NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf

上传人:twoload295 文档编号:980050 上传时间:2019-03-12 格式:PDF 页数:12 大小:563.06KB
下载 相关 举报
NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf_第1页
第1页 / 共12页
NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf_第2页
第2页 / 共12页
NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf_第3页
第3页 / 共12页
NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf_第4页
第4页 / 共12页
NAVY MIL-I-85365 A-1982 IGNITER MARK 296 MODS (LOADED ASSEMBLY)《MARK 296 MODS点火器(装卸组件)》.pdf_第5页
第5页 / 共12页
点击查看更多>>
资源描述

1、NIL-I-85365A 13 7799706 036q570 W ML-1-8 5 365A(AS) 5 August 1982 SUPERSEDING 9 February 1981 MIL-1-853 65(AS) MILITARY SPECIFICATION Igniter Mark 296 Mods (Loaded Assembly) This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is avaihble for use by al

2、l Departments and Agencies of the Department of Defense. 1. SCOPE. 1.1 Scope. This specfication establishes the manufacturing and testing requirements for the procurement of Igniter Mark 296 Mods (Loaded Assembly), hereafter called the igniter. 2. APPLICABLE DOCUMENTS. 2.1 Government documents. 2.1.

3、1 Specifications, standards, and handbooks. Unless otherwise specified, the following specifications, standards, and handbooks of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation form a part of this specification

4、 to the extent specified herein. SPECIFICATIONS Military MIL-E5272 STANDARDS Military Environmental Testing, Aeronautical and Associated Equipment, General Specification for MIL-STD-105 Sampling Procedures and Tables for Inspections by Attributes Beneficial comments (recommendations, additions, dele

5、tions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Air Engineering Center, Engineering Specifications and Standards Department (ESSD) Code 93, Lakehurst, NJ 08733, by using the self-addressed Standardized Document hprove- me

6、nt Proposal (DD Form 1426) appearing at the end of this document or by letter. .=- / FSC 1340 THIS DOCUMENT CONTAINS l2 PAGES. Licensed by Information Handling ServicesMIL-I-85365A 13 W 7777906 0364571 T W MIL-1-8 5 3 65 (AS) MILSTD-129 Marking for Shipment and Storage MIL-STD-33 1 Fuze and Fuze Com

7、ponents, Environmental and Performance Tests for MIL-STD-4 14 Sampling Procedures and Table for Inspection by Variables for Percent Defective Environmental Test Methods MIL-STD-8 1 O 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and

8、 publications form a part of this specification to the extent specified herein. DRAWINGS Naval Air Systems Command (Code Ident 30003) 1255AS114 1255AS133 1255AS14 1 DL 1255AS114 Mark 296 Mod O Igniter, Explosive, Loaded Assembly Shipping Container, Mark 296 Mod O, Igniter Mark 296 Mods, Test Chamber

9、 Assembly Igniter, Mark 296 Mod O, Loaded Assembly PUB LICATIONS Naval Sea Systems Command OR 10 OR 11 Documentation Requirements for Packaging, Packing, Shipping, and Handling of Weapon System Components Development of Packaging, Handling, Storage, and Transportation Systems for Weapons (Copies of

10、specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functionsshould be obtained from the contracting activity or as directed by the contracting officer.) 2.2 Other publications. The following document(s) form a part of th

11、is specification to the extent specified herein. The issues of the documents which are indicated as DoD adopted shall be the issue listed in the current DoDISS and the supplement thereto, if applicable. I Licensed by Information Handling ServicesNIL-I-853bSA 13 9999906 0364592 1 W O“ F Min I Max MIL

12、-1-8 53 65 (AS) +li Min 1 1 Pellet peak pressure (chamber pda) Time to pellet peak chamber pressure (ms) Code of Federal Regulations 95 210 100 15 50 15 49 CFR 100-177 Transportation (Copies are available from the Superintendent of Documents, Government Printing Office, Washington, D.C. 20402. Order

13、s for the above publications should cite latest issue and supplements thereto.) 3. REQUIREMENTS. 3.1 Conformance with drawings. Unless otherwise specified in the contract, the igniter shall meet all the requirements specified herein and on the applicable drawings listed on DL 1255AS114. 3.2 First ar

14、ticle. When specified in the contract (see 6.2), the contractor shall furnish sample unit(s) for first article inspection and approval (see 4.4 and 6.4). 3.3 Circuit resistance. The igniter circuit resistance between the ends of the lead wires shall be between 0.40 and 0.60 ohms (see 4.6.2). 3.4 Per

