1、I MIL-B-85599 (AS) AMENDMENT 1 9 OCTOBER 1986 MILITARY SPECIFICATION BOOSTER, FUZE, MARK 60 MOD 2 This amendment forms a part of Military Specification MIL-B-85599(AS) Dated. 17 October 1983, and is approved for use within the Naval Air Systems Command, Department of the Navy, and is available for u
2、se by all Departments and Agencies of the Department of Defense. PAGE 6 4.2.2, line 10, Delete: “Table B-1, k valuet1 and substitute “Table B-1, Sample size code letter G, k value.ll PAGE 13 4.6.3.3b, Delete in its entirety and substitute: 114.6.3.3b, Subject the booster to the test of MIL-STD-810,
3、Method 514.2, Equipment Category d. 1, Procedure IIA, Table 5 14.2-1V, Figure 514.2-4, parametric values fl=1000 Hz., f2=2000 Hz., wk.01 g2/Hz., w2z.12 g2/Hz. The vibration shall be applied for a period of one hour aiong each of three mutually perpendicular axes, for a total test time of three hours
4、. First article boosters shall be temperature-conditioned to and vibrated at the following temper- atures (see Figure 4): (1) Ten boosters at +160 f F. (2) Ten boosters at -65 15 ao F. NOTE: To prevent damage to test equipment, limiting of instantaneous acceleration peaks to three times the overall
5、root- mean-square acceleration level is permitted,11 PAGE 14 4.6.4.3, Before warning note add the following note: “NOTE A New FSU-1O/A simulator (SAI 137632160-192) will be required for each cook-off test.“ /- Preparing activity (Project 1336-lu534 1 AMSC NIA Navy - AS DISTRTBUTION STATEMENT A: unlimited. Approved for public release; distribution is -. / THIS DOCUMENT CONTAINS i PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-