NAVY MIL-C-22770 H-1977 COILS WIRE《线圈》.pdf

上传人:tireattitude366 文档编号:977552 上传时间:2019-03-13 格式:PDF 页数:14 大小:650.93KB
下载 相关 举报
NAVY MIL-C-22770 H-1977 COILS WIRE《线圈》.pdf_第1页
第1页 / 共14页
NAVY MIL-C-22770 H-1977 COILS WIRE《线圈》.pdf_第2页
第2页 / 共14页
NAVY MIL-C-22770 H-1977 COILS WIRE《线圈》.pdf_第3页
第3页 / 共14页
NAVY MIL-C-22770 H-1977 COILS WIRE《线圈》.pdf_第4页
第4页 / 共14页
NAVY MIL-C-22770 H-1977 COILS WIRE《线圈》.pdf_第5页
第5页 / 共14页
点击查看更多>>
资源描述

1、MI-M2277 Indian Head, MD 20640 by using the self-addressed Standardization Document liqrov-nt Proposal- (ED Form 1426) appearing at the end of this documerit or by letter. c Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-JL-C-2277OH (OS) 2. APPLICAB

2、LE DOCUMETJTS 2.1 Issues of documents. The following documents of the issue in effect on the date of invitation for bids or request for proposal form a part of this specification to the extent specified herein. SPKIFICATIONS Military MIL-P-116 MIL-s-901 Preservation, -sIID-1320/2 MIL-SDI32 5/10 O Tr

3、uckloa- of Hazardcm Materiais Palletized Inadc - -le Rm Pattern Railcar mding of Hazardouc Wterialc Typical Carloaing Procedures for Palletized Unit mds Naval *a SYSt- -CI (code Ident 10001) hg 439819 L 539996 Coil, Wire, and all Parts, Subascem- - LD 539997 48 x 48 Vh pallet Mk 1 W O - blies, anCi

4、Dmmmts Listed thereon mil, Wire, and ail Parts, subassem- blies, and Documents Listed thereon ill 1874055 llq i874070 micator, Cbntinuity Xg I874073 Fixture, Tkct ihr 1874Q4 Fkture, Test Dwg 2i94I.68 f)wg 2194170 mil, Wb, Torpeda Ewg 2643986 cfrippsig -cition, Coil, Wire fShipbaard) Ix.rg 2643987 Sh

5、ippingCmditicm, Coil, Wire (%mo) ihq 2882731 %st F-ure Ascembly (Shock and Vibration) Suhnarine skipboarit Coi, Wire, Submrine Shipboard Est Equipnent Type III Coil, Wire, Suhmrine, Sipkmrd Dwg 3014059 DL 3014059 * IXKJ 3029892 Test Equigxrent Dcq 3245473 PL 3245473 mil, Wire. Suirnarine ShipM Coil,

6、 Wire, Suhnarine Shipbard 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-wg 3245474 . Coil, Wire, -Torpedo PL 3245474 Coil, Wire, Torpedo Dwg 3245921 Test Equipnent Type II (Copies of specifications, standards, drawings, and publications required

7、by suppliers in connection with specific procurenent functions should be obtained frcan the procuring activity or as directed by the contracting officer) . 3.1 General requiremsnts 3.1.1 Preproduction sqles. Unless otherwise specified.in the con- tract or order, preproduction samples of the wire coi

8、l shall be mufactured using the rriethods and procedures proposed for the production. will be tested as specified in Section 4 herein and is for the purpose of determining, prior to production, that the contractors production methods are capable of yielding items that canply with the technical requi

9、remats of the contract (see 4.3.1). The sample 3.1.2 Materials. All materials and purchased parts entering into the final assembly of the wire coil shall conform to the detailed requirements indicated on the applicable drawings and specifications. 3.1.3 Finishes, coatings, and construction. Finishes

10、, coatings, and construction for the wire coil shall be in accordance with the applicable drawings, specificatims, and publications. 3.1.4 Marking. Consecutive serialnunnbers shall be assigned for all units of each type of wire coil procured under this specification. for serial nunnbers for each typ

11、 shall be direct-STD- 1320/1 or MIliSTD-1320/2 depending on the nunher of palletized loads to be loaded. 6.1 ntended use. The wire coils are intended for use with various Marks and Wds of torpedoes and torpedo-related equipwk. 6.2 ordering data. 6.2.1 ProCuremnt requiraents. The contract or order sh

12、ould specify the follawing: (a) The specific title, nianber, and date of this specification. (b) The type coil required (see 1.2). 13 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-22770H 13 7777906 0302795 7 - MIL-2277OH (CS) (c) Ekceptions t

13、o this specification, applicable rawings, and other documente. (d) Serial nirmbers to be used. (e) That all aditimai sanples required because of failure of any unit(s) to pass prescribed periodic production inspections shall be provided and inspected at the expense of the supplier. (f) The quantity

14、of coils required. insofar as possible, the contract should be in even multiples of the palletized unit load quantity. Shipping destinations should be similarly tailored. revision to identie changes with respect to the previous issue, due to . the extensiveness of the changes. I. 6.2.2 Changes fram previous issue. Asterisks?are not used in this cuctodian Navy - (33 Prepzing Activity Navy - CE Project No. 13554389 * U. . GOVERNMENT PRINTIN0 14 1903 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1