NAVY MIL-M-23346-1964 MOTOR FIRE CONNECTOR ASSEMBLY《火电机连接器组件》.pdf

上传人:outsidejudge265 文档编号:980331 上传时间:2019-03-12 格式:PDF 页数:8 大小:281.99KB
下载 相关 举报
NAVY MIL-M-23346-1964 MOTOR FIRE CONNECTOR ASSEMBLY《火电机连接器组件》.pdf_第1页
第1页 / 共8页
NAVY MIL-M-23346-1964 MOTOR FIRE CONNECTOR ASSEMBLY《火电机连接器组件》.pdf_第2页
第2页 / 共8页
NAVY MIL-M-23346-1964 MOTOR FIRE CONNECTOR ASSEMBLY《火电机连接器组件》.pdf_第3页
第3页 / 共8页
NAVY MIL-M-23346-1964 MOTOR FIRE CONNECTOR ASSEMBLY《火电机连接器组件》.pdf_第4页
第4页 / 共8页
NAVY MIL-M-23346-1964 MOTOR FIRE CONNECTOR ASSEMBLY《火电机连接器组件》.pdf_第5页
第5页 / 共8页
点击查看更多>>
资源描述

1、1. 1.1 Con 2. 2.1 - ct MI LITARY SPECIFICATION MOTOR FIRE CONNECTOR ASSEMBLY This speciticafion has been approved by the Bureau of Naval Weapons, Department of the Navy SCOPE This specification covers the requirements for Sparrow Motor Fire r Assembly, BuWeps LD No. 614000. APPLICABLE DOCUMENTS The

2、following documents of the issue in effect on date of invitation for bids or request for proposals, form a part of this specification. SPECIFICATIONS Mi litary MIL-C-5015 MIL-E-17555 STANDARDS Military MIL-STD-105 MIL-STD-129 Connectors, Electric “AN“ Type Electrical Equipment Preparation for Delive

3、ry of Sampling Procedures and Tables for Inspection by Attributes Marking for Shipment and Storage Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DRAWING Bureau of Naval Weapons, Department of the Navy LD 614000 Motor Fire Connector Assembly For Spa

4、rrow Rocket Motor) (When requesting any of the applicable documents, refer to both title and number. All requests should be made via the cognizant Government Inspector. Copies of this specification and other unclassified specifications and drawings required by contractors in connection with specific

5、 procurement functions should be obtained upon application to the Commanding Officer, Naval Supply Depot (Code 105), 5801 Tabor Avenue, Philadelphia 20, Pennsylvania. All other documents should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Ge

6、neral Requirements. -The Motor Fire Connector Assembly shall meet all the requirements of this specification and the requirements specified in the drawings, specifications and other documents listed in LD No. 614000. 3.1.1 Materials. -Materials shall conform to applicable specifications or items, au

7、thorization for a specific alternate shall be obtained from the I procuring activity. 3.1.3 Dimensions. -Unless otherwise specified, dimensions and tolerances are in inches, and apply to the end product after manufacture, thermal treatments, protective coatings, plating, and testing. I 3.1.4 Manufac

8、turina Processes. -Manufacturing processes used to produce ments of this specification and documents listed in LD No. 614000. Any process change after approval of the preproduction sample shall be reported to and be I approved by the procuring activity prior to incorporating the change into manufact

9、ure Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L-M-23346 (WEP) 3.2 Preproduction Sample, -Unless otherwise specified in the contract or order, manufacturer who has not produced the Motor Fire Connector Assembly drawing 2435661 previously, sha

10、ll submit a preproduction sample of teil Fire Connector Assemblies and ten each of the single contact plug connectors and ten each of double contact plug connectors used on the Connector and Cable Assembly drawing 2435669. Each connector shall be provided with a 5.0 f 0.5 inch lead of cable. The sam

11、ple and components shall have been manufactured using the methods and procedures to be used for the manufacture of production lots. The sample shall be inspected and tested in accordance with Section 4 of fhis specification for the purpose of determining that the manufacturer is capable of producing

12、 reliable units. 3.2.1 . Preproduction Sample Requirements. -The fire connectors and their components shall meet the requirements of 3.1 and subparagraphs thereof. 3.2.2 Electrical Requirements. -In addition to electrical requirements specified on the applicable drawings, the preproduction sample fi

13、re connectors and components shall meet the electrical requirements of the following sub- paragraphs. 3.2.2.1 withstand 1000 volts (AC, 60 cps) for 10 seconds minimum between the pin and plug in connector plug, drawing 2478021, and between the two pins in the dual pin plug of drawing 2435669. Dielec

