NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf

上传人:李朗 文档编号:980792 上传时间:2019-03-12 格式:PDF 页数:5 大小:167.96KB
下载 相关 举报
NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf_第1页
第1页 / 共5页
NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf_第2页
第2页 / 共5页
NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf_第3页
第3页 / 共5页
NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf_第4页
第4页 / 共5页
NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、. -* MIL-P-82442 (6) 13 W 7977706 0360887 O W MIL-P-82442( OS) AMENDMENT 6 19 April 1989 AMENDMENT 5 30 March 1979 SUPERSEDING MILITARY SPECIFICATION PUMP, SEA WATER This amendment forms a part of Military Speci fi cati on MIL-P-82442( OS) dated 10 May 1966. Wherever it appears in specification dele

2、te Bureau of Naval Weaponsn and substitute “Naval Sea Systems Command“; also, delete BuWepsn and substitute NAVSEA“ . PAGE 1 Paragraph 2.1, under SPECIFICATIONS: Delete *MIL-C-4343n and its title. * Paragraph 2.1, under STANDARDS: Delete “S-29561, Packing, Preformed, O, Ring, Synthetic Lubricant Res

3、istant. . Paragraph 2.1, under DRAWINGS: Delete “Pump Assemnly, Sea Watern and sub- stitute Pump Assembly, Sea Watern; delete Pakcing, Preformed“ and sub- stitute “Packing, Preformed“. At the bottom of page, add the following: Beneficial comments (recommendations, additions, deletions) and any perti

4、nent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Ordnance Station, Standardization/Documentation Division (Code 3730), Indian Head, MD 20640-5000n. PAGE 3 Paragraph 3.3.1. Delete and substitute: “.3.1 Pressure and flow requirements. The pump

5、shall deliver 8.3 gallons per minute (gpm) minimum during the initial test of 1-112 minutes duration, when operating at 3880 +10 revolutions per minute (rpm) and having an inlet pressure of 15 +2 pouns per square inch gage (psig) and outlet pressure adjusted to 265 ClO psig. The flow rate of the pum

6、p, when operated under the same conditions as above, must be at least 7.5 gpm during the first six duty cycles of the operational service life of the pump, and at least 6.8 gpm during the remaining four duty cyclesn, AMSC NIA Page 1 of 5 FSC 1355 DISTRIBUTION STATEMENT A. 1 imi ted. Approved for pub

7、lic release; distribution is un- J_ - L_-C - - - - 7 _1 - -_ - - - _ Licensed by Information Handling Servicesa. MIL-P-82442 (6) 13 777770b 03bO 2 MIL-P-82442(OS) AMENDMENT 6 PAGE 5 Paragraph 4.1. Delete and substitute: H44.1 Responsibflity for inspection. Unless otherwise specified in the contract,

8、 the contractor is responsible for the performance of all inspec- tion requirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disappro

9、ved by the Government. The Government reserves the right to perform any of the inspection set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements“ PAGE 9 Paragraph 4.4.4.1. Delete and substitute: “4.4.4.1 Operation

10、al test. Install the pump in the pump test stand and connect it to the appropriate fittings in accordance with Figures 1 and 2. With the drive unit operating the pump at 3880 +10 rpm and with an inlet pressure of 15 +2 psig, the output pressure sharl be adjusted to 265 510 psig. The flow-rate shall

11、be at least 7.5 gpm during the first six duty cycles of the operational service life, and at least 6.8 gpm during the remaining four duty cycles. The pump shall operate for one complete duty cycle of 7 minutes on salt water. Post-test servicing and maintenance shall be performed in accordance with 4

12、.5.7n. PAGE 10 Paragraph 4.4.4.4, lines 4 and 5: Delete *in accordance with Table VII in the sequence shownw and substitute accordance with Table VIII. Test sequence is optional.“ Table VIII: Delete “Test Sequencen column entirely. PAGE 13 Paragraph 4.5.3, line 4: Delete wcharacteristics indicated:“

