuum Systems To 100 Kpa 29.5 Inches Of Mercury Vacuum2.1.2 Control And Instrume
3、ntation System Tubing2.1.3 Pressure Gages2.1.4 Thermometers2.1.5 Grooved Pipe Couplings And Fittings2.1.6 Metallic Expansion Joints2.2 VALVES2.2.1 Ball Valves, Vacuum (BAVV)2.2.2 Butterfly Valves, Vacuum (BUVV)2.2.3 Diaphragm Control And Instrument Valves (DCIV)2.2.4 Gage Cocks (GC)2.2.5 Globe And A
4、ngle Valves (GLV And ANV)2.3 MISCELLANEOUS MATERIALS2.3.1 Bolting2.3.2 Elastomer Calk2.3.3 Flashing2.3.4 Flange Gaskets2.3.5 Pipe Thread Compounds2.4 SUPPORTING ELEMENTS2.4.1 Supports2.4.2 Building Structure Attachments2.4.3 Horizontal Pipe Attachments2.4.4 Vertical Pipe Attachments2.4.5 Hanger Rods
5、 And Fixtures2.4.6 Supplementary SteelSECTION 40 18 00.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 3 EXECUTION3.1 ABOVEGROUND PIPING SYSTEMS INSTALLATION3.1.1 Piping Systems3.1.2 Joints3.1.3 Control And Instrument Air Piping3.1.4
6、 Supporting Elements Installation3.1.5 Sound Stopping3.1.6 Sleeves3.1.7 Escutcheons3.1.8 Flashings3.2 VACUUM SYSTEMS TESTING3.2.1 Vacuum Systems3.2.2 Test Gages3.2.3 Acceptance Pressure Testing3.2.4 Acceptance Vacuum Testing- End of Section Table of Contents -SECTION 40 18 00.00 40 Page 2Provided by
7、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-40 18 00.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-40 18 00 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated
8、 April 2011*SECTION 40 18 00.00 40VACUUM SYSTEMS PROCESS PIPING02/11*NOTE: This specification covers the requirements for aboveground low-vacuum systems defined for the purposes of this section as systems at pressures less than atmospheric and ranging to approximately 100 kilopascal (29.5 inches of
9、mercury), 1.734 kilopascal (0.25144 psi) or 13 millimeter of mercury 29.5 inches of mercury vacuum or the approximately absolute; 0.25144 pound per square inch, absolute, 13,000 microns of mercury absolute, or 13 torr.Drawings must completely detail anchors, restraining guides, sway braces, and shoc
10、k absorbing provisions to accommodate reaction forces encountered, as well as other piping support elements not covered by the following specifications.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project
11、 specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not bra
12、ckets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide SECTION 40 18 00.00 4
13、0 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check R
14、eference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this sectio
15、n of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN ASSOCIATION OF STATE
16、HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)AASHTO M 314 (1990; R 2008) Standard Specification for Steel Anchor BoltsAMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)ANSI/AISC 360 (2005) Specification for Structural Steel BuildingsAMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C207 (2007) Standard for S
17、teel Pipe Flanges for Waterworks Service-Sizes 100 mm through 3600 mm 4 in. through 144 in.AWWA C208 (2007; Errata 2009) Standard for Dimensions for Fabricated Steel Water Pipe FittingsAWWA C504 (2010) Standard for Rubber-Seated Butterfly ValvesAMERICAN WELDING SOCIETY (AWS)AWS WHB-2.9 (2004) Weldin
18、g Handbook; Volume 2, Welding Processes, Part 1ASME INTERNATIONAL (ASME)ASME B16.1 (2010) Gray Iron Threaded Fittings; Classes 25, 125 and 250ASME B16.11 (2009) Forged Fittings, Socket-Welding and ThreadedSECTION 40 18 00.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitt
19、ed without license from IHS-,-,-ASME B16.22 (2001; R 2010) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure FittingsASME B16.3 (2006) Malleable Iron Threaded Fittings, Classes 150 and 300ASME B16.39 (2009) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300A
20、SME B16.5 (2009) Pipe Flanges and Flanged Fittings: NPS 1/2 Through NPS 24 Metric/Inch StandardASME B16.9 (2007) Standard for Factory-Made Wrought Steel Buttwelding FittingsASME B18.2.1 (2010) Square and Hex Bolts and Screws (Inch Series)ASME B18.2.2 (2010) Standard for Square and Hex NutsASME B31.1
21、 (2010) Power PipingASME B31.3 (2008) Process PipingASME B40.100 (2005) Pressure Gauges and Gauge AttachmentsASME B46.1 (2009) Surface Texture, Surface Roughness, Waviness and LayASTM INTERNATIONAL (ASTM)ASTM A105/A105M (2010a) Standard Specification for Carbon Steel Forgings for Piping Applications
22、ASTM A126 (2004; R 2009) Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe FittingsASTM A139/A139M (2004; R 2010) Standard Specification for Electric-Fusion (ARC)-Welded Steel Pipe (NPS 4 and over)ASTM A181/A181M (2006) Standard Specification for Carbon Steel Forgings, for
23、General-Purpose PipingASTM A183 (2003; R 2009) Standard Specification for Carbon Steel Track Bolts and NutsASTM A197/A197M (2000; R 2006) Standard Specification for Cupola Malleable IronASTM A216/A216M (2008) Standard Specification for Steel Castings, Carbon, Suitable for Fusion Welding, for High-Te
24、mperature ServiceASTM A234/A234M (2010b) Standard Specification for Piping SECTION 40 18 00.00 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature ServiceASTM A30
