NAVY MIL-C-19064 B (2)-1978 CONNECTOR OXYGEN HOSE TO REGULATOR《氧气软管调节连接器》.pdf

上传人:hopesteam270 文档编号:977444 上传时间:2019-03-13 格式:PDF 页数:3 大小:126.40KB
下载 相关 举报
NAVY MIL-C-19064 B (2)-1978 CONNECTOR OXYGEN HOSE TO REGULATOR《氧气软管调节连接器》.pdf_第1页
第1页 / 共3页
NAVY MIL-C-19064 B (2)-1978 CONNECTOR OXYGEN HOSE TO REGULATOR《氧气软管调节连接器》.pdf_第2页
第2页 / 共3页
NAVY MIL-C-19064 B (2)-1978 CONNECTOR OXYGEN HOSE TO REGULATOR《氧气软管调节连接器》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、rn MIL-C-17064B (2) Lb m 7777706 CIL71330 4 m-/ MIL-C-19064B Amendment 2 5 January 1978 SUPERSEDES Amendment 1 15 February 1965 MILITARY SPECIFICATION CONNECTORS, OXYGEN HOSE TO REGULATOR This amendment forms a part of Military Specification MIL-C-l9064B, dated 30 September 1964, and is approved for

2、 use by all Departments and Agencies of the Department of Defense. Page 1 2.1 SPECIFICATIONS - Military Delete: “MIL-F-22191 Films, Transparent, FlexibleHeat Sealablp, for Packing Applications“ Add: “MIL-B-22191 Barriers, Materials, Transparent, Flexible, Heat Sea 1 ab 1 et Add the following to the

3、bottom of the page: Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Engineering Specifications and Standards Department, Code 93, Lakehurst, New Jersey 08733 by using the self-addressed Standard

4、 Document Improve- ment Proposal (DD Form 1426) appearing at the end of this,document or by letter. Commanding Officer, Naval Air Engineering Center, Page 2 2.1 STANDARDS - Military Delete: “MS 33586 Metals, Definition of Dissimilar“ Add : “MIL-STD-889. Dissimilar Metals“ 3.1 “3.1 specification shal

5、l be a product which has been inspected and passed the first article inspection specified herein.“ Delete and substitute the following: First Article Inspection - The connector furnished under this 3.2 Delete 3.3.1.1, line 3 - Delete “MS33586“ and substitute “MIL-STD-889“ A Provided by IHSNot for Re

6、saleNo reproduction or networking permitted without license from IHS-,-,-.- MIL-C-19064B AMENDMENT 2 Page 3 4.2 (a) Delete and substitute the following: 1 “(a) First Article Inspection - First article inspection consists of examinations and tests performed on samples which are repre- sentative of th

7、e production item after award of a contract to determine that the production item meets the requirements of this specification.“ Page 4 4.3 Delete and substitute the following: “4.3 First Article Inspection - First article inspection shall consist of all the examinations and tests of this specificat

8、ion“. 4.3.1 Delete and substitute the following: “4.3.1 First Article Inspection - Unless otherwise specified, as soon as practicable after the award of the contract or order, the manu- facturer shall submit five connectors. The samples shall be.represent- ative of the construction, workmanship, com

9、ponents and materials to be used during production. When a contractor is in continuous production of these connectors from contract to contract, submission of a further first article sample on the new contract may be waived at the discretion of the procuring activity (see 6.2). samples or the waivin

10、g of the first article inspection does not preclude the requirements of submitting to the quality conformance inspection. The first article samples shall be forwarded to the Government as direct- ed by the procuring activity (see 6.2). be plainly identified by securely attached durable tags marked w

11、ith the following information: Approval of the first article The first article samples shall Samples submitted by (Name) (Date) for First Article Inspect- ion in accordance with the requirements of MIL-C-19064B under Contract No. I 4.3.1.1, lines 1 and 6 - Delete “pre-production“ and substitute “Fir

12、st Art i cle “ . Page 8 5.1.1, line 5 - Delete “MIL-F-22191“ and substitute “MIL-B-22191“. Page 9 6.2(b) Delete 2 i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i MIL-C-LSOb4B (2) lb W 7797706 0171332 W I MIL-C-19064B AMENDMENT 2 6.2(d) Delete and

13、 substitute the following: “(d) Whether first article inspection is required and where the samples should be delivered“. 6.2 (h) Add “(h) Items of data required (see 6.3)“ 6.3 Add the following: “6.3 Contract data requirements - When this specification is used in a procurement which incorporates a D

