NAVY MIL-L-81979-1974 LAUNCHERS ROCKET LAU-10C A AND LAU-10D A《LAU-10C A及 LAU-10D A火箭发射器》.pdf

上传人:李朗 文档编号:980223 上传时间:2019-03-12 格式:PDF 页数:16 大小:702.08KB
下载 相关 举报
NAVY MIL-L-81979-1974 LAUNCHERS ROCKET LAU-10C A AND LAU-10D A《LAU-10C A及 LAU-10D A火箭发射器》.pdf_第1页
第1页 / 共16页
NAVY MIL-L-81979-1974 LAUNCHERS ROCKET LAU-10C A AND LAU-10D A《LAU-10C A及 LAU-10D A火箭发射器》.pdf_第2页
第2页 / 共16页
NAVY MIL-L-81979-1974 LAUNCHERS ROCKET LAU-10C A AND LAU-10D A《LAU-10C A及 LAU-10D A火箭发射器》.pdf_第3页
第3页 / 共16页
NAVY MIL-L-81979-1974 LAUNCHERS ROCKET LAU-10C A AND LAU-10D A《LAU-10C A及 LAU-10D A火箭发射器》.pdf_第4页
第4页 / 共16页
NAVY MIL-L-81979-1974 LAUNCHERS ROCKET LAU-10C A AND LAU-10D A《LAU-10C A及 LAU-10D A火箭发射器》.pdf_第5页
第5页 / 共16页
点击查看更多>>
资源描述

1、 . - -. t MIL-L-81979 LO m 9999906 03b0262 .- 4 = 15 August 1974 MIUTAFIY SPECIFICATION LAUNCHERS, mm LAU-lOC/A AND LAU-lOD/A This specification has been appryed by the Naval Air Systems Command, Department of the Navy. G 1. SCOPE. 1.1 Scope. Ihis specification covers two dual purpose airborne ex-

2、 ternal. store rocket launchers capable of shipping and storing four 5.O- inch ZUNI Rocket btors, md launching four 5.0-inch ZUNI rockets. 2. APPLICABLE Dom. 2.1 ?he following documents of the issue in effect on the date of invitation for bids or request for proposal, form a part of the specifi- cat

3、ion to the extent specified herein, SPECIFTCATTONS Military MILC-SO15 Connector, Electric, AN Type. MIL-1-8500 MIGN-1830 7 MIGP-19834 Interchangeability and Replaceabil- ity of Component Parts for Aircraft and Missiles. . Nomenclature and Identification for Electronic, Aeronautical, and Aero- nautic

4、al Support Equipment, hclud- ing Ground Support Equipment, Plates, identification, Met; and other docwnents listed on DL 490204b for IAU-lOC/A and DL 4902292 for LAU-lOD/A. 3.3 Materials and pmcessses . 3.3.1 Materiais. All mterials used in the construction of the laun- cher shall be in accordance w

5、ith MIGSTD-454, Requirement 3, Flammable %teriais; Requiremnt 4, Rmgm-Inert Phteriais; Requirement 16, Dis- Srnlar i. I T._. i. .:Lmited, Resonance bell Eliminated. Excitation time shall be equally divided between temperature of - 40 f 2 degrees centigrade (OC) (- 40 r4 degrees Fahrenheit (OF) an am

6、bient (23 f 10C or 73 f 18OF). puts levels shall be 0.65 gravity unit (g) peak amplitude Born 5 to Excitation in- 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-81977 LO 9797906 03b0272 7 W MILL 81979 (AS) e- 27 Hertz (Hz) and 0.018-inch do

7、uble amplitude from 27 to 52 Hz. tim from 5 to 26 to 5 Hz shall be i5 minutes logarithically. The launcher shall nieet the requirements of 3.5.4.2 (see Note 4.6.1.2). Sweep 4.6.1.2 Palletized mm handling. Subject four inertly loaded launchers (one pallet load) to a total of six impacts in different

8、loca- tions from a height of 18 inches in accordance Ath MILSTD-O, In the transverse and verticalaxes, excitation input shall be O ,015 g2/ Hz power spectral density flat from 200 to 2,000 Hz with 3 decibels in each octave (dEVoctave) rolloff from 10 to 200 Hz. In the longitudinal axis, excitation i

9、nput shail be 0.010 g2/Hz power spectral density flat from 200 to 2,000 Hz with a 3 dB/octave rolloff from 10 to 200 Hz. 4.6.1.4.2 Helicopter. The launcher shall have sinusoidal excitation applied at 25-minute frequency dwells as follows: Vertical Transverse Longitudinal Hz axis axis axis - PA - Hz

10、 PA L *PA - 1.8 g 11 0.7 g 11 1.0 g 11 0.9 g 22 0.6 g 22 0.6 g 22 0.6 g 44 +r Peak amplitude Apply ?minute frequency sweeps covering the frequency range of 5 to 500 to 5 Hz in 5 minutes along each of three mutually perpendicular axes with the launcher first filly loaded with four inert ail-up round

