1、 INCH-POUND MIL-DTL-18714F (OS) 19 February 2012 SUPERSEDING MIL-DTL-18714E 10 November 2011 DETAIL SPECIFICATION PRIMER, ELECTRIC, MARK 45 MOD 1 This specification is approved for use by the Naval Sea Systems Command, Department of the Navy, and is available for use by all departments and agencies
2、of the Department of Defense. 1. SCOPE 1.1 Scope. This specification establishes the minimum requirements for the Electric Primer, Mark 45 Mod 1, herein referred to as the “primer.“ 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3, 4, or 5 of this
3、 specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified req
4、uirements of documents cited in sections 3, 4, or 5 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unl
5、ess otherwise specified, the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-D-3464 Desiccants, Activated, Bagged, Packaging Use and Static Dehumidification Comments, suggestions, or questions on this document should be addressed to
6、 Department of the Navy, Indian Head Division, NSWC, Code E12P, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Maryland 20640-5085, OFFICIAL BUSINESS, or emailed to amanda.pennnavy.mil. Since contact information can change, you may want to verify the currency of this address informat
7、ion using the ASSIST Online database at https:/assist.daps.dla.mil/. AMSC N/A FSC 1390 DISTRIBUTION STATEMENT A. Approved for public release; distribution is limited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-18714F (OS) 2 DEPARTMENT OF
8、 DEFENSE SPECIFICATIONS continued MIL-T-15119 Tubing, Round, Seamless Alloy Steel MIL-P-223 Powder, Black MIL-V-16399 Varnish, Moistureproof MIL-L-296 Lacquer, Purple MIL-I-695 Insulation, Electrical, Paper (Slot-Cell) DEPARTMENT OF DEFENSE STANDARDS MIL-STD-331 Fuze and Fuze Components, Environment
9、al and Performance Tests for MIL-STD-1168 Ammunition Lot Numbering and Ammunition Data Card MIL-STD-1916 DOD Preferred Methods for Acceptance of Products DOD-STD-2101 Classification of Characteristics (Copies of these documents are available online at https:/assist.daps.dla.mil/quicksearch/ or from
10、the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unle
11、ss otherwise specified, the issues of these documents are those cited in the solicitation or contract. DRAWINGS NAVAL SEA SYSTEMS COMMAND (CAGE CODE 10001 AND 53711) 2434755 Primer, Electric, MARK 45 MOD 1 3208375 Charge, Propelling, 5-Inch, 54 Caliber, Full, MARK 67 MOD 3 (Application for copies of
12、 NAVSEA drawings should be addressed to: US Navy Major Caliber Propelling Charge AEA, Naval Surface Warfare Center Indian Head Division Picatinny Detachment, Attn: G2, Picatinny, NJ 07806-5000.) 2.3 Non-Government publications. The following documents form a part of this document to the extent speci
13、fied herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM E1742/E1742M Standard Practice for Radiographic Examination Provided by IHSNot for ResaleNo reproduction or networking permit
14、ted without license from IHS-,-,-MIL-DTL-18714F (OS) 3 ASTM D5363 Standard Specification for Anaerobic Single-Component Adhesives (AN) ASTM B633 Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel ASTM A108 Standard Specification for Steel Bar, Carbon and Alloy, Cold-Finis
15、hed ASTM A434 Standard Specification for Steel Bars, Alloy, Hot-Wrought or Cold-Finished, Quenched and Tempered ASTM A193/A193M Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications ASTM D707 Standard C
16、lassification System and Basis for Specification for Cellulose Acetate Butyrate Molding and Extrusion Compounds ASTM B152/B152M Standard Specification for Copper Sheet, Strip, Plate, and Rolled Bar ASTM B36/B36M Standard Specification for Brass Plate, Sheet, Strip, And Rolled Bar ASTM B16/B16M Stand
17、ard Specification for Free-Cutting Brass Rod, Bar and Shapes for Use in Screw Machines ASTM D4066 Standard Classification System for Nylon Injection and Extrusion Materials (PA) ASTM D6779 Standard Classification System for Polyamide Molding and Extrusion Materials (PA) (Copies of these documents ar
18、e available online at http:/www.astm.org or from the American Society for Testing and Materials Customer Service, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.) INSTITUTE FOR INTERCONNECTING AND PACKAGING ELECTRONIC CIRCUITS IPC J-STD-006 Requirements for Electronic Grade Solder Alloys an
19、d Fluxed and Non-Fluxed Solid Solders for Electronic Soldering Applications IPC J-STD-004 Requirements for Soldering Fluxes IPC J-STD-001 Requirements for Soldered Electrical and Electronic Assemblies (Copies of these documents are available online at http:/www.ipc.org/default.aspx or from the Insti