14、D Form 1423 and invokes the provisions of 7-104.9(n) of the Armed Services Procurement Regulations, the data requirements identified below will be developed as specified by an approved Data Item Description (DD Form 1664) and delivered in accord- ance with the approved Contract Data Requirements Lis

15、t (DD Form 1423) incoborated into the contract. When the provisions of ASPR-7-104.9 (n) are not invoked, the data specified below will be delivered by the contractor in accordance with the contract requirements. Deliverable data required by this specification is cited in the following para- graphs :

16、 Paragraph Data Requirement Applicable DID 4.3.1.1 First Article Inspection Reports DI-T-5329 Inspection Test Report“ 6.4 Add the following: “6.4 When a first article is required, it shall be tested under the appropriate provisions of 7-104.55 of the Armed Services Pro- curement Regulation. The firs

17、t article should be a sample selected from the initial procurement items. The contracting officer should include specific instructions in all procurement instruments, regarding arrange- ments for examinations, test and approval of the first article.“ Custodians: Al? - 99 Army - AV Navy - AS Preparing Activity: Navy - AS Project No. 1660-0349 *US. GOVERNMENT PRINTING OFFICE: 1978 - 703-122/619 3 I I 0 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • GOST 25796 2-1983 Raw clay in the production of clay powders for drilling muds Methods of determination of suspension properties《打钻溶液的粘土粉末用粘土原料 悬浮体特性测定法》.pdf GOST 25796 2-1983 Raw clay in the production of clay powders for drilling muds Methods of determination of suspension properties《打钻溶液的粘土粉末用粘土原料 悬浮体特性测定法》.pdf
  • GOST 25796 3-1983 Raw clay in the production of clay powders for drilling muds Method of determination of mass fraction of sand《打钻溶液的粘土粉末用粘土原料 砂粒含量测定法》.pdf GOST 25796 3-1983 Raw clay in the production of clay powders for drilling muds Method of determination of mass fraction of sand《打钻溶液的粘土粉末用粘土原料 砂粒含量测定法》.pdf
  • GOST 25796 4-1983 Raw clay in the production of clay powders for drilling muds Method of determination of suspension sedimentation index《打钻溶液的粘土粉末用粘土原料 悬浮体沉降指标测定法》.pdf GOST 25796 4-1983 Raw clay in the production of clay powders for drilling muds Method of determination of suspension sedimentation index《打钻溶液的粘土粉末用粘土原料 悬浮体沉降指标测定法》.pdf
  • GOST 25796 5-1983 Raw clay in the production of clay powders for drilling muds Method of determination of beneficiation index《打钻溶液的粘土粉末用粘土原料 变性指标测定法》.pdf GOST 25796 5-1983 Raw clay in the production of clay powders for drilling muds Method of determination of beneficiation index《打钻溶液的粘土粉末用粘土原料 变性指标测定法》.pdf
  • GOST 25804 1-1983 Atomic power station technological processes control system equipment General《原子能发电站工艺过程操纵系统用仪器 仪表 装置和设备 基本规则》.pdf GOST 25804 1-1983 Atomic power station technological processes control system equipment General《原子能发电站工艺过程操纵系统用仪器 仪表 装置和设备 基本规则》.pdf
  • GOST 25804 2-1983 Atomic power station technological processes control system equipment Reliability requirements《原子能发电站工艺过程操纵系统用仪器 仪表 装置和设备 可靠性要求》.pdf GOST 25804 2-1983 Atomic power station technological processes control system equipment Reliability requirements《原子能发电站工艺过程操纵系统用仪器 仪表 装置和设备 可靠性要求》.pdf
  • GOST 25804 3-1983 Atomic power station technological processes control system equipment Durability endurance resistance requirements for hignest influental factor《原子能发电站工艺过程操纵系统用仪器.pdf GOST 25804 3-1983 Atomic power station technological processes control system equipment Durability endurance resistance requirements for hignest influental factor《原子能发电站工艺过程操纵系统用仪器.pdf
  • GOST 25804 4-1983 Atomic power station technological processes control system equipmet General design-constructional requirements《原子能发电站工艺过程操纵系统用仪器 仪表 装置和设备 结构上的一般技术要求》.pdf GOST 25804 4-1983 Atomic power station technological processes control system equipmet General design-constructional requirements《原子能发电站工艺过程操纵系统用仪器 仪表 装置和设备 结构上的一般技术要求》.pdf
  • GOST 25804 5-1983 Atomic power station technological processes control system equipment General rules of conducting test specimens and serial items test and acceptance《原子能发电站工艺过程控制.pdf GOST 25804 5-1983 Atomic power station technological processes control system equipment General rules of conducting test specimens and serial items test and acceptance《原子能发电站工艺过程控制.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1