NAVY MIL-H-60648-1967 HOLDER STRIP LOADED ASSEMBLY MB M9 M10 XM12 M19 OR XM25 AIRCRAFT EJECTION SEAT CATAPULT《用于MB M9 M10 XM12 M19 或 XM25飞机弹射座椅的条状固定架载荷装置》.pdf

上传人:fatcommittee260 文档编号:979509 上传时间:2019-03-13 格式:PDF 页数:9 大小:364.01KB
下载 相关 举报
NAVY MIL-H-60648-1967 HOLDER STRIP LOADED ASSEMBLY MB M9 M10 XM12 M19 OR XM25 AIRCRAFT EJECTION SEAT CATAPULT《用于MB M9 M10 XM12 M19 或 XM25飞机弹射座椅的条状固定架载荷装置》.pdf_第1页
第1页 / 共9页
NAVY MIL-H-60648-1967 HOLDER STRIP LOADED ASSEMBLY MB M9 M10 XM12 M19 OR XM25 AIRCRAFT EJECTION SEAT CATAPULT《用于MB M9 M10 XM12 M19 或 XM25飞机弹射座椅的条状固定架载荷装置》.pdf_第2页
第2页 / 共9页
NAVY MIL-H-60648-1967 HOLDER STRIP LOADED ASSEMBLY MB M9 M10 XM12 M19 OR XM25 AIRCRAFT EJECTION SEAT CATAPULT《用于MB M9 M10 XM12 M19 或 XM25飞机弹射座椅的条状固定架载荷装置》.pdf_第3页
第3页 / 共9页
NAVY MIL-H-60648-1967 HOLDER STRIP LOADED ASSEMBLY MB M9 M10 XM12 M19 OR XM25 AIRCRAFT EJECTION SEAT CATAPULT《用于MB M9 M10 XM12 M19 或 XM25飞机弹射座椅的条状固定架载荷装置》.pdf_第4页
第4页 / 共9页
NAVY MIL-H-60648-1967 HOLDER STRIP LOADED ASSEMBLY MB M9 M10 XM12 M19 OR XM25 AIRCRAFT EJECTION SEAT CATAPULT《用于MB M9 M10 XM12 M19 或 XM25飞机弹射座椅的条状固定架载荷装置》.pdf_第5页
第5页 / 共9页
点击查看更多>>
资源描述

1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-H-60b 13 9777706 0340425 5 W Munitions Command - Carton, Packing, Ammbaikisn for Lmded Strip Holder Assembly MIO OF W5 - Box, Packing, AmunStion for Loaded Strip Holder AssemblJr, El10 car XI425 - C

2、arton, Packing, Armnition for Loaded Strip Holder Assembly, hlg - Box, Packing, Iurmunltion for Loaded Strip Holder Assembly, I - arton, Packing, flm3Uni“biQ.n for Loaded Strip Holder Assembly, M8, XM12 or Mlg - Box, Packing, Amaininitbn for Loaded Strip Holder Assembly, M8, B43.2, 02 Mlg - Holder,

3、Strip, Assenibu, Loaded - Holder, Strip, Loaded ssembly - Holder, StrtD, Loaded Assembly (Copies of a.ecifbceat50ns, staiidards, ion, ings and $pecifl,cations, at a Govsrnraent, laboratory or such other facility specified in the contrack. 4.2.1.2 Initial Producttom FeiPtme.- Failme of the sample to

4、meet the requirements of the drawings and specifications shall result in sample disapproval. 4.3 inspection Provisions o 4.3.1 - Lot. 4.3.1.1 Submission of Product.- The product shall be submitted in accordance Witt, MIL-STD-O e 4.3.1.2 Size of Lot.- For the purpose of identification and shipment, t

5、he shinnine lots of loaded strip holder assemblies shall consist of 1200 assemblies, maximum, exclusive of test samples, provlded the homogeneity of the inspection lots has been retained as follows: a. Components produced by a homogeneous process. Provided by IHSNot for ResaleNo reproduction or netw

6、orking permitted without license from IHS-,-,-MIL-H-O (MU) b. Propellant from not more than one lot. c. Inhibitant from not mre than one lot. A smaller lot may be shipped upon approval of the contracting officer. 4 3.2 Examination. - One hundred percent exanination shall be performed for all critica

7、l defects. performed on a defect basis in accordance with the classification of defects, using the sampling plans and criteria in Tables II and III. For an indivi- dual defect (single characteristic), the criteria in Table II shall be used. For total defects within a major or minor group, the criter

8、ia in Table III shail be used. All nonconforming material shall be rejected. magnification may be used in performing visual examination for such defects as burr and foreign matter. MIL-STD-639 shall be used as a basis of comparison for surface roughness deter- minat ion. Examination for major or min

9、or defects shall be Four power (4X) The Ordnance Standard Finish Blocks prescribed in TABI.- Twenty-one loade strip holder assemblies of the initial production sample and each production 10% shall be temperature con- ditioned as specified in Table IV and in 4.4.1.1.1, and then tested in accord- ance

10、 with 4.4.1.1 to deterde conpliance w=ith 3.2. tes% group to eompPy With the requirements of 3.2 shall be cause for rejection of the lot. Failure of any one of a O Temperature ( F) -65 to -70 65 to 75 i60 to 165 Sample Sizes Initial Production Production Lot 7 7 7 7 7 7 4.4 Test Metho-ds -and Proced

11、ures 4.4.1 Functional 4.4.1.1 Ballistics.- The sample shall be installed in an appropriate catapult or simulated equal, supported, and the test weight shall be attached to the mounting lugs of the launcher and allowed to move freely, The sample shall be ballastically tested within 10 minutes after r