11、s, then with the launcher empty. Total test time for this portion of the test shall be 10 minutes per axis. Excitation inputs shall be as follows : Vertical axis: O .40-inch double amplitude from 5 to 10 Hz, 2 g peak amplitude from 10 to 500 Hz. Transverse axis: 0.40-inch double amplitude from 5 to

12、7 Hz, 10 g peak amplitude from 7 to 18 Hz, 0.06-inch double amplitude fim 18 to 26 Hz, and 2 g peak ampli- tude from 26 to 500 Hz. Longitudinal axis: 0.40-inch double amplitude from 5 to 7 Hz, 1.0 g peak amplitude from 7 to 33 Hz, 0.018- inch double amplitude from 33 to 48 Hz, and 2 g peak amplitude

13、 from 48 to 500 Hz. 12 t Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-1777 LO 77777Ob 03k027q O MILL- 81979 (AS) 4.6.2 Leakage. The empty launcher, with shock pans installed, shall be temperature conditioned at ambient temperature (23 5 10C

14、or 73 f 180) for 24 hours. Evacuate the launcher to a vacuum of 7 f 0.5 inches of mrcury, and continue to store the launcher at the conditioning temp- erature for a period of 8 hours. of 3.5.4.1. ?he launcher shall meet th requirements 4.6.3 Humidity in salt-laden atmosphere. %e empty launcher, shoc

15、k pans, thermal shields, and fairings removed, shall be subjected to ten l2-hour cycles of humtdity with salt-laden atmsphere. ning the first test cycle, precondition the chamber at 21 f l0C (70 ). (c) 7,200 rf: 30 pounds forward. (d) 7,200 f 30 pounds remard. The test shall be in two pasts as follo

16、ws: (e) Down load and side load, right to left;, combined with forward load. (f) Down load and side load, left to right, cambined with rear- ward load. Repeat above test using 30-inch suspension. the requirements of 3.5.5.1. . 4.6.4.2 Fairings. Ihe fairing;, installed on a auncheror a simu- lated la

17、uncher end, shall be subjected to static loads simulating aero- ?he launchr shall meet dynamic loads as follows: (a) Axial (externally applied): 1,390 pounds total load applied in such a rranner that the peak load force is at the tip of the cone and gradually diniinishes to zero at the base, with eq

18、ual forces applied overthe periphery of the cone. (b) Side (externally applied): Side load of 437 pounds total load equally distributed from the tip of the cone to the base shall be applied in a mer that also distributes the load over approximately one-half of the circumference. The fairings shall m

19、et the requirements of 3.5.5.2. 4.7 rational tests. 4.7.1 Ground riring. ?he launcher with fairings shall be loaded with four all-up rockets consisting of live MK 71 PDD 1 mtors, and inert warheads and fuzes. The launcher shall be fired from a suit- able ground firing mount. All four rounds shall be

20、 fired in the single fire mde. fired in the ripple fire mode. ments of 3.5.6.1. The launcher shall then be reloaded and four rounds Ihe launcher shall rrieet the require- I. i4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-1777 10 W 7777906 0

21、360276 4 W 4.7.2 Aircraft firing. ?he launcher with fairings shall be loaded with four all-up rockets consisting of live MK 7i MOD 1 motors, and inert warheads and fuzes. The launcher shall be attached to the normal carry stations on a military jet attack or fighter aircraft (6.2(d) and fired using

22、simulated ccpnbat flight profiles. All four rounds shall be fired in single fire de. The launcher shall be reloaded and fired in the ripple fire de. The launchers shall meet the requirements of 3.5.6.2. 4.7.3 Fast cookoff. ?he LAU-lOD/A launcher, loaded with four live all-up rockets consisting of MK

23、 71 MOD 1 mtor, MK 63 warhead, and MK 93 me, and with thermally protected front fairing and with rear thermal shield, shall be subjected to the condLtions of MIbSTbi648. 4.7.4 Reliability demonstration. The data from testing performed in Table I shall be used to demonstrate the reliability requireme

24、nt of 3.4.3. 4.8 Test plan and test reports. 4.8.1 Test plan. Unless otherwise specified in the contract or pur- chase order, a detailed test plan shall be provided to the procuring activity prior to testing and delivery of the preproduction sample. test reports in accordance with msb83i shall be av

25、ailable at the contractors plant to the procuring activity. contract or purchase order, copies shall be delivered to the procuring activity. 4.9 Preparation for delivery. Prior to shipment, the launcher shall be inspected to ensure that preservation, packaging, packing, and mark- ing for shipmnt.are

