1、MIL-M-2082C 66 7977906 OL2404L 3 HlLITARY SPECIFICATION HETERS, ).Low, ICWANfCAL, VOWIETRIC POSlTIVE DISPLACEMEhT, LIQUID, COLD WATER AND HOT WATER TYPE, NAVAL SHIPBOARD USE Thi8 spacificatlon ir approved for use by the Naval Se8 Systems Command, Department of the Navy, and is bvailable for use by a
2、ll Depnrtincrits brid Agencies of the Dapartment of Dofenaa. 1. SCOPE 1.1 Scopo. This specification covers fresh water mechoncnl f lowmeters (cold and hot water service) of the positive displacornent typo. 1.2 Clascification. Flowmeters shall be of the following classes, as specified (see 6.2.1): b
3、Class A - Volumetric flow measurement of cold fresh water up to 100 Class B - Volumetric flow measurement bf hot fresh water from 100 degrees Fahrenheit (OF). to 180F. B 2. APPLICABLE DOCUElEdTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise specified, the following s
4、pecifications and standards of the issue listed in that issue of 1iiiv Department of Defense Index of Specifications and Standards (DoDISS) specificci in the solicitation form a part of this Specification to the extent specified herein. CL 1 Beneficial comments (recommendations, additions, deletions
5、) and any pertinent i Commander, Naval Sea Systems Command, SEA 5523, Department of the Navy, Washington, DC 20362 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document r hv letter. i i data which may be of use in improving thi
6、s document should be addressed to: -_- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SPECIFICATIONS FEDERAL A-A- 1683 PPP-B-591 - Boxes, Shipping, Fiberboard, Wood-Cleated. PPP-B-621 - Boxes, Wood, Nailed and Lock-Corner. PPP-8-636 - Boxes, Shippin
7、g, .Fiberboard. - Tape, Pressure-Sensitive Adhesive (Packagireg, A Paper), PPP-B-601 -. Boxes, Wood, Cleated-Plywood. EIILITARY EI IL- P- 1 16 - Preservation, Elethods of. FIIL-L-10547 - Liners, Case, and Sheet, Overwrap; Water- Vnporproof or Waterproof, Flexible. STANDARDS FEDERAL . FED-STD-lt28 -
8、Screw-Thread Standards or Federal Services, ED-SID-l128/3 - Unifi8d Tlirr!nti Form niid Thread Series for Bolts, Scrcws, Nfits, Ihp)cd Holes, and General Appl icatioii. :II LITARY IiL-ST1)- i05 - !;amp1 ing Poccdiircs .ii*ts. Provided by IHSNot for ResaleNo reproduction or networking permitted witho
9、ut license from IHS-,-,-MIL-M-2082C bb 97979Ob 0124048 b = 3.9 Marking. 3.9.1 Identification marking. Flawmeters shall bear the manufacturers serial number permanently marked on the meter body and on the register box lid. Also, flowmeters shall bear the manufacturers .name, manufacturers model des-
10、ignation, normal flow range, and the designation “Class A“ or “Class BIt as applicable. Eleter markings shall be in accordance with MIL-STD-130. 3.9.2 Direction-of-flow indication, Flowmeters shall have the direction of flow indicated in raised chiracters on the flowmeter body. 3.10 Interchaiipenbil
11、ity. In n3 case shall parts be physically interchanga- abln or reversible unless such parts are also interchangeable or reversible witti rcgdrd to function, performance aiid strength. 3. 11 Technical iiiniiiiitigs uiid forgings shall havu no defects or scnio niid stiol iiot I)a msniiitchcd. Hcpiiir
12、procosscs, such ns wediiig, pcctiiii);, pigging, or filiiiig wiLIi cold solder or mciniiic poste, shall not ba nttcinptcd. 3. 12.2 Tri:nLitiv.isoliners shall be closed anti sealcd in nccoi*dtiiice with tho npp(!iidix to .liI,-L-10547. Cascliiiors for fibor boxos coiiformiiig to i111)-1-636 may ia oi
13、iiittod provided al 1 corners and cdge seams niid iiiIiiiiil(ir.tirurls joints :ii.c s(.iiled with iiiirimum l-1/2-inch wdo tapo confornirig to A-A- 1683, Uoxcs slicil 1 1)ci closuti aiid sLrappod in accordaiica with tho appl cnbla box spcci f icat loti oc tippoiidIx tlicrrctto. TI10 gross weight of
14、 woad or wood-clantad bosi!s slitill iiot uxcaod 200 pounds; fib(,! Imxo,s shall not cxcacd tho weight 1 imitntioiis of tho uppllcnblo box spccif icntioii. !iwl or wood-cloatod hxas uxceodiig 200 pouiids slicil 1 bo indriif itrd by tho ncidtioii II nominal 2 by 4 inch wood skids in accord:irico wth
15、III-U-6?1. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-il-EOZC bb W 7977706 012LiO52 W 5.2.2 Level B. Flowmeters, packaged as specified (see 6.2.1), shall be packed in snug-fitting, wood-cleated fiberboard, wood-cleated plywood, nailed wood,
16、or fiberboard boxes conforming to PPP-B-591 (class I), PPP-E-601 (domzstic type), PPP-B-621 (class i), or PP-B-636 (domestic class), respectively, at the box specification or appendix thereto. The gross weight of wood or wood-cleated boxes shall not exceed 200 pounds; fiber boxes shall not exceed th
17、e weight limitations of the applicable box specification. Wood or wood-cleated boxes ex- ceeding 200 pounds shall be modified by the addition of nominal 2 by 4 inch wood skids in accordance with PPP-B-621. option of the contractor. Box i c osures shall be as specified in the applicable 5.2.3 Level C
18、. Flowmeters shall be packed to ensure caf-rier acceptance and safe delivery to destination. Containers shall comply with the Uniform Freight Classification rules or other carrier regulations applicable to the mode of t raiispor tat ion. 5.3 Harking. In addition to any special marking required (see