12、emssral from the conationing chamber. When this time limit is exceeded, %he sample unit shall be reconditioned at the original tem- perature. The head of the catapult shall be statically 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIEH-60648 (M

13、U) 4 .&. Ll. 1 Temperature Condittoning e - A standard M8, Mg, MlO , XM12, Ml9 or xEi25 Catapult, loaded with a dummy holder strip assembly and containing a tenperature sensitive element, shall be placed in the conditioning chamber at the same time as the samples, The condittoning time shall be a mi

14、n* of one hour longer tbm the tirne necessary ta bring the element contained in the dummy holder strip to the required temperature. 5-1 -nil Marking.- Paeking and marking shall be in accordance th the requirements of he applicable rawings, 5.2 Data Carit,- Data card information shall be in acoordanc

15、e dth MIbSTD- LE67 6. NOTES 6,i “Acceleration The“ is defined a3 the area under ke acceleration- the recor bounded by the “launch time“ limi%s. 6.2 “Rate of Cniange of Acceleration“ fs defined as the maximum positive slope of the acceleration-time record measwed over any 30 dllseconds between the co

16、ntinuous rise and the maximum acceleration on the acceleration-time record. 6.3 “Launch Time“ is defined as the time between the beghiri4 of the con- 6.4 “Ignition Belay“ is defined as the time %hat elapses betweer, the firing tinuous rise and the sudden drop on the acceleration-tbe record. of the c

17、atapulk primary igniter (or %he primary igni-ber in an appmved test vehicle) and the beginning of he continuous rgse on the acceleration-time record, Custodian: Preparing activity: Army - EILT Army - M Pmjct No. ij77-086 *F.S. GOVBRNMWT PlUNRIiO OFFICE L967-251-518/5622 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 1117-2002 en Heat exchangers Liquid-cooled refrigerant condensers Test procedures for establishing the performance (Incorporates Amendment A1 2002)《热交换器 液体冷却致冷剂冷凝器 确定性能的试验程序 包含修.pdf EN 1117-2002 en Heat exchangers Liquid-cooled refrigerant condensers Test procedures for establishing the performance (Incorporates Amendment A1 2002)《热交换器 液体冷却致冷剂冷凝器 确定性能的试验程序 包含修.pdf
  • EN 1118-1998 en Heat exchangers Refrigerant cooled liquid coolers Test procedures for establishing the performance (Incorporates Amendment A1 2002)《热交换器 制冷剂冷却液体制冷器 性能稳定性的试验程序 包含修改件.pdf EN 1118-1998 en Heat exchangers Refrigerant cooled liquid coolers Test procedures for establishing the performance (Incorporates Amendment A1 2002)《热交换器 制冷剂冷却液体制冷器 性能稳定性的试验程序 包含修改件.pdf
  • EN 1119-2009 en Plastics piping systems - Joints for glass-reinforced thermosetting plastics (GRP) pipes and fittings - Test methods for leaktightness and resistance to damage of n.pdf EN 1119-2009 en Plastics piping systems - Joints for glass-reinforced thermosetting plastics (GRP) pipes and fittings - Test methods for leaktightness and resistance to damage of n.pdf
  • EN 1120-1996 en Plastics Piping Systems - Glass-Reinforced Thermosetting Plastics (GRP) Pipes and Fittings - Determination of the Resistance to Chemical Attack from the Inside of a.pdf EN 1120-1996 en Plastics Piping Systems - Glass-Reinforced Thermosetting Plastics (GRP) Pipes and Fittings - Determination of the Resistance to Chemical Attack from the Inside of a.pdf
  • EN 1121-2000 en Doors - Behaviour between Two Different Climates - Test Method《门 在两种不同气候间的状态的试验方法 代替EN 79-1985》.pdf EN 1121-2000 en Doors - Behaviour between Two Different Climates - Test Method《门 在两种不同气候间的状态的试验方法 代替EN 79-1985》.pdf
  • EN 1122-2001 en Plastics - Determination of Cadmium - Wet Decomposition Method《塑料 镉的测定 湿分解法 代替ENV 1122-1995》.pdf EN 1122-2001 en Plastics - Determination of Cadmium - Wet Decomposition Method《塑料 镉的测定 湿分解法 代替ENV 1122-1995》.pdf
  • EN 1123-1-1999 en Pipes and fittings of longitudinally welded hot-dip galvanized steel pipes with spigot and socket for waste water systems Part 1 Requirements testing quality cont.pdf EN 1123-1-1999 en Pipes and fittings of longitudinally welded hot-dip galvanized steel pipes with spigot and socket for waste water systems Part 1 Requirements testing quality cont.pdf
  • EN 1123-2-2006 en Pipes and fittings of longitudinally welded hot-dip galvanized steel tube with spigot and socket for waste water systems - Part 2 Dimensions《废水系统用带龙头和插接套管的纵向焊接热浸镀.pdf EN 1123-2-2006 en Pipes and fittings of longitudinally welded hot-dip galvanized steel tube with spigot and socket for waste water systems - Part 2 Dimensions《废水系统用带龙头和插接套管的纵向焊接热浸镀.pdf
  • EN 1123-3-2004 en Pipes and fittings of longitudinally welded hot-dip galvanized steel pipes with spigot and socket for waste water systems - Part 3 Dimensions and special requirem.pdf EN 1123-3-2004 en Pipes and fittings of longitudinally welded hot-dip galvanized steel pipes with spigot and socket for waste water systems - Part 3 Dimensions and special requirem.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1