NAVY MIL-L-19701 B (1)-2002 LUBRICANT ALL-WEATHER SEMI-FLUID FOR AIRCRAFT ORDNANCE METRIC《公制飞机兵器用半液体全天候润滑剂》.pdf

上传人:cleanass300 文档编号:980135 上传时间:2019-03-12 格式:PDF 页数:2 大小:13.60KB
下载 相关 举报
NAVY MIL-L-19701 B (1)-2002 LUBRICANT ALL-WEATHER SEMI-FLUID FOR AIRCRAFT ORDNANCE METRIC《公制飞机兵器用半液体全天候润滑剂》.pdf_第1页
第1页 / 共2页
NAVY MIL-L-19701 B (1)-2002 LUBRICANT ALL-WEATHER SEMI-FLUID FOR AIRCRAFT ORDNANCE METRIC《公制飞机兵器用半液体全天候润滑剂》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、METRICMIL-L-19701BAMENDMENT 131 JULY 2002MILITARY SPECIFICATIONLUBRICANT, ALL-WEATHER, SEMI-FLUID,FOR AIRCRAFT ORDNANCE, METRICThis amendment forms a part of Military Specification MIL-L-19701B, dated 8November 1983, and is approved for use by all Departments and Agencies of the Department ofDefense

2、.PAGE 33.1: Delete and substitute; “First article. When specified (see 6.2), a sample shall besubjected to first article inspection in accordance with 4.1.”Delete: “QUALITY ASSURANCE PROVISIONS” and substitute “4. VERIFICATION.”Delete: “4.1 Responsibility for inspection.” and substitute “4.1 Classif

3、ication ofinspections. The inspection requirements specified herein are classified as follows:a. First article inspection (see 4.3)b. Conformance inspection (see 4.4).”Delete: “4.2 Classification of inspection.” and substitute “4.2 Inspection conditions.Unless otherwise specified, all inspections sh

4、all be performed in accordance with the testconditions specified in 4.3 and 4.4 of this specification.”Delete: “4.3 Qualification inspection.” and substitute “4.3 First article inspection. Thefirst article inspection shall consist of all inspections and tests as specified in 4.4, 4.5, and 4.6.”Delet

5、e: “4.3.1 Qualification inspection sample.”AMSC/NA 1 of 2 FSC 9150DISTRIBUTION STATEMENT A: Approved for public release, distribution is unlimited.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-19701BAMENDMENT 1PAGE 4Delete: “4.3.2 Test report

6、s.”Delete: “4.3.3 Retention of qualification.”4.4 Delete: Word “Quality” from the paragraph title and first sentence.PAGE 86.2.1: Add “f. Test Reports (see 3.1),” andAdd “g. First article inspection (see 3.1).”Delete: “6.3 Qualification.”PAGE 9Delete: “6.3.1 Qualification information.”Custodians: Preparing Activity:Army AT Navy ASNavy ASAir Force 68 (Project 9150-1278)Review Activities:Army MIAir Force 11, 99DLA GS, PS2 of 2 .Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1