[外语类试卷]BEC商务英语(初级)听力模拟试卷114(无答案).doc

上传人:ideacase155 文档编号:857057 上传时间:2019-02-23 格式:DOC 页数:6 大小:82KB
下载 相关 举报
[外语类试卷]BEC商务英语(初级)听力模拟试卷114(无答案).doc_第1页
第1页 / 共6页
[外语类试卷]BEC商务英语(初级)听力模拟试卷114(无答案).doc_第2页
第2页 / 共6页
[外语类试卷]BEC商务英语(初级)听力模拟试卷114(无答案).doc_第3页
第3页 / 共6页
[外语类试卷]BEC商务英语(初级)听力模拟试卷114(无答案).doc_第4页
第4页 / 共6页
[外语类试卷]BEC商务英语(初级)听力模拟试卷114(无答案).doc_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、BEC 商务英语(初级)听力模拟试卷 114(无答案)一、PART ONE1 Where will the meeting take place?(A)Four Seasons Hotel(B) Shangri-La Hotel(C) Hilton Hotel2 What kind of decoration does the man want to use to welcome the new employee?3 What department will the company not grant for?(A)Mechanical Maintenance(B) Geometries En

2、gineering Technology(C) Civil Engineering4 When will the flight take off?(A)12: 25(B) 13: 45(C) 11: 555 Which line shows the product performance correctly? Unit: ten thousand6 Which office equipment will Shannon use later?7 What is the right design of the business card?8 Which chart could correctly

3、signify the sales distribution of the company?二、PART TWO8 Look at the notes below.Some information is missing.You will hear a man telephoning Human Resources about details of one apprentice last winter.For each question (9-15), fill in the missing information in the numbered space using a word, numb

4、ers or letters.After you have listened once, replay each recording.APPRENTICE RECORDinformation inquirer: 【A1】 Alex, from_DepartmentInformation provided to: 【A2】 The_Bureau.Name of that undergraduate: 【A3】_Newsome.Address No. : 【A4】_Education Road, BarnfieldServe for: 【A5】_DepartmentJobtitle: 【A6】_.

5、Salary: 【A7】( )_.9 【A1】10 【A2】11 【A3】12 【A4】13 【A5】14 【A6】15 【A7】三、PART THREE15 Look at the notes below about a companys plans for shoes promotion this spring.Some information is missing.You will hear part of a talk by the companys General Manager.For each question (16-22), fill in the missing infor

6、mation in the numbered space using one or two words.After you have listened once, replay the recording.Spring promotion plansMain titles: Sneakers and 【B1】_.Advertised in: 【B2】_.(full pays)The latest colour for decoration 【B3】_.for standsFree samples include 【B4】_.Diana closes one contract with 【B5】

7、Mailshots wont be ready till 【B6】_.(Month)Location for the press conference: 【B7】_.16 【B1 】17 【B2 】18 【B3 】19 【B4 】20 【B5 】21 【B6 】22 【B7 】四、PART FOUR22 You will hear an interview of a recruiter supervisor Catherine Liz.For each question (23-30), mark one letter (A, B or C) for the correct answer.

8、After you have listened once, replay the recording.23 From womans words, we can infer that(A)the company has established before long.(B) that man is not very famous.(C) people do not understand the company well.24 The business scope of the company does not include(A)pawning.(B) sale.(C) rental.25 Wh

9、at is the real quality and feature of Bear?(A)It has been a non-profit organization.(B) It is a profitable company.(C) It has no virtual office building.26 Why does the company try to maximize social good rather than profits?(A)They want to borrow money or sell stock to the public.(B) Its more inter

10、esting.(C) They do it like this for many years.27 Whats mans attitude to the Internet crimes?(A)It is not serious, so we shouldnt worry about it.(B) The high proportion of such crime could be very dangerous.(C) Some control is needed and companies should carry their social responsibility.28 How does

11、 the company make money?(A)From charges for clients visit(B) From charges of broker department rentals in New York State(C) From fees on employment advertisement29 Why does the company insist on remaining ad free to the mans business model?(A)It is based on clients will.(B) They decide all by themselves.(C) Its the companys strategy in different areas.30 What is the mans attitude towards the womans interview?(A)Being careless to answer questions(B) Having fun to be there(C) Being a little impatient with womans questions