14、tric Strength. -The fire connectors and Components shall 3.2.2.2 Surge Current. -The fire connectors and components shall with- stand 100 minimum applications of surge current of 20 volts DC at density of 23.0 f .O2 amperes. Each application shall have a duration of .5 seconds minimum. The time betw

15、een the current applications shall be 15 seconds max i mum. 3.2.3 Actuator Assembly. -After assembly of Motor Fire Connector Assembly in the Sparrow rocket motor, the Actuator Assembly drawing 2435662 arid connecting components shall move freely without binding. 3.2.4 Thermal Shock. -Each Connector

16、and Cable Assembly of the Motor Fire Connector Assemblies shall meet the drawing and specification requirements after being subiected to the Thermal Shock test specified in 4.4.a.l. P :_ : - I. - . r 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

17、shock test specified in 4.4.2.3. The potential drop at each contact of the mated connector shall be 12 millivolts maximum. The test current shall be 1 .O0 f .O5 amperes, DC. 3.2.7 has been interrupted for more than six months or if there have been maior changes which in the opinion of the procuring

18、agency may adversely affect the characteristics of the fire connector, an additional preproduction sample may be required. Renewal of Preproduction Sample. -In the event. that production I I 1 3.3 Workmanship. -All workmanship shal t meet the minimum quality standards necessary to assure that Motor

19、Fire Connector Assemblies conform to the requirements o this specification and the documents listed in LD No. 614000. The workmanship exhibited in the preproduction samples will be evaluated to determine product acceptability. Approved standards of workmanship will become minimum workmanship require

20、ments for all subsequent units offered by the contractor I for acceptance. (other than reports accompanying samples submitted tor quaiitication testing) or by applicable documents referenced in section 2 unless specified in the contract or order (see 6.2). A. QUALITY ASSURANCE PROVISIONS 4.1 mance o

21、f all inspection requirements prior to submission of product for Government inspection and acceptance. Unless otherwise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government. Inspection records of the examinations and tests shall be complete

22、 and be made available to the Government as specitied in the contract or order. The Government reserves the right to perform any inspection deemed necessary to assure conformance of supplies and services to prescribed requirements. Unless otherwise specified the supplier is responsible for the perfo

23、r- I Sampling. -Unless otherwise specified, and when applicable, the I sampling 42 plans and procedures used in determining acceptability of products shall Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-2334b 13 m 993790b 0303327 7 W I .-CAO b

24、e in accordance with the provisions set forth in MIL-STD-105. 4.3 Lots. -Lot definition. formation and size shall be in accordance with MIL-STD-105. - procuring activity for inspection and tests. Further production of the Motor Fire Connector Assembly, LD 614000, by the contractor prior to the compl

25、etion of the preproduction inspection and tests or to approval by the Bureau of Naval Weapons shall be at the manufacturers risk. Acceptable Motor Fire Connector preproduction units shall nof be counted as part of the quantity specified in the contract or order. I 4.4.2.1 Thermal Cwlinrr Test. -Fire

26、 Connector Assemblies drawina 2435661 with Method 102 Condition C of MIL-STD-202, except that the temperature range shall be -65F to 16O0F. receptacles provided by the procuring activity. Each plug and receptacle coupling shall be tested in accordance with test method 1 of MIL-C-5015. 4.4.2.3 Phvsic

27、al Shock Test. -Each olua and receotacle coiinlina shall be contact potential drop shall be a; specified in 3.2:7. 4.4.2.4 Electrical Tests. -All the fire connectors and comwnents shall be I done after the assemblies and parts havepassedthe tests of 4.4.2.1, 44.2.2, and I connector assembly shall me

28、et the requirements of 2435661. The test fixture shall Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-meet the dimensional requirements of 2435639 applicable to installation of I the fire connector assembly. Assembly, subassembly r part to meet any

29、requirement may result in rejection of the sample and disqualification of the contractor. Final acceptance of the I preproduction sample shall be made by the Chief of the Bureau of Naval Wepons . I 4.5 for meeting all the requirements as specified in 3.1. The Classification of Defects (CD) 2435661 s

30、hall be the minimum acceptable inspection to be performed. Assemblies shall be serialized and inspection data shall be traceable to a specific Production Inspection and Tests. -The contractor shal I be responsible I serial number (see 6.2). Provided by IHSNot for ResaleNo reproduction or networking

