1、I 5 3 i cation MIGG-82455(OS) dated 10 hlay 191 Specifi- m. 3. Wherever it appears in speciPication delete “Bureau of Naval Weapons“ and substitute “Naval Sea System Comnand;l! also delete ilNAVORII and substitute “NAVSEA. PAGE 1 *Add to bottan of page: Beneficial cmnts (recomnendations, additions,
2、deletions) and any pertinent data which may be of use in improving this document slmuld be addressed to: Naval Ordnance Station; Attn: Standard- ization Division (611), Indian Head, MD 20640 by using the self- addressed Standardization Document Improvement Proposal (DD Forni 1426) appearing at the e
3、nd of this document or by letter. PAGE 4 3.2.2.1 Delete and substitute: . l3.2.2.1 IiLu-igus proof material, Materi;& that- are nutrienbs for fungi shall not be used.“ PAC33 5 3.3.1.1 Delete and substitute: . f13.3.1.1 Extraction. After the sey is extracted, the generator shall function following a
4、delay of 1.0 - 0.2 seconds.“ L 3.3.2, line 4: Delete Ilthe shaded area o1 figure 1“ and substitute Ilthe shaded area of Figure 1 on Dwg 2301891,11 FSC 1350 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-9 * a- b * MIL-G-2455 (2) 13 H 9799906 04338L
5、3 9 PAGE: 8 e * 4.1 Delete and substitute: “4.1 Responsibility, for inspection, Unless otherwise specified in the contract, the contractor is responsible for the performance OP all inspection requirements as specified herein, specified in the contract, the contractor may use his own or any other fac
6、ilities suitable for the performance of the inspection riquiremnts specified herein, unless disapproved by the Government, reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescr
7、ibed requirements.11 Except as otherwise . The Goverriment PAGE 10 * TABU IV: Replace TABM IV with new TBU3 IV, attached. PAGE 12 4.4.2.3, line 5: Delete (see figure l)I1 and substitute “(see Figure 2).tt PAGE 18 6.2 (f) Delete specified in 3*3.1tt and substitute Itspecified in 3.2.1.“ PAGE 23 Delet
8、e Figure 1 in its entirety. * where changes (additions, modifications, corrections, deletions) from the previous issue were made. This was done as a convenience only and the Govemnt assumes no liability whatsoever for any inaccuracies in these notations. requirements of this document based on the en
9、tire content irrespective OP the marginal notations and relationship to the last previous issue. The margins of this amendment are marked with an asterisk to indicate Bidders and contractors are cautioned to evaluate the i Preparing Activity : Project No. 1350-NO35 NAVY - Os Page 2 of 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i i t x w x w w x x x x x x x x x w x n !-I m ri N e 4 w I W 3 6 O - MIL-G-82455 (OS) AMENDMENT 2 Page 3 of 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-