19、6.2.1), interior packages and shipping containers shall be marked in accordance with MIL-STD-129. 6. NOTES 61 Intended use. The flowmeters covered by this specification are intended for operation in freshwater systems at temperatures up to 160F and for flow rates up to 1000 gallons per minute. 6.2 O
20、rdering da-. 62.1 Acquisition reqiiireineiitc. Acquisition documents should specify the f o 1 1 PK ng : Title, iiumber, aiid date of this spccification. Class niid size o florimeter (see 1.2 and tables II, III, and IV). Resettable couiitcr, when reqii i rcd (see 3. i). First article when required (s
21、ec 3.3)- When measuring cliaiiibcr is not to be iiiaiiufacturers standard Type of register, if otlicr than specified (see 3.6.5). Type of stroiiicr, if other than Specified (see 3.6.6). Type cnd connections, if other than specified (see 3.6.8). Working pressure , if other tiinn spccif ied (see 3 7,l
22、. 1 or 3 7.2. I Frost protection, when required (see 3.8). cchnical monunls, wlicn required (soc 3. il). cotmciit orid painting, if othor than spccificd (soo 3. 12.2). Lcvcls of prosnrvatioii, packagiiig, pocking, arid iiinrkliig (see 5. I, material (soc 3.6.3). 5.2, niid 5.3). 6.2.2 &ta rcqiiircmcn
23、ts. Vliuii this spccificutioii is iiscd iti nii ncquisiLio: which iiicorporatcs n DD Form 1423, Coiitrnct Untu Kuquircnieiits List (CURL) , tlii! dnto rc!cliilrcmciits idciitiflad bciow shnl 1 bo dcvclopnd ns spocifiod by tlti approved Doto Item Dcccrlpton (on Form 1664) and dclivcrod in occordnncc
24、with the npproiwcd CDKL incorporatcd into tlic contract:, ilici1 the provisions of FAR 52.227-7031 nro. invokcd niid the DD Forni !&?3 is iiot iised, the data spccificd Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-below shall be delivered by the c
25、ontractor in accordance with the contract or purchase order requirements. Deliverable data required by this specification- is cited in the following paragraphs. Papagraph no. Data requirement title Applicable DID no. Option 3.11 Manuals , ,technical, DI - Pl - 2044 Type I of standard basic issue MIL
26、-M-15071 (Data item descriptions related to this specification, and identified in section 6 will be approved and listed as such in DoD 5000.19L., Vol. II, ANSDL. Copies of data item descriptions required by the contractors in connection with specif4.c acquisition functions should be obtained from th
27、e Naval Publications and Forms Center or as directed by the contracting officer.) 6.2.2.1 The data requirements of 6.2.2 and any task in sections 3, 4 or 5 of this specification required to be performed to meet a data requirement may be waived by the contracting/acquisition activity upon certificati
28、on by the offeror that identical data were submitted by the offeror and accepted by the Government under a previous contract for identical item acquired to this specification. This does not apply to specific data which may be required for each contract regardless of whether an identical item lias be
29、en supplied previously (for example, test reports). 6.3 First atticle inspection. Invitations for bids should provide that the Government reserves the right to waive the requirement or samples for first article inspection as to those bidders offering a product which has been pre- viously acquired or
30、 tested by the Government, and that bidders offering such products, who. wish to rely on such production or test, must furnish evidence with the bid that prior Government approval is .presently appropriate for the pending contract. 6.4 Provisioning. Provisioning Tcchiiical Documentation (PTD), spare
31、 parts, and repair parts should be furnished as specified in the contract. 6.4.1 When ordering spare parts or repair parts for the equipment covered by this specification, the contract should state that such spare parts and repair parts should meet the same requirements and quality assurance provisi
32、ons as the parts used in the manufacture of t.lie equipment, Packaging for such parts should also be specified. 6.5 Definitions. 6.5.1 Approved standard commercial product, Thc iiianufactiirers approvcd standard commercial product is a product which has been or will.be sold on the commercial market
33、through advertisements or manufacturers catalogs or brocliiircs and represents the latest approved production models. hc principal contracting officer will review requirement 3.2 for compliance with the provision of part I1 of the Federal Acquisition Regulation. Provided by IHSNot for ResaleNo repro
34、duction or networking permitted without license from IHS-,-,-6.5.2 Registration. Registration is the ratio of he volume of water indicated on the register to the volume of water which actually passes through the flowmeter at a specified flow rate. t YI 6.6 Sub-contracted material and parts. The prep
35、aratica foz delivry requirements of re,fer.enced documents listed in section 2 do not apply when material and parts are acquired by the contractor for incorporation into the equipment and lose their separate identity when the equipment is shipped. 6.7 Changes from previous issue. Asterisks are not used in this revision to identify changes with respect t the previous issue, due to the.extensiveness of the changes. Preparing activity: Navy - SH (Project 6680-NZ04) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-