31、permitted without license from IHS-,-,-(b) Gross and net weights (c) Lot number and date of manutacture (d) The number of this specification (e) Safety precautions or unusual storage requirements (f) Purchase order or contract number 6. NOTES 6.1 procurement of the hrbtar Fire Connector Assembly whi

32、ch, when installed in the rocket motor provides electricul connection between the Sparrow rocket motor igniter and the missile launcher. 6.2 be limited to the following information: Intended Use. -This specification is intended to be used in Ordering Data. -Procurement documents shall specify but no

33、t (a) Title, number, and date of this specification (b) Type and site of container desired (c) Place of inspection (d) Minimum lot size, if applicable (e) Place of delivery (f) Requesi. for copies of inspection data, if source inspected (9) Selection of applicable levels of packing and packaging (se

34、e 5.1 and 5.2) (h) Marking requirements (see 5.3) (i) Sampling if it deviates from MIL-STD-105 (i) Applicable drawings and latest revisions (k) Data requirements: (1) Manufacturing process changes (see 31.4) (2) Production inspection and tests (see 4.5) ., .- d = 3. -% - 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 14037-2-2016 en 4000 Free hanging heating and cooling surfaces for water with a temperature below 120 C - Part 2 Pre-fabricated ceiling mounted radiant panels for space heat.pdf DIN EN 14037-2-2016 en 4000 Free hanging heating and cooling surfaces for water with a temperature below 120 C - Part 2 Pre-fabricated ceiling mounted radiant panels for space heat.pdf
  • DIN EN 14037-3-2016 en 2640 Free hanging heating and cooling surfaces for water with a temperature below 120 C - Part 3 Prefabricated ceiling mounted radiant panels for space heati.pdf DIN EN 14037-3-2016 en 2640 Free hanging heating and cooling surfaces for water with a temperature below 120 C - Part 3 Prefabricated ceiling mounted radiant panels for space heati.pdf
  • DIN EN 14037-4-2016 Free hanging heating and cooling surfaces for water with a temperature below 120 C - Part 4 Pre-fabricated ceiling mounted radiant panels - Test method for cool.pdf DIN EN 14037-4-2016 Free hanging heating and cooling surfaces for water with a temperature below 120 C - Part 4 Pre-fabricated ceiling mounted radiant panels - Test method for cool.pdf
  • DIN EN 14037-5-2016 Free hanging heating and cooling surfaces for water with a temperature below 120 C - Part 5 Open or closed heated ceiling surfaces - Test method for thermal out.pdf DIN EN 14037-5-2016 Free hanging heating and cooling surfaces for water with a temperature below 120 C - Part 5 Open or closed heated ceiling surfaces - Test method for thermal out.pdf
  • DIN EN 14038-1-2016 Electrochemical realkalization and chloride extraction treatments for reinforced concrete - Part 1 Realkalization German version EN 14038-1 2016《加筋混凝土的电化学复碱化和氯化.pdf DIN EN 14038-1-2016 Electrochemical realkalization and chloride extraction treatments for reinforced concrete - Part 1 Realkalization German version EN 14038-1 2016《加筋混凝土的电化学复碱化和氯化.pdf
  • DIN EN 14039-2005 Characterization of waste - Determination of hydrocarbon content in the range of C10 to C40 by gas chromatography German version EN 14039 2004《废弃物表征 用气相色谱法测定C10至C.pdf DIN EN 14039-2005 Characterization of waste - Determination of hydrocarbon content in the range of C10 to C40 by gas chromatography German version EN 14039 2004《废弃物表征 用气相色谱法测定C10至C.pdf
  • DIN EN 14043-2014 High rise aerial appliances for fire and rescue service use - Turntable ladders with combined movements - Safety and performance requirements and test methods Ger.pdf DIN EN 14043-2014 High rise aerial appliances for fire and rescue service use - Turntable ladders with combined movements - Safety and performance requirements and test methods Ger.pdf
  • DIN EN 14044-2014 High rise aerial appliances for fire and rescue service use - Turntable ladders with sequential movements - Safety and performance requirements and test methods G.pdf DIN EN 14044-2014 High rise aerial appliances for fire and rescue service use - Turntable ladders with sequential movements - Safety and performance requirements and test methods G.pdf
  • DIN EN 14045-2003 Packaging - Evaluation of the disintegration of packaging materials in practical oriented tests under defined composting conditions German version EN 14045 2003《包.pdf DIN EN 14045-2003 Packaging - Evaluation of the disintegration of packaging materials in practical oriented tests under defined composting conditions German version EN 14045 2003《包.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1