1、MIL-M-16125C AMENDMENT 4 6 January 1987 SUPERSEDING MIL-M-16125C INT. AMENDMENT 3 (SH) 20 October 1978 MILITARY SPECIFICATION METERS, ELECTRICAL, FREQUENCY This amendment forms a part of MIL-M-l6125C, dated 21 February 1963, and is approved for use by all Departments and Agencies of the Depart- ment
2、 of Defense. PAGE 1 At bottom of page: Add the following statement: * “ Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, Naval Sea Systems Comman,SEA 5523, Department of the Navy, Wash
3、ington, DC 20362-5101 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. I. 1.2.1.2.2.2, line 5: Delete “8“ and substitute “3“. PACE 2 2.1: Military Specification MIL-E-15090, delete “11“ and substitute “111“.
4、* 3.1: Delete and substitute: “3.1 First article. When specified in the contract or purchase order, a sample shall be subjected to first article inspection (see 4.3 and 6.3): PAGE 3 3.5.1.2.1, line 3: Delete “11“ andsubstitute “111.“ AMSC NIA FSC 6625 DISTRIBUTION STATEMENT A Approved for public rel
5、ease; distribution unlimited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-16125C . AMENDMENT 4 PAGE 6 3.21: Delete and substitute: “3.21 Shock (high-impact). When high-impact-shock resistant meters are tested in accordance with 4.3.16, no sc
6、rews, bearings, pivots, windows, or other parts shall become loosened, cracked (except as specified herein), or unduly damaged. Minor cracking or distortion of pivots will be permissible only when conformance to the post shock performance has been demonstrated. Cracking of glass windows will be perm
7、issible orily when readability of plete scale is retained and no fragment has becomedislodged. The permanent change in indi- cation based on calibration made afEer resetting the pointer to zero or -null position (if applicable) shall not ex.ceed the value specified (see 324).“ PAGE 7 3.24.1, figure:
8、 Delete dimension “1.250 $. .375“ and substitute “0.625 I f 0.125*“ ._ PAG Id - 4.1: Delete and substitute: 3r “4.1 Responsibility for inspectio3 Unless otherwise specified in the contract or purchase order, the contraktor is responsible for the performance f all inspection requirements as specified
9、 herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the
10、 inspections set forth in the specification where such _. . inspections are deemed necessary to BSSUK supplies and services prescribed requirements.“ * 4.1.1: Add as new paragraph: “4. 1. 1 Responsibility for compliance. All items must meet of sections 3 and 5. . The inspection set.-forth in this sp
11、ecificat conform to all requirements ion shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements iii the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to
12、 the Government for acceptance comply with all requirements of the contract. Sampling in quality conformance does not authorize submission of known defective material, either indicated o actual, nor does it commit the Government to acceptance of.defective material.“ 2 Provided by IHSNot for ResaleNo
13、 reproduction or networking permitted without license from IHS-,-,-MIL-M-16125C AMENDMENT 4 * 4.2: Delete and substitute: “4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: (a) First article inspection (see 4.3). (b) Quality conformance inspec
14、tion (see 4.4).“ * 4.2.1.1, lines 1 and 2: Delete “qualification“ and substitute “first article.“ PAGE 11 4.3: Delete and substitute: * “4.3 First article tests. First drtlkle tests shall consist of tests specified herein.“ * 4.3.1, lines 2, 10, 11, 16 and table I: Delete “qualification“ and substi-
15、 tute “first article“. * 4.3.1.1, line 2 and tabac II: Delete “qualification“ and substitute “first article“, Footnote 1, at the bottom of the page: Delete in its entirety. PAGE 12 * 4.3.4.1, line 1: Delete “qualification“ and substitute “first article.“ PAGE 15 * 6.3: Delete and substitute: “6.3 Fi
16、rst article. When a first article inspection is required, the items should be a first article sample. The first article should consist of two or three units. The contracting officer should include specific instructions in acquisition documents regarding arranbments for examinations, approval of firs
17、t article test results and disposition.of first articles. Invitations for bids should provide that the Government reserves the right to waive the requirement for samples for first article inspection to those bidders offering a product which has been previously acquired or tested by the Government, a
18、nd.that bidders offering such products, who wish to rely.on such production or test, must furnish evidence with the bid that prior.Government approval is presently appropriate for the pending contract.“ PAGE 16 * 6.4: Delete in its entirety. Notice: Delete in its entirety. 3 Provided by IHSNot for R
19、esaleNo reproduction or networking permitted without license from IHS-,-,-_I_ . - MIL-M-Lb125C (L1) bb 9 997990b 0129235 2 m - 4 MIL-M-16125C AMENDMENT 4 r*. z NOTE: The margins of this amendment are marked with asterisks to indicate where -.changes (additions, modifications, corrections, deletions)
20、 from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evalunte the requirements of this document based on the entire content irrespective of the
21、marginal notations and relationship to the last previous amendment. - Custodians: Preparing activity: Army - CR Navy - SH Navy - SH (Project 6625-0686) Air Force - 99 Review activities: Army - MI Air Force .- 11 User activities: Army - ME Navy - MC 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-