25、7 (2010) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile StrengthASTM A351/A351M (2010) Standard Specification for Castings, Austenitic, for Pressure-Containing PartsASTM A436 (1984; R 2006) Standard Specification for Austenitic Gray Iron CastingsASTM A53/A53M (2010) Stan
26、dard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and SeamlessASTM A694/A694M (2008) Standard Specification for Carbon and Alloy Steel Forgings for Pipe Flanges, Fittings, Valves, and Parts for High-Pressure Transmission ServiceASTM B 148 (1997; R 2009) Standard Specifica
27、tion for Aluminum-Bronze Sand CastingsASTM B 164 (2003; R 2008) Standard Specification for Nickel-Copper Alloy Rod, Bar, and WireASTM B 280 (2008) Standard Specification for Seamless Copper Tube for Air Conditioning and Refrigeration Field ServiceASTM B 370 (2009) Standard Specification for Copper S
28、heet and Strip for Building ConstructionASTM B 62 (2009) Standard Specification for Composition Bronze or Ounce Metal CastingsASTM B 749 (2003; R 2009) Standard Specification for Lead and Lead Alloy Strip, Sheet and Plate ProductsASTM C 592 (2010) Standard Specification for Mineral Fiber Blanket Ins
29、ulation and Blanket-Type Pipe Insulation (Metal-Mesh Covered) (Industrial Type)ASTM C 920 (2011) Standard Specification for Elastomeric Joint SealantsASTM D 2000 (2008) Standard Classification System for Rubber Products in Automotive ApplicationsASTM E 1 (2007) Standard Specification for ASTM Liquid
30、-in-Glass ThermometersASTM F 1120 (1987; R 2010) Standard Specification for SECTION 40 18 00.00 40 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Circular Metallic Bellows Type Expansion Joints for Piping ApplicationsASTM F 147 (1987; R 2009)
31、Standard Test Method for Flexibility of Non-Metallic Gasket MaterialASTM F 568M (2007) Standard Specification for Carbon and Alloy Steel Externally Threaded Metric FastenersFLUID SEALING ASSOCIATION (FSA)FSA-0017 (1995e6) Standard for Non-Metallic Expansion Joints and Flexible Pipe Connectors Techni
32、cal HandbookINSTITUTE OF ENVIRONMENTAL SCIENCES AND TECHNOLOGY (IEST)IEST-STD-CC1246D (2002) Product Cleanliness Levels and Contamination Control ProgramMANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY (MSS)MSS SP-104 (2003) Wrought Copper Solder Joint Pressure FittingsMSS SP
33、-43 (2008; Errata 2010) Wrought Stainless Steel Butt-Welding FittingsMSS SP-58 (2009) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and InstallationMSS SP-67 (2002a) Butterfly ValvesMSS SP-69 (2003) Pipe Hangers and Supports - Selection and Application (ANSI
34、Approved American National Standard)MSS SP-72 (2010) Ball Valves with Flanged or Butt-Welding Ends for General ServiceMSS SP-80 (2008) Bronze Gate, Globe, Angle and Check ValvesMSS SP-83 (2006) Class 3000 Steel Pipe Unions Socket Welding and ThreadedMSS SP-86 (2009) Guidelines for Metric Data in Sta
35、ndards for Valves, Flanges, Fittings and ActuatorsNATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)RCBEA GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance GuideSECTION 40 18 00.00 40 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license
36、from IHS-,-,-SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)SAE AMS-C-6183 (1998; R 2007) Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant GasketsU.S. DEPARTMENT OF DEFENSE (DOD)MIL-PRF-25567 (1998; Rev E; Notice 1 2005; Notice 2 2010) Leak Detection Compound, Oxygen System
37、s (Metric)U.S. GENERAL SERVICES ADMINISTRATION (GSA)FS FF-S-325 (Int Amd 3) Shield, Expansion; Nail, Expansion; and Nail, Drive Screw (Devices, Anchoring, Masonry)1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list t
38、o reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G
39、” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters wi
40、thin the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “A
41、O“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government ap
42、proval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit t
43、he following in accordance with Section 01 33 00 SECTION 40 18 00.00 40 Page 8Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SUBMITTAL PROCEDURES:SD-02 Shop DrawingsSubmit Detail Drawings in accordance with paragraph entitled, “General Requirements,
44、“ of this section.Submit installation drawings for low-vacuum piping systems in accordance with paragraph entitled, “Aboveground Piping Systems Installation,“ of this section.SD-03 Product DataSubmit manufacturers catalog data for the following items:Aboveground Piping MaterialsValvesMiscellaneous M
45、aterialsSupporting ElementsSD-06 Test ReportsSubmit test reports for the following items showing Government and Contractor test personnel responsibilities, dates, test gage identification numbers, ambient temperatures, pressure ranges, rates of pressure drop, and leakage rates.Hydrostatic TestsLeaka
46、ge TestsSD-07 CertificatesSubmit certificates for the following items showing conformance with the referenced standards contained in this section.Aboveground Piping MaterialsValvesMiscellaneous MaterialsSupporting Elements1.3 GENERAL REQUIREMENTS*NOTE: If Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND