NAVY MIL-F-50694-1970 FIRING MECHANISM CARTRIDGE ACTUATED 29378-1 REMANUFACTURED METAL PARTS ASSEMBLY《29378-1型由金属零件改造组装的火控发射系统》.pdf

上传人:testyield361 文档编号:979174 上传时间:2019-03-13 格式:PDF 页数:8 大小:277.97KB
下载 相关 举报
NAVY MIL-F-50694-1970 FIRING MECHANISM CARTRIDGE ACTUATED 29378-1 REMANUFACTURED METAL PARTS ASSEMBLY《29378-1型由金属零件改造组装的火控发射系统》.pdf_第1页
第1页 / 共8页
NAVY MIL-F-50694-1970 FIRING MECHANISM CARTRIDGE ACTUATED 29378-1 REMANUFACTURED METAL PARTS ASSEMBLY《29378-1型由金属零件改造组装的火控发射系统》.pdf_第2页
第2页 / 共8页
NAVY MIL-F-50694-1970 FIRING MECHANISM CARTRIDGE ACTUATED 29378-1 REMANUFACTURED METAL PARTS ASSEMBLY《29378-1型由金属零件改造组装的火控发射系统》.pdf_第3页
第3页 / 共8页
NAVY MIL-F-50694-1970 FIRING MECHANISM CARTRIDGE ACTUATED 29378-1 REMANUFACTURED METAL PARTS ASSEMBLY《29378-1型由金属零件改造组装的火控发射系统》.pdf_第4页
第4页 / 共8页
NAVY MIL-F-50694-1970 FIRING MECHANISM CARTRIDGE ACTUATED 29378-1 REMANUFACTURED METAL PARTS ASSEMBLY《29378-1型由金属零件改造组装的火控发射系统》.pdf_第5页
第5页 / 共8页
点击查看更多>>
资源描述

1、MIL-F-50b74 13 H 777770b OLI26705 3 MIL-F- 50694( MU) 18 November 1970 MILITARY SPECIFICATION FIRING MECHANISM, CARTRIDGE ACTUATED, 29378-1 REDWLII?ACTm METAL PARTS ASSEMBLY 1. SCOPE - 1.1 This specification covers Firing Mechanisms P/N 29378-1. The assembly will be ultimately loaded and used to act

2、uate the canopy counter- balance jettison and cinch-down cylinder assembly in the TF102 Aircraft. 2. APPLICABLE DOCUMENTS 2.1 The following documents ofthe issue in effect on date of invitation for bids or request for proposal form a part of this specification to the extent specified herein. SPECIFI

3、CATION Military MIL-A-2550 - Amnunition and Special Weapons, General Specification for S- Military MIL-STD-I05 MIL-STD-109 MIL-STD-413 - Sampling Procedures and Tables for Inspection - Quality Assurance Terms and Definitions - Visual Inspection Guide for Rubber O-Rings by Attributes DRAWINGS Munitio

4、ns Coimiend L. Cg224217 Cg224720 IEL29378-1 - Container, Anmunition, Fiber for Firing - Box, Packing, Amnunition, for Firing - Inspection Equipment List for Firing Mechanism Assembly, P/N 29378-1 Mechanism Assembly, P/N 29378-1 Mechanism, Cartritige Actuated, 29378-1 Assembly - ._- y eeg Industries

5、Code Ident. No. 12116) 29378-1 - Fira Mechanism, Cartridge Actuated, Assembly FSC 1377 1. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_I_ MIL-F-50674 13 m 7777706 0426706 5 m 1L-F-50694( MU) (Copies of specifications , standards connection with

6、specific procurement procuring activity or as directed by and drawings required by suppliers in functions should be obtained from the the contracting officer,) 2.2 Other publications - The following document forms a part of this specification to the extent specified herein. the issue in effect on da

7、te of invitation for bid or request for proposal shall apply: Unless otherwise indicated, ASA 46.1 - Surface Texture (Application for copies should be addressed to the American Standards Association, 10 East 40th Street, New York, N.Y. 10016). 3. REQUIREMENTS 3.1 General - Materials, parts and assem

8、blies shall comply with.the requirements specified on the applicable drawings, referenced specifications and the following: 3.2. Material - The contractor shall be responsible for selecting from the classification list contained in the raw material intended for use in manufacture. 3.3 Mechanical pro