13、 and substitute characteristics indicated: (See Figure 2)#. Paragraph 4.5.3(a): Delete nPressure gage:“ and substitute gage, outlet :“ Paragraph 4.5.3(b): Delete nHorsepower: two nominalH and substitute nHorsepower: two minimumn, Paragraph 4.5.3(e): Delete and substitute: khen connected in the test

14、configuration, the orifice shall be capable of.restricting the outlet water flow to produce a pressure of 265 - +10 psig minimum as indicated on the outlet pressure gagew. #(e) Variable orifice: ., Pige 2 of 5 I t-:r Licensed by Information Handling Services- MIL-P-82442 (6) 13 9999906 0360889 4 W M

15、IL-P-82442(OS) AMENDMENT 6 Paragraph 4.5.3 Add the following subsections: “f) Pressure gage, inlet: Range; O to 25 psig Accuracy: - - +2% full scale Operating temperature +25F to +150F minimum Gage size: 6-inch minimumn Element: 50 micron maximum Operating pressure . 50 psig minimum F1 ow capaci ty

16、: 10 gpm minimumw “h) Flow meter: hange : O - 10 gpm, accuracy to 22% full scale Minimum operating “(9) Filter: temperature: +25OF to +10O0Fn PAGE 14 Paragraph 4.5.4.2. Delete and substitute: “4.5.4.2 O eration. Install the pump in the pump test stand and connect it to the appropr 9-rt a e fittings

17、in accordance with Figures 1 and 2. With the drive unit operating the pump at 3880 210 rpm and with an inlet pressure of 15 52 psig, the output pressure shall be adjusted to 265 +10 psig. The flow rate shall be at least 8.3 gpm. The pump shall operate far 1 1/2 minutes on tap water. Post-test servic

18、ing and maintenance shall be performed in accordance with 4.5.7. When this acceptance test is performed as part of the preproduction test schedule, the minimum flow rate shall be 7.5 gpm”. Paragraph 4.5.7. Delete and substitute: #4.5.7 Post-test servicing and maintenance. The pump shall be dis- asse

19、mbled and cleaned after each run. All packing preforms shall be re- placed. The pump shall then be reassembled. The vanes must be installed in their original position with regard to rotation and contact edge, but may be interchanged from slot to slot. The wear plate shall not be reversed from its or

20、iginal position. The pump shall be lubricated in accordance with instructions on Drawing 1566923”. After paragraph 4.5.7 add new paragraph as follows: shall comply with th e requirements of Sec PAGE 17 4.5.8 Packaging, packing, and markin . Packaging, packing, and marking Paragraph 4.7.3. Delete the

21、 following: G rease MIL-G-3278 Lub r cant MIL-L-4343” * Paragraph 4.7.4. Under IDENTIFICATION delete wMS-29561-012, 014, 016n and substitute n1550752-15, 16, 17#. Page 3 of 5 -. - - -I_- Y Licensed by Information Handling ServicesPAGE 18 * Paragraph 4.7.4. Under IDENTIFICATION delete wNAS-617-4n and

22、 substitute “1557052-24“ PAGE 22 Replace Figure 2 with new Figure 2, attached. The margins of this amendment are marked with an asterisk to indicate where changes (additions, modifications, corrections, deletions) from the previous issue were made. This was done as a convenience only and the Governm

23、ent assumes no 1 iabi 1 i ty whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue. MIL-P-ZY42 (b) 13 W 999