20、tute for Interconnecting and Packaging Electronic Circuits Customer Service, 3000 Lakeside Drive, 309S, Bannockburn, IL 60015.) 2.4 Order of precedence. Unless otherwise specified herein or in the contract, in the event of a conflict between the text of this document and the references cited herein,
21、 the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-18714F (OS) 4 3. REQUIRE
22、MENTS 3.1 First article and quality conformance. When specified in the solicitation or contract order (see 6.2), a sample shall be subjected to first article inspection (see 6.3) in accordance with 4.3. Primer lots shall be formed in accordance with 4.4.1. All primer lots shall be subjected to quali
23、ty conformance inspection in accordance with 4.4. 3.2 Characteristics. All primers shall be inspected according to Tables II through XXVII as specified herein. The characteristics of the primer assembly drawing (drawing 2434755), and associated components, shall be inspected for conformance in accor
24、dance with the quality requirements identified in the contract, which shall include the requirements in 4.3 and 4.4. 3.3 Radiographic (M101E). All primers shall be 100% radiographically inspected using the methods specified in 4.6.1. Primers shall not exhibit any discernible gaps as identified in Fi
25、gure 1 (locations 1, 2, and 3). The presence, correct position, and correct orientation of the components of drawing 2434755 shall be verified (except surface primer, sealing compound, and varnish, find nos. 4, 5, and 8, respectively). FIGURE 1. Gap locations 3.4 Black powder moisture content (M102)
26、. The moisture content of the black powder within the primer shall not exceed 0.70 percent by weight (see 4.6.2). 3.5 Detail strip. When required for first article inspection (see 4.3), and quality conformance inspection (see 4.4), the primer shall undergo detail strip inspection in accordance with
27、4.6.3 to verify conformance of 3.5a and 3.5b, below. Electrical resistance (see 3.6) and vibration (see 3.8) shall be performed prior to detail strip for the applicable primers. No. 1 No. 2No. 3 ACCEPTABLE UNACCEPTABLE Ignition Element, MK 1, MOD 1 Assembly Provided by IHSNot for ResaleNo reproducti
28、on or networking permitted without license from IHS-,-,-MIL-DTL-18714F (OS) 5 a. (C1) Each critical characteristic shall be as identified in Table XXVIII. b. (M103) Each major characteristic shall be as specified in Table XXVIII. 3.6 Electrical resistance (M104E). All primers shall be 100% inspected
29、 using the methods specified in 4.6.4. The primer shall have an electrical resistance of 0.10 to 0.18 ohms. 3.7 Functional. The primer shall meet the following criteria (see 4.6.5): a. (M105) Primer functioning time (see 4.6.5.3), shall be a maximum of 0.006 second; b. (M106) The primer shall not mi
30、sfire (see 6.7.1); c. (M107) The primer shall not exhibit blowback (see 6.7.2); d. (C2) Except for the blowout of the ignition element closing discs (drawing 2846969), the primer shall not exhibit a split stock, split tube, or detachment of metallic components. 3.8 Vibration. When required for first
31、 article inspection, the primer shall meet the following requirements (see 4.6.6): a. (C3) The primer shall not function during vibration; b. (C4) The stock and tube shall maintain material integrity and the primer shall maintain assembly integrity at the mating threads of the stock and tube during
32、vibration; c. (M108) The primer shall not otherwise physically breakdown during vibration; d. The primer shall meet the requirements of 3.6 after vibration; e. The primer shall meet the requirements of 3.7 after vibration. 3.9 Ballistics. When assembled into a 5“/54 propelling charge (drawing 320837
33、5) for first article inspection, the primer shall provide ignition, which will meet the criteria of 3.7 b, c, and d, and the following (see 4.6.7): a. (M109) The ejection time of the projectile from the gun barrel shall not be greater than 0.050 second after application of firing energy. 3.10 Workma
34、nship. All parts shall be free of chips, dirt, grease, rust, damage, and all other foreign materials. There shall be no burrs or other imperfections of manufacture such as cracks, sharp edges, unblended radii, and surface defects which would affect the assembly functioning or handling of the product