9、perties - Mechanical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for ali steel parts shall be achieved by quenching and tempering. 3.4 Metal parts assembly - Parts shall be combined to produce an assembly which conforms to the req

10、uirements of the metal parts assembly drawing and the - following: 3.4.1 The remanufactured Firing Mechanism metal parts assembly contain new parts in accordance with Table I: shall TAHLE I Pin, Shear O-Ring Set Screw P TAEE III Total Allowable Defects Per Sample Size Sample Sizes for Major Defects

11、Number of Defects in Class 2 - 3. 4- 7 8 - i9 20 - 43 Over 43 Sample Sizes for Major Defects Number of Defects in Class 2- 3 4- 7 8 - 16 17 - 48 Over 48 - 110 - 150 - 225 1 2 3 4 5 8 2 3 4 5 6 8 11 ; i50 . 225 - - 110 - 2 3 4 3 4 5 4 5 8 6 a 11 8 11 17 - 300 4 5 7 10 i4 5 7 10 i4 20 4 Provided by IH

12、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-50694 13 M 7997906 0426709 O W -. MIL-F -5C694( M ) 4.2.2.3 Head, Drawing 29308-1 covering a detail of Drawing 29378-1 Detail CRITICAL Method of Inspection None defined MAJOR 101 . 102. 103 . . . 104. 105. i06

13、 107. . 108. log u0 . 1ll. 112. Pitch diameter of large thread Major diameter of large thread Pitch diameter of small thread Major diameter of small thread Pitch diameter of set screw thread Major diameter of set screw thread Shear pin hole Metal defect ive Protective finish inadequate or defective

14、 Surface finish improper Burr Foreign matter Gage Gage Gage Gage Gage Gage Gage Visual Visual visual Visual Visual MINOR None defined 4.2.2.4 Chamber, Drawing 29309-0 covering a detail of Drawing 29378-1 CRITICAL None defined MAJOR 101. . 102. 103 . 104. i05 106. 107. , 108. W. 110. Pitch diameter o

15、f large thread Minor diameter of large thread Pitch diameter of small thread Minor diameter of small thread Thread damaged Metal defective Protective finish inadequate or Surf ace finish improper BW Foreign matter Gage Gage Gage Gage Visual Visual defect ive Visual visual visual ViSuaJ MINOR None de

16、fined 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-50694 33 m 7799906 0426730 7 m m-F-50694( MU) 4.2.2.5 Container, Ammunition, Fiber, Drawing Cg224217 Defect 1 CRITICAL None defined MAJOR None defined MINOR 201. 202. 203. 204, 205. 206. 2

17、08. 207 Gap between body and cover, max. Contents loose Metal ends loose or distorted Cut or damaged through all impregnated layers Marking, missing, incorrect or illegible Tape incomplete or badly wrinkled Length of tear tab, min. Color of tape incorrect Method of Inspection Manual Manual Manual Vi

18、 sua1 Visual Visual Visual Visual 4.2.2.6 Box, Packing, Amunition, Drawing C9224720 CRITICAL None defihed MAJOR None defined MINOR 201. Contents loose Manual 202. 203. Hardware missing, loose, broken or improperly engaged Manual and Visual Strapping missing, loose, broken or improperly as sembled Ma

19、nual and Visual 4.2.3 Inspection - The following tests shall be performed in accordance with 4.3. 4.2.3.1 Protective finish, replated components - The number of specimens and acceptance criteria for protective finish shall be in accordance with the applicable military standard for the type of protec

20、tive finish utilized in the rebuild process. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-j. . MIL-F -50694( MU) 4.2.3.2 Residualmagnetism - Each assembly shall be subjected to the test for excessive residual magnetism. Failure of any assembly t

21、o comply with the requirements of 3.6 shall be cause for rejection of the assembly. 4.2.4 Inspection equipment - The examination and tests shall be made using equipment approved by the Government. 4.3 Test methods and procedures 4.3.1 Protective finish, replated cmponents - Test procedures for pro-

22、tective finish shall be in accordance with the applicable military standards for the type of protective finish utilized in the rebuild process; 4.3.2 Residual magn etism - The assembly shall be tested for excessive . residual mgnetism, in an area free of local magnetic effects, by placing the assemb

23、ly six inches frm and at the same height as the compass in a north-south horizontal position (head end at south) with the compass set in an east-west heading. in a longitudinal direction for its entire length, rotated 90 degrees in the horiSonta1 position .about its longitudinal axis and moved slowl