15、formance requirements. The performance requirements of the igniter shall be as specified in Table I (see 4.6.1 O). TABLE I. Performance requirements. I Requirement l- 14- initiator peak pressure da) F MaX 65 220 50 3.5 Environmental requirements. 3.5.1 Impact. The igniter shall withstand the 40-foot

16、 drop test without igniting (see 4.6.3). 3.5.2 Two-foot-drop. The igniter shall withstand the 2-foot drop test without spilling any explosive material and without igniting (see 4.6.4). 3 Licensed by Information Handling ServicesMIL-I-85365A 13 I 7977906 0364573 3 I MIL-1-8 5 3 65 (AS) 3.5.3 Temperat

17、ure and humidity. The igniter shall withstand the temperature and humidity test (see 4.6.5). 3.5.4 Vibration. The igniter shall withstand the simulated shipboard vibration test (see 4.6.6). 3.5.5 Acceleration. The igniter shall withstand the 15 g load and acceleration test (see 4:6.7). 3.5.6 High te

18、mperature test. The igniter shall not ignite when subjected to a tempera- ture of 350“ F for 120 minutes minimum (see 4.6.8). 3.5.7 Salt Spray. The igniter shall withstand the salt spray test without corrosion or damage (see 4.6.9). 3.5.8 Transportation shock, storage, and handling. The igniters, wh

19、en packed in accordance with Section 5 , shall not rupture so as to spill the package contents or break the seals on unit packages (see 4.6.1 1). 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is respons

20、ible for the performance of all inspection require- ments as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein unless disapproved by th

21、e Government. The Government reserves the right to perform any of the inspections set forth in the specifi- cation where such inspections are deemed necessary to assure that supplies and services conform to prescribed requirements. 4.2 Classifcation of inspections. The inspection requirements specif

22、ied herein are classified as follows : a. First article inspection (see 4.4). b. Quality conformance inspection (see 4.5). 4.3 Inspection conditions. Unless otherwise specified in the contract (see 6.2. i), all inspections shall be performed in accordance with the test conditions specified herein. 4

23、.4 First article inspection. First article inspection shall be performed by the con- tractor, after award of contract and prior to production, at a location acceptable to the Government. First article inspection shall be performed on sample units which have been produced with equipment and procedure

24、s normally used in production. First article approval is valid only on the contract under which it is granted, unless extended by the Government to other contracts. 4 Licensed by Information Handling ServicesMIL-I-85365A 13 777770b 0364574 5 I Examination Rea uirement MIL-1-8 5 3 65(AS) Test 4.4.1 S

25、ample size, Thirty-two igniters shall be subjected to first article inspection. 4.4.2 Inspection routine. The sample shall be subjected to all the inspections and tests of 4.6 in accordance with the testing schedule of figure 1. 4.4.3 Failure. Failure of any igniter in the sample to meet the above r

26、equirements shall be cause for refusal to grant first article approval. 4.5 Quality conformance inspection. Quality conformance inspection shall consist of all the examinations and tests as noted in Table II. The minimum production inspection to be performed shall be in accordance with MIL-STD-105 a

27、nd shall consist of all the requirements including the classification of defects listed on the applicable drawings. Acceptance shall be in accordance with 4.8. TABLE II. Quality conformance inspection. Visual examinafion Circuit resistance Performance test 3.1 3.3 3.4 4.7.1 4.7.2 4.1.3 4.5.1 Inspect

28、ion lot. An inspection lot shall consist of igniters manufactured from one batch of main charge pellets and one lot of initiators. 4.5.2 Sampling. 4.5.2.1 Circuit resistance sampling. All igniters in a lot shall be tested for con- formance to the circuit resistance requirements (see 3.3). 4.5.2.2 Se

29、rformance requirements sampling. Sampling of loaded assembly igniters for conformance to the performance requirements 3.4 for each temperature shall be in accordance with MIL-STD414, Table A2, Inspection Level III. Inspection Level II shall only be used after 3 consecutive accepted lots have been ma

30、nufactured. If a lot fails, Level III once again shall be in effect. 4.6 First article tests. 4.6.1 Visual examination. The igniters shall be examined for conformance to 3.1. Licensed by Information Handling ServicesVIL-I-85365A 13 9777706 03611575 7 MIL-1-8 5 3 65 (AS) 4.6.2 Circuit resistance. The

31、 igniter circuit shall be checked for circuit resistance in accordance with the requirements of 3.3. Not more than 0.005 ampere shall be applied to the igniter circuit during the test. 4.6.3 Impact test. Two igniters shall be subjected to a 40-foot drop test in accordance with MIGSTD-33 1. Igniters