35、. The cleaning methods used shall not be injurious to any of the parts, nor shall the parts be contaminated by the cleaning agents. All markings shall be legible. 4. VERIFICATION 4.1 Classification of inspections. The inspection requirements specified herein are classified as follows: Provided by IH
36、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-18714F (OS) 6 a. First article inspection (see 4.3). b. Quality conformance inspection (see 4.4). 4.2 Test and examination methods. Primers shall be selected at random for each test or examination. Identifica
37、tion of each primers complete test and examination results shall be secured for additional examination until otherwise directed by the contracting activity (see 6.6). 4.3 First article inspection. The first article shall be a homogeneous (6.7.7) sample of 130 assembled primers and five-each of every
38、 component part and sub-assembly (less explosive components) fabricated, packaged, and packed in accordance with the requirements of this specification and the contract or purchase order using the methods and procedures to be used for production. The first article shall be submitted to the governmen
39、t facility designated in the contract or order for test and examination in accordance with the first article inspection plan of Table I (see 6.2 and 6.3). Prior to delivery, a first article shall be inspected and tested for all requirements specified herein. 4.3.1 Five-each inspection. 5 units of ev
40、ery part and non-explosive sub-assembly shall be selected from a population that is representative of parts to be used for standard primer production. Each of these parts and sub-assemblies shall be inspected for compliance with the requirements of their respective designs (drawings and specificatio
41、ns). These shall be the same inspections that are performed during quality conformance for parts and sub-components (see 4.4.3 and Tables II through XXVIII). 4.3.2 First article rejection. Failure of the first article sample to meet any of the requirements shall be cause for failing first article. 4
42、.4 Quality conformance inspection. 4.4.1 Lot formation. Unless otherwise specified in the contract or purchase order (see 6.2), the production lots shall consist of not more than 20,000 homogeneous (see 6.7.7) primers plus those required for inspection (see 4.4.2). Each production lot shall contain
43、only one Class 2 black powder lot and one Class 4 black powder lot (IAW MIL-P-223) and only one tubing (IAW MIL-DTL-15119) heat treat lot and one ignition element lot. 4.4.1.1 Ignition element lot. An ignition element lot shall consist of a homogenous production of MK 1 MOD 1 Ignition Elements (draw
44、ing 2434753). The following clarifications apply: a. A change in the bridge-wire manufacturers lot shall lead to a change in the ignition element lot; b. For a single lot of ignition elements, the ignition charge (drawing 2434757) may be manufactured in small batches if the batches come from the sam
45、e manufacturer using the same lots of ingredients and are manufactured with no break in production for longer than 20 working days. 4.4.2 Primer inspection. Unless otherwise specified in the contract or purchase order (see 6.2), 105 samples shall be selected at random from each production lot for te
46、st and examination at the government facility designated in the contract or order in accordance with the quality conformance inspection plan of Table I. Conformance inspection shall be performed in accordance with Tables II through XXVII as specified Provided by IHSNot for ResaleNo reproduction or n
47、etworking permitted without license from IHS-,-,-MIL-DTL-18714F (OS) 7 herein. For all conformance inspections the same sample specimen may be used for all non-destructive examinations or tests. This sample is in addition to those primers required for contractor inspection and tests. 4.4.3 Part and
48、sub-component inspection. Unless otherwise specified in the contract or purchase order (see 6.2), or on tables II through XXVIII, quality conformance of parts and sub-components shall be determined in accordance with Tables II through XXVIII and MIL-STD-1916. Unless otherwise specified, characterist
49、ics identified as CRITICAL shall be inspected 100%. Unless otherwise specified, inspection level IV shall be used for all characteristics identified as MAJOR and inspection level II for characteristics identified as MINOR. 4.5 Classification of characteristics. The characteristics verified by the tests and examination herein are classified as critical, major, or minor in accordance with DOD-