24、y past the compass. firihg mechanism. The assembly shall be moved slowly past the compass This procedure sha.llbe repeated for each 90 degree rotation of the 5. PREPARATION FOR DELIVERY 5.1 Packing and marking - Level A - Packing and marking shall be in accordance with drawings Cg224217 and C9224720

25、 6. NOTES .- 6.1 Ordering data - Procurement documents should specify the title, number, and date of this specification. 6.2 A “mechanical failure“ is defined as any deformation or breakage of a part, the occurrence of which is other than a design function. 6.3 Remanufactured exterior components ar

26、e listed in Tabe IV: TABLE IV Name of Part Past Number Head Chamber 293084 29309-0 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-50679 13 W 777770b 0926732 O B m-F-50694( MU) 6.4 When remanufacturing and loading of assembly is performed in

27、an integrated plant, the metal. parts assembly requirement may be waived and the residual magnetism requirement performsd on the loaded assembly only, Custodian: Preparing activity: Army - MU - (FA) Project No. 1377-Ak13 *U.S. GOVERNMENT PRINTING OF FICE: 1970- 433-89313074 a Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN 18128-2002 Soil - Investigation and testing - Determination of ignition loss《土壤 调查和检测 灼烧损失测定》.pdf DIN 18128-2002 Soil - Investigation and testing - Determination of ignition loss《土壤 调查和检测 灼烧损失测定》.pdf
  • DIN 18129-2011 Soil investigation and testing - Determination of lime content《土壤 调查和试验 石灰含量的测定》.pdf DIN 18129-2011 Soil investigation and testing - Determination of lime content《土壤 调查和试验 石灰含量的测定》.pdf
  • DIN 18130-1-1998 Soil - investigation and testing Determination of the coefficient of water permeability - Part 1 Laboratory tests《土壤 研究和测试 透水性系数的测定 第1部分 实验室试验》.pdf DIN 18130-1-1998 Soil - investigation and testing Determination of the coefficient of water permeability - Part 1 Laboratory tests《土壤 研究和测试 透水性系数的测定 第1部分 实验室试验》.pdf
  • DIN 18130-2-2015 Soil investigation and testing - Determination of the coefficient of water permeability - Part 2 Field tests《土壤勘察和试验 水渗透系数的测定 第2部分 现场试验》.pdf DIN 18130-2-2015 Soil investigation and testing - Determination of the coefficient of water permeability - Part 2 Field tests《土壤勘察和试验 水渗透系数的测定 第2部分 现场试验》.pdf
  • DIN 18132-2012 Soil testing procedures and testing equipment - Determination of water absorption《土壤、检验程序和检验仪器 吸水能力测定》.pdf DIN 18132-2012 Soil testing procedures and testing equipment - Determination of water absorption《土壤、检验程序和检验仪器 吸水能力测定》.pdf
  • DIN 18134-2012 Soil - Testing procedures and testing equipment - Plate load test《土壤 试验程序和试验设备 板极负载试验》.pdf DIN 18134-2012 Soil - Testing procedures and testing equipment - Plate load test《土壤 试验程序和试验设备 板极负载试验》.pdf
  • DIN 18135-2012 Soil - Investigation and testing - Oedometer consolidation test《土壤 调查和试验 膨胀剂固结试验》.pdf DIN 18135-2012 Soil - Investigation and testing - Oedometer consolidation test《土壤 调查和试验 膨胀剂固结试验》.pdf
  • DIN 18137-1-2010 Soil investigation and testing - Determination of shear strenght - Part 1 Concepts and general testing conditions《土壤试样的研究和测试 剪力强度的测定 第1部分 概念和一般检验条件》.pdf DIN 18137-1-2010 Soil investigation and testing - Determination of shear strenght - Part 1 Concepts and general testing conditions《土壤试样的研究和测试 剪力强度的测定 第1部分 概念和一般检验条件》.pdf
  • DIN 18137-3-2002 Soil investigation and testing - Determination of shear strength - Part 3 Direct shear test《土壤、勘察和试验 剪切强度的测定 第3部分 直接剪切试验》.pdf DIN 18137-3-2002 Soil investigation and testing - Determination of shear strength - Part 3 Direct shear test《土壤、勘察和试验 剪切强度的测定 第3部分 直接剪切试验》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1