32、shall not fire during the test and shall be safe to handle and dispose after the test. Igniters do not have to be usable after the test. 4.6.4 Two-foot drop test. Three igniters shall be subjected to a 2-foot drop test along . the longitudinal axis, nose down, at ambient temperature. Acceptance shal

33、l be in accord- ance with 4.6.10. 4.6.5 Temperature and humidity. Five igniters shall be subjected to the temperature and humidimgrs-shallbe subjected to alternate temperature conditions of O“ F and +140“ F; time at each temperature will be a minimum of 18 hours with a 5 minute maximum transfer time

34、. Three full cycles will be required. A full cycle is defined as O“ to t140“ to O“ F with relative humidity (RH) equal to 95 percent. After completing the test, two of the igniters shall be test fired at O“ F and two at +140“ F in accordance with the testing schedule of Figure 1. Acceptance shall be

35、 in accordance with 4.6.10. 4.6.6 Vibration. Five igniters shall be vibrated along the longitudinal and transverse axes. Igniters shall be mounted in a test vehicle which simulates the mounting of the igniter in the Rocket Motor Mark 23 Mods. Test procedures and time schedules shall be in accor- dan

36、ce with MIL-STD-8 10, figure 5 14-6, curve AA, beginning at 5Hz. After the test, two of the igniters shall be test fired at O“ F and two at +140“ F in accordance with the testing schedule of Figure 1. Acceptance shall be in accordance with 4.6.1 O. 4.6.7 Acceleration. Five igniters shall be mounted

37、simulating the actual mounting of the Rocket Motor Mark 23 Mods and subjected to 15 f 2 g acceleration load. The test shall be repeated 10 times. The g load shall be reached in 7 f 1 milliseconds and the accel- eration shall exceed 8 g for a minimum of 11 milliseconds. The igniters shall be in such

38、a position that the load acts along the longitudinal axis of the igniters. After the load and acceleration test, two of the igniters shall be test fired at O“ F and two at +140“ F in accord- ance with the schedule of Figure 1. Acceptance shall be in accordance with 4.6.10. 4.6.8 High temperature tes

39、t. Four igniters, in accordance with testing schedule of Figure 1 , shall be subjected to high temperature test. The igniter shall be enclosed in a test chamber, the temperature of which shall be 350“ f 20“ F. After the igniter has been subjected to this temperature for the specified minimum time of

40、 2 hours, it shall be test fired in accordance with the testing schedule of Figure 1. 4.6.9 Salt spray test. Four igniters shall be loaded into a simulated Rocket Motor Mark 23 and subjected to the salt spray test in accordance with MIL-E-5272. After com- pleting the test, two of the igniters shall

41、be test fired at O“ F, and two at +140“ F in accord- ance with the testing schedule of Figure 1. Acceptance of igniters shall be in accordance with 4.6.10. 6 Licensed by Information Handling ServicesMIL-1-85365A 13 = 7777906 0364576 7 L 4 +140 F 4OoF i 2 IMPACT 40 FOOT DROP MIL-1-8 5 3 6 5 A(AS) 5 4

42、 T&H 4 VIBRATION 5 I X-RAY I f 1 140 F f 1 OF 1140 F I I I lOF 3 2 2 FOOT DROP II FIGURE 1. Testing schedule for first article sample. 7 - Licensed by Information Handling ServicesMIL-I-5365A 13 I 7777706 0364577 O I MIL-1-8 53 65 (AS) 4.6.1 O First article performance test. Fifteen igniters shall b

43、e test fired at O“ F and fifteen at +140“ F in accordance with the testing schedule of Figure 1. The requirements of 3.4 shall be evaluated at each temperature in accordance with Table B-3 of MIL-STD-414 using an AQL of 0.65 percent. 4.6.1 1 Transportation, shock, storage, and handling, Three ignite

44、r packs, prepared as specified in Section 5, shall be subjected to the appropriate rough handling tests specified inOR 10orOR 11. 4.7 Quality conformance tests. 4.7.1 Visual examination test. The igniters shall be examined for conformance to 3.1. - 4.7.2 Circuit resistance test. After the completion

45、 of the igniter assembly, the igniter circuit shall be checked for circuit resistance in accordance with the requirements of 3.3. Not more than 0.005 ampere shall be applied to the igniter circuit during the test. 4.7.3 Performance test. 4.7.3.1 Test equipment required. The following test equipment

46、shall be used for performance tests: a. Test chamber shall be in accordance with Drawing 1255AS 14 1. Condition the test chamber to 70“ f 35“ F before firing the igniter. b. Reluctance type pressure pickups with 8-inch maximum length, 1/4-inch inside diameter air filled line for connection to test c