24、9906 03b0890 O MIL-P-82442(OS) AMENDMENT 6 I Custodian Navy - OS Preparing Activity Navy - OS Project No. 1355-N xrc .- I . c _CI_-_?! f- Licensed by Information Handling Services. MIL-P-82LI42 (6) 33 m 9999906 0360893 2 m MIL-P-82442(OS) AMENDMENT 6 u Lc 1 x d o. a 1 rn I & I I r &I a 3 a 8 Page 5 of 5 ,r- II_ _ Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 13118-2010 Agricultural machinery - Potato harvesting equipment - Safety German version EN 13118 2000+A1 2009《农业机械 马铃薯收获设备 安全性 德文版本EN 13118-2000+A1-2009》.pdf DIN EN 13118-2010 Agricultural machinery - Potato harvesting equipment - Safety German version EN 13118 2000+A1 2009《农业机械 马铃薯收获设备 安全性 德文版本EN 13118-2000+A1-2009》.pdf
  • DIN EN 13119-2016 Curtain walling - Terminology Trilingual version EN 13119 2016《幕墙 术语 三种语言版本EN 13119-2016》.pdf DIN EN 13119-2016 Curtain walling - Terminology Trilingual version EN 13119 2016《幕墙 术语 三种语言版本EN 13119-2016》.pdf
  • DIN EN 1312-1997 Round and sawn timber - Determination of the batch volume of sawn timber German version EN 1312 1997《圆木材和板材 锯板批量体积测定》.pdf DIN EN 1312-1997 Round and sawn timber - Determination of the batch volume of sawn timber German version EN 1312 1997《圆木材和板材 锯板批量体积测定》.pdf
  • DIN EN 13120-2014 Internal blinds - Performance requirements including safety German version EN 13120 2009+A1 2014《内用百页窗 包括安全性的性能要求 德文版本EN 13120-2009+A1-2014》.pdf DIN EN 13120-2014 Internal blinds - Performance requirements including safety German version EN 13120 2009+A1 2014《内用百页窗 包括安全性的性能要求 德文版本EN 13120-2009+A1-2014》.pdf
  • DIN EN 13121-1-2003 GRP tanks and vessels for use above ground - Part 1 Raw materials Specification conditions and acceptance conditions German version EN 13121-1 2003《地上用GRP槽罐和容器 .pdf DIN EN 13121-1-2003 GRP tanks and vessels for use above ground - Part 1 Raw materials Specification conditions and acceptance conditions German version EN 13121-1 2003《地上用GRP槽罐和容器 .pdf
  • DIN EN 13121-2-2004 GRP tanks and vessels for use above ground - Part 2 Composite materials - Chemical resistance German version EN 13121-2 2003《地上用GRP槽罐和容器 第2部分 复合材料 耐化学性》.pdf DIN EN 13121-2-2004 GRP tanks and vessels for use above ground - Part 2 Composite materials - Chemical resistance German version EN 13121-2 2003《地上用GRP槽罐和容器 第2部分 复合材料 耐化学性》.pdf
  • DIN EN 13121-3-2016 GRP tanks and vessels for use above ground - Part 3 Design and workmanship German version EN 13121-3 2016《地上用GRP槽罐和容器 第3部分 设计和工艺 德文版本EN 13121-3-2016》.pdf DIN EN 13121-3-2016 GRP tanks and vessels for use above ground - Part 3 Design and workmanship German version EN 13121-3 2016《地上用GRP槽罐和容器 第3部分 设计和工艺 德文版本EN 13121-3-2016》.pdf
  • DIN EN 13121-4 Berichtigung 1-2007 GRP tanks and vessels for use above ground - Part 4 Delivery installation and maintenance German version EN 13121-4 2005 Corrigenda to DIN EN 131.pdf DIN EN 13121-4 Berichtigung 1-2007 GRP tanks and vessels for use above ground - Part 4 Delivery installation and maintenance German version EN 13121-4 2005 Corrigenda to DIN EN 131.pdf
  • DIN EN 13121-4 Corrigendum 1-2007 GRP tanks and vessels for use above ground-Part 4 Delivery installation and maintenance Corrigendum 1 to English version of DIN EN 13121-4 2005-03.pdf DIN EN 13121-4 Corrigendum 1-2007 GRP tanks and vessels for use above ground-Part 4 Delivery installation and maintenance Corrigendum 1 to English version of DIN EN 13121-4 2005-03.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1