26、 in accordance with the requirements of Section 5. 4.8.2 Test report. When specified in the contract or purchase order, When required by the 5. PFEPAFWITON FR DELEEFE. 5.1 Palletizing. ?he complete launcher shall be palletized for delivery in accordance with procuring activity instructions on Gaverm

27、ent-furnished pallets. procuring activity. 5.2 mm-g and labeling. 5.2.1 Pallets. Marking and labeling shall be in accordance with Delivery shall be as directed by the MIZ-SD-129. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- i I i- -. MIL-L-II977

28、II0 = 9999906 0360277 6 MILL 81979 (AS) 6. NOTES. 6.1 Intended use. These launchers are intended for shipping and storing four 5.0-inch ZUNI rocket mtors, and for launching four 5.0- inch ZUNI rockets. 6,2 Ordering data. Procurement documents should specify the fo1lmir-g: Etle, number, and date of t

29、his specification. Preproduction sample testing activity (see 3.1 and 4.3). Certification of confomce (see 4.5.2) . Designated activity or activities and aircraft for firing tests (see 4.7). Test reports, requir-nt for and distribution of (see 4.8.2). Any preparation for delivery requimnt other than

30、 Section 5. A quality program in accordance with ASPR 14-101.4, &ter coordination in accordance with ASPR 14-101,5(a)i(D). Project No. 1055-NO55 I . . A-+-.&-& -. I _-=- .CI U. S. GOVEANMENT PRINTIM OFFICG 1974 -603-122/526 16 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 12305-1997 en Biotechnology - Modified Organisms for Application in the Environment - Guidance for the Sampling Strategies for Deliberate Releases of Genetically Modified Plants.pdf EN 12305-1997 en Biotechnology - Modified Organisms for Application in the Environment - Guidance for the Sampling Strategies for Deliberate Releases of Genetically Modified Plants.pdf
  • EN 12306-1997 en Biotechnology - Guidance for Quality Control of Diagnostic Kits Used in Agriculture Plant and Animal Pest and Disease Control and Environmental Contamination《生物技术 .pdf EN 12306-1997 en Biotechnology - Guidance for Quality Control of Diagnostic Kits Used in Agriculture Plant and Animal Pest and Disease Control and Environmental Contamination《生物技术 .pdf
  • EN 12307-1997 en Biotechnology - Large-Scale Process and Production - Guidance for Good Practice Procedures Training and Control for Personnel《生物技术 规模加工和生产 良好习惯 程序 人员培训和管理指南》.pdf EN 12307-1997 en Biotechnology - Large-Scale Process and Production - Guidance for Good Practice Procedures Training and Control for Personnel《生物技术 规模加工和生产 良好习惯 程序 人员培训和管理指南》.pdf
  • EN 12308-1998 en Installations and Equipment for LNG - Suitability Testing of Gaskets Designed for Flanged Joints Used on LNG Piping《液化天然装置和设备 液化天然气管道中所用的法兰接头垫圈设计适配性试验》.pdf EN 12308-1998 en Installations and Equipment for LNG - Suitability Testing of Gaskets Designed for Flanged Joints Used on LNG Piping《液化天然装置和设备 液化天然气管道中所用的法兰接头垫圈设计适配性试验》.pdf
  • EN 12309-1-2014 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 1 Terms and definitions《用于加热和 或冷却的气体的吸附装置使用净热输入不超过70千瓦 .pdf EN 12309-1-2014 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 1 Terms and definitions《用于加热和 或冷却的气体的吸附装置使用净热输入不超过70千瓦 .pdf
  • EN 12309-2-2015 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 2 Safety《燃气吸附设备加热和 或冷却的净热量输入不超过70千瓦 第2部分 安全性》.pdf EN 12309-2-2015 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 2 Safety《燃气吸附设备加热和 或冷却的净热量输入不超过70千瓦 第2部分 安全性》.pdf
  • EN 12309-3-2014 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 3 Test conditions《用于加热和 或冷却的气体的吸附装置使用净热输入不超过70千瓦 第3部分 测.pdf EN 12309-3-2014 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 3 Test conditions《用于加热和 或冷却的气体的吸附装置使用净热输入不超过70千瓦 第3部分 测.pdf
  • EN 12309-4-2014 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 4 Test methods《用于加热和 或冷却的气体的吸附装置使用净热输入不超过70千瓦 第4部分 测试方法.pdf EN 12309-4-2014 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 4 Test methods《用于加热和 或冷却的气体的吸附装置使用净热输入不超过70千瓦 第4部分 测试方法.pdf
  • EN 12309-5-2014 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 5 Requirements《用于加热和 或冷却的气体的吸附装置使用净热输入不超过70千瓦 第5部分 必备要求.pdf EN 12309-5-2014 en Gas-fired sorption appliances for heating and or cooling with a net heat input not exceeding 70 kW - Part 5 Requirements《用于加热和 或冷却的气体的吸附装置使用净热输入不超过70千瓦 第5部分 必备要求.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1