47、hamber. c. Recording oscillograph, Type 5-1 14, Consolidated Engineering Corporation, Pasadena, California, or equal. d. Necessary couplings. e. Twenty-eight volt d.c. power supply. 4.7.3.2 Temperature conditioning. The igniters selected in 4.5 -2.2 shall be condi- tioned to the applicable temperatu

48、re for a minimum of 6 hours. Igniters shall be fired with- in 5 minutes after removal from the conditioning unit, If they are not fired within this time, they shall be returned for reconditioning for an additional 6 hours. 4.7.3.3 Power supply. Igniters shall be fired using a 28-volt power supply an

49、d current of 13 +_ 2 amperes as delivered to the igniter circuit. 8 Licensed by Information Handling ServicesMIL-I-85365A 13 W 9797906 0364598 2 W - MIL-1-8 53 65 (AS) 4.7.3.4 Recorded data. A pressure time curve shall be reduced from the oscillograph records, and a permanent record made of the parameters specified ments shall be made at, or referred to, the instant the electrical fig circuit is closed. Ambient prefiring pressure shall be the reference datum for all pressure measurements. 3.4. Ail time measure- 4.8. Acceptance criteria. The failure

展开阅读全文
相关资源
猜你喜欢
  • BS EN 16247-4-2014 Energy audits Transport《能源审计 运输》.pdf BS EN 16247-4-2014 Energy audits Transport《能源审计 运输》.pdf
  • BS EN 16247-5-2015 Energy audits Competence of energy auditors《能源审计 能源审计师的能力》.pdf BS EN 16247-5-2015 Energy audits Competence of energy auditors《能源审计 能源审计师的能力》.pdf
  • BS EN 16249-2013 Tanks for the transport of dangerous goods Service equipment Cap for the adaptor for bottom loading and unloading《危险货物运输油罐 服务设备 底荷和非荷载用接合器盖》.pdf BS EN 16249-2013 Tanks for the transport of dangerous goods Service equipment Cap for the adaptor for bottom loading and unloading《危险货物运输油罐 服务设备 底荷和非荷载用接合器盖》.pdf
  • BS EN 16252-2012 Machines for compacting waste materials or recyclable fractions Horizontal baling presses Safety requirements《压缩废物材料或可回收部分用机器 卧式打捆包装机 安全性要求》.pdf BS EN 16252-2012 Machines for compacting waste materials or recyclable fractions Horizontal baling presses Safety requirements《压缩废物材料或可回收部分用机器 卧式打捆包装机 安全性要求》.pdf
  • BS EN 16253-2013 Air quality Atmospheric measurements near ground with active Differential Optical Absorption Spectroscopy (DOAS) Ambient air and diffuse emission measurements《空气质量.pdf BS EN 16253-2013 Air quality Atmospheric measurements near ground with active Differential Optical Absorption Spectroscopy (DOAS) Ambient air and diffuse emission measurements《空气质量.pdf
  • BS EN 16254-2013 Adhesives Emulsion polymerized isocyanate (EPI) for load-bearing timber structures Classification and performance requirements《粘合剂 承载木结构用乳剂聚合异氰酸盐(EPI) 分类和性能要求》.pdf BS EN 16254-2013 Adhesives Emulsion polymerized isocyanate (EPI) for load-bearing timber structures Classification and performance requirements《粘合剂 承载木结构用乳剂聚合异氰酸盐(EPI) 分类和性能要求》.pdf
  • BS EN 16256-1-2012 Pyrotechnic articles Theatrical pyrotechnic articles Terminology《烟火制品 戏剧烟火制品 术语学》.pdf BS EN 16256-1-2012 Pyrotechnic articles Theatrical pyrotechnic articles Terminology《烟火制品 戏剧烟火制品 术语学》.pdf
  • BS EN 16256-2-2012 Pyrotechnic articles Theatrical pyrotechnic articles Categories of theatrical pyrotechnic articles《烟火制品 戏剧烟火制品 戏剧烟火制品的类别》.pdf BS EN 16256-2-2012 Pyrotechnic articles Theatrical pyrotechnic articles Categories of theatrical pyrotechnic articles《烟火制品 戏剧烟火制品 戏剧烟火制品的类别》.pdf
  • BS EN 16256-3-2012 Pyrotechnic articles Theatrical pyrotechnic articles Requirements for construction and performance《烟火制品 剧场烟火制品 安装和性能要求》.pdf BS EN 16256-3-2012 Pyrotechnic articles Theatrical pyrotechnic articles Requirements for construction and performance《烟火制品 剧场烟火制品 安装和性能要求》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1