展开阅读全文
相关资源
猜你喜欢
  • EN 308-1997 en Heat Exchangers - Test Procedures for Establishing Performance of Air to Air and Flue Gases Heat Recovery Devices《热交换器 建立空气对空气和烟道煤气恢复装置的性能的试验过程 代替ENV 308-1990》.pdf EN 308-1997 en Heat Exchangers - Test Procedures for Establishing Performance of Air to Air and Flue Gases Heat Recovery Devices《热交换器 建立空气对空气和烟道煤气恢复装置的性能的试验过程 代替ENV 308-1990》.pdf
  • EN 3080-2006 en Aerospace series - Pipe coupling 8 - in titanium alloy - Tees reduced branch with thrust wire nut《航空航天系列 钛合金830-管连接件 带止推金属丝螺母的缩短三通》.pdf EN 3080-2006 en Aerospace series - Pipe coupling 8 - in titanium alloy - Tees reduced branch with thrust wire nut《航空航天系列 钛合金830-管连接件 带止推金属丝螺母的缩短三通》.pdf
  • EN 3081-2001 en Aerospace Series - Pipe Coupling 8 Degrees 30 in Titanium Alloy - Ferrules Welded with Dynamic Beam Seal End for Repair《航空航天系列 钛合金管连接件830- 修理用带动态梁密封端头的焊接箍圈》.pdf EN 3081-2001 en Aerospace Series - Pipe Coupling 8 Degrees 30 in Titanium Alloy - Ferrules Welded with Dynamic Beam Seal End for Repair《航空航天系列 钛合金管连接件830- 修理用带动态梁密封端头的焊接箍圈》.pdf
  • EN 3082-2001 en Aerospace Series - Pipe Coupling 8 Degrees 30 in Titanium Alloy - Unions Bulkhead Welded End for Repair《航空航天系列 钛合金管连接件830 修理用闷头焊接活接头》.pdf EN 3082-2001 en Aerospace Series - Pipe Coupling 8 Degrees 30 in Titanium Alloy - Unions Bulkhead Welded End for Repair《航空航天系列 钛合金管连接件830 修理用闷头焊接活接头》.pdf
  • EN 3083-2001 en Pipe Coupling 8 Degrees 30 in Titanium Alloy - Unions Bulkhead Long Welded End for Repair《航空航天系列 钛合金管连接件830- 修理用闷头长焊接端头活接头》.pdf EN 3083-2001 en Pipe Coupling 8 Degrees 30 in Titanium Alloy - Unions Bulkhead Long Welded End for Repair《航空航天系列 钛合金管连接件830- 修理用闷头长焊接端头活接头》.pdf
  • EN 3084-2001 en Aerospace Series - Pipe Coupling 8 Degrees 30 in Titanium Alloy - Unions Welded End Threaded for Repair《航空航天系列 钛合金管连接件830- 修理用焊接端头螺纹活接头》.pdf EN 3084-2001 en Aerospace Series - Pipe Coupling 8 Degrees 30 in Titanium Alloy - Unions Welded End Threaded for Repair《航空航天系列 钛合金管连接件830- 修理用焊接端头螺纹活接头》.pdf
  • EN 309-2005 en Particleboards - Definition and classification《碎料板 定义和分类》.pdf EN 309-2005 en Particleboards - Definition and classification《碎料板 定义和分类》.pdf
  • EN 3094-2017 en Aerospace series - Sealants - Test method - determination of the application time.pdf EN 3094-2017 en Aerospace series - Sealants - Test method - determination of the application time.pdf
  • EN 31-2011 en Wash basins - Connecting dimensions (Incorporates Amendment A1 2014)《洗脸盆 连接尺寸》.pdf EN 31-2011 en Wash basins - Connecting dimensions (Incorporates Amendment A1 2014)《洗脸盆 连接尺寸》.pdf
  • 相关搜索
    资源标签

    当前位置:首页 > 考试资料 > 大学考试

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1