2019春七年级英语下册Module9Lifehistory模块语法专练课时作业(新版)外研版.docx

上传人:sofeeling205 文档编号:920580 上传时间:2019-03-03 格式:DOCX 页数:2 大小:65.01KB
下载 相关 举报
2019春七年级英语下册Module9Lifehistory模块语法专练课时作业(新版)外研版.docx_第1页
第1页 / 共2页
2019春七年级英语下册Module9Lifehistory模块语法专练课时作业(新版)外研版.docx_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、1Module9模块语法专练一般过去时(三)我们已经学习了行为动词过去式的规则变化,即“动词原形+-ed”的形式。在本模块中,我们所学的动词过去式的构成方式较为独特,这类动词被称为不规则动词。不规则动词的过去式变化没有规律,需要单独记忆。1.不规则动词的过去式的构成。(1)过去式与原形相同:costcost,hithit,hurthurt,letlet,putput,cutcut,readread,beatbeat等。(2)过去式与原形不同:gowent,meetmet,comecame,taketook,eatate,seesaw,writewrote,swimswam,makemade,f

2、indfound,givegave 等。2.句型结构。含不规则动词的一般过去时的肯定句、否定句、一般疑问句以及特殊疑问句都与规则动词的句型结构相同。例如:Theyswaminthelake.他们在湖里游泳。Theydidntswiminthelake.他们不在湖里游泳。Didtheyswiminthelake?他们在湖里游泳了吗?Yes,theydid./No,theydidnt.是的,他们游了。/不,他们没游。.单项填空(B)1.Did you play computer games last night? .I did my homework till eleven oclock. 2A.

3、Yes,I did B.No,I didntC.Yes,I was D.No,I wasnt(A)2.My grandma the newspaper last night. A.read B.readsC.reading D.is reading(B)3.He to school last Monday because he lost his bike. A.walks B.walkedC.rides D.rode(C)4.When you to China? In February,1999.A.do;come B.do;cameC.did;come D.did;came(B)5.He a

4、 doctor when he left his school. A.become B.becameC.becomes D.becoming.根据句意用所给词的适当形式填空1.Did you see (see) the film Titanic last night? No,but I watched (watch) an important football match on TV. 2.The boy drew (draw) many pictures before I came here. 3.Why does the boy look upset?Because he did (do) something wrong. 4.He lost (lose) his dog yesterday and couldnt (can not) find it anywhere. 5.Wang Hong taught (teach) English in a junior school five years ago.

展开阅读全文
相关资源
猜你喜欢
  • DIN SPEC 18538-2012 Supplementary provisions to DIN EN 12699 2001-05 Execution of special geotechnical work - Displacement piles《DIN EN 12699-2001-05的补充条款 特殊土工工程的实施 送入桩》.pdf DIN SPEC 18538-2012 Supplementary provisions to DIN EN 12699 2001-05 Execution of special geotechnical work - Displacement piles《DIN EN 12699-2001-05的补充条款 特殊土工工程的实施 送入桩》.pdf
  • DIN SPEC 18539-2012 Supplementary provisions to DIN EN 14199 2012-01 Execution of special geotechnical works - Micropiles《DIN EN 14199-2012-01的补充条款 特殊土工工程的实施 微型桩》.pdf DIN SPEC 18539-2012 Supplementary provisions to DIN EN 14199 2012-01 Execution of special geotechnical works - Micropiles《DIN EN 14199-2012-01的补充条款 特殊土工工程的实施 微型桩》.pdf
  • DIN SPEC 18913-2010 Spectator facilities - Layout criteria for viewing area for spectators with special needs German version CEN TR 15913 2009《观众设施 有特殊需要观众的观看区域布局准则 德文版本CEN TR 1591.pdf DIN SPEC 18913-2010 Spectator facilities - Layout criteria for viewing area for spectators with special needs German version CEN TR 15913 2009《观众设施 有特殊需要观众的观看区域布局准则 德文版本CEN TR 1591.pdf
  • DIN SPEC 18941-2010 Sustainability of construction works - Environmental product declarations - Methodology for selection and use of generic data German version CEN TR 15941 2010《建.pdf DIN SPEC 18941-2010 Sustainability of construction works - Environmental product declarations - Methodology for selection and use of generic data German version CEN TR 15941 2010《建.pdf
  • DIN SPEC 19426-2-2017 Auto-ID-systems for the digital identification and classification of Personal Protection Equipment (PPE) - Part 2 Guideline for the selection of the required .pdf DIN SPEC 19426-2-2017 Auto-ID-systems for the digital identification and classification of Personal Protection Equipment (PPE) - Part 2 Guideline for the selection of the required .pdf
  • DIN SPEC 19674-1-2011 Plastics piping systems made from glass fibre reinforced polyethylene (PE-GF) for water supply and for drainage and sewerage under pressure - Part 1 General《供.pdf DIN SPEC 19674-1-2011 Plastics piping systems made from glass fibre reinforced polyethylene (PE-GF) for water supply and for drainage and sewerage under pressure - Part 1 General《供.pdf
  • DIN SPEC 19674-2-2011 Plastics piping systems made from glass fibre reinforced polyethylene (PE-GF) for water supply and for drainage and sewerage under pressure - Part 2 Pipes《供水 .pdf DIN SPEC 19674-2-2011 Plastics piping systems made from glass fibre reinforced polyethylene (PE-GF) for water supply and for drainage and sewerage under pressure - Part 2 Pipes《供水 .pdf
  • DIN SPEC 19748-2012 Requirements for lining with cured-in-place pipes for renovation of drains connected to premises《与房屋连接的排水管翻修用现场加工管衬里的要求》.pdf DIN SPEC 19748-2012 Requirements for lining with cured-in-place pipes for renovation of drains connected to premises《与房屋连接的排水管翻修用现场加工管衬里的要求》.pdf
  • DIN SPEC 19755-2012 Activities relating to drinking water and wastewater services - Guidelines for the assessment and for the improvement of the service to users《饮用水和废水服务设施的相关工作 评估.pdf DIN SPEC 19755-2012 Activities relating to drinking water and wastewater services - Guidelines for the assessment and for the improvement of the service to users《饮用水和废水服务设施的相关工作 评估.pdf
  • 相关搜索

    当前位置:首页 > 考试资料 > 中学考试

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1