NAVY MIL-R-28819 (1)-1983 RADIO NAVIGATION RECEIVING SET OMEGA AN BRN-7 AN SRN-17《AN BRN-7 AN SRN-17型奥米加导航系统的无线电海军接收设备》.pdf

上传人:rimleave225 文档编号:981239 上传时间:2019-03-12 格式:PDF 页数:6 大小:217.13KB
下载 相关 举报
NAVY MIL-R-28819 (1)-1983 RADIO NAVIGATION RECEIVING SET OMEGA AN BRN-7 AN SRN-17《AN BRN-7 AN SRN-17型奥米加导航系统的无线电海军接收设备》.pdf_第1页
第1页 / 共6页
NAVY MIL-R-28819 (1)-1983 RADIO NAVIGATION RECEIVING SET OMEGA AN BRN-7 AN SRN-17《AN BRN-7 AN SRN-17型奥米加导航系统的无线电海军接收设备》.pdf_第2页
第2页 / 共6页
NAVY MIL-R-28819 (1)-1983 RADIO NAVIGATION RECEIVING SET OMEGA AN BRN-7 AN SRN-17《AN BRN-7 AN SRN-17型奥米加导航系统的无线电海军接收设备》.pdf_第3页
第3页 / 共6页
NAVY MIL-R-28819 (1)-1983 RADIO NAVIGATION RECEIVING SET OMEGA AN BRN-7 AN SRN-17《AN BRN-7 AN SRN-17型奥米加导航系统的无线电海军接收设备》.pdf_第4页
第4页 / 共6页
NAVY MIL-R-28819 (1)-1983 RADIO NAVIGATION RECEIVING SET OMEGA AN BRN-7 AN SRN-17《AN BRN-7 AN SRN-17型奥米加导航系统的无线电海军接收设备》.pdf_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、Y MIL-R-28827 (I) 58 = 7997906 0155056 b W II i Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Command (ELEX-8111), Washington, DC 20363, by using the self-addressed Standardization Document Im

2、provement Proposal (DD Form 1426) appearing at the end of this document, or by letter. Commander, Naval Electronic Systems II .I F-6I-S MIL-R-Z8819(EC) AMENDMENT 1 3 January 1983 RADIO NAVIGATION RECEIVING SET, OMEGA, ANIBRN-7, AN/SRN-17 . This amendment forms a part of Military Specification MIL-R-

3、Z8819(EC), dated 19 May 1975, and is approved for use by the Naval Electronic Systems Command, Department of the Navy and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1, “SPECIFICATIONS“, “MILITARY“, after “MIL-S-901, Add: “MIL-C-915/6 Cable, Electrical

4、 600 Volts, Types SHOF, DHOF, THOF, And FHOF“. 2.1, “SPECIFICATIONS“, “MILITARY“, after “MIL-E-17555“, Add: “MIL-T-28820 Radio Navigation Receiving Set, Omega, ANIBRN-7, AN/SRN-7“. 2.1: “STANDARDS“, “MILITARY“: Delete “MIL-STD-167 Mechanical Vibrations of Shipboard Equip- ment“ and substitute MIL-S

5、TD-167-1 Mechanical Vibrations of Shipboard Equipment (Type I - Environ- mental and Type II - Internally Excite)“. 2.1, “STANDARDS“, “MILITARY“, after MIL-STD-167-1“, Add: “MIL-STD-454 I - Standard General Requirements For Electronic Equipment“. 2.1 “STANDARDS“, “MILITARY“: Delete “MIL-STD-480 Confi

6、guration Control-Engineering Changes, Deviations and Waivers. 2.1 “STANDARDS“, “MILITARY“: “MIL-STD-781: Delete “Reliability Tests Exponential Distribu- tion“ and substitute “Reliability Design Qualification And Production Acceptance Tests: Distribution“. Exponential 2.1 “STANDARDS“, “MILITARY“, aft

7、er “MIL-STD-781: Delete “MIL-STD-1399 - Interface Standard For Shipboard Systems“ and substitute “MIL-STD-1399, Section 702 - Interface Standard For Ship- board Systems Synchro Data Transmission“. PAGE 3 3.3.3: Delete. 3.4: Delete the text and substitute: “The equipment shall have an upper test mean

8、time- between-failure (MTBF) (O,) and a lower test MTBF (O,) of 2000 hours and 1000 hours, res- pectively. (Upper test MTFB (O,) and lower test MTBF (O,) are as defined in MIL-STD-781.)“. 3.6.3, line 3: Delete “Class IA and substitute “Class A5“. 3.6.5, first sentence: Delete “MIL-STD-167“ and subs

9、titute “MIL-STD-167-1. FSC 5825 o- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-28819 (1) 58 9999906 0355057 B MIL-R-28819( EC) AMENDMENT 1 PAGE 4 3.7.1, line 6: Deiete “will be FHOF-3.“ and substitute “shall be Type FHOF-3 in accordance wit

10、h MIL-C-915/6 .If PAGE 5 3.7.2.2, line 8: Delete: “35A-7“ and substitute “3SA-7“. 3.8.l(a), line 5: After “TS-3389“ Add “in accordance with MIL-T-28820ii. PAGE 7 3.8.2, line 1: After “ar“ add !specified“. PAGE 9 3.10.1.2(g) line 1: Delete ii6.2.3“ and substitute “6.3.3“; line 3: Delete “6.2.4“ and s

11、ub- st it Ute “6.3.4“. PAGE 12 After “3.10.8“, add the following new paragraphs: “3.11 Computer resources. Navy standard computer resources shall be used to implement system requirements; If this is not feasible, justification (including technical analysis, life-cycle cost comparison and potential s

12、chedule impact) shall be provided to the procuring activity prior to the use of any other computer resources. This includes computers, micro- computers, microprocessors, displays, peripherals, interfaces, and software. peres (mA). “3.12 Leakage current. “3.13 Workmanship. The leakage current of the

13、equipment shall not exceed 5 milliam- “3.13.1 General workmanship. Workmanship shall conform to Requirement 9 of MIL-STD-454. Soldering shall conform to Requirement 5 of MIL-STD-454. 3.13.2 Workmanship screen. All equipments shall withstand a defect detection vibration screen of random type vibratio

14、n at 0.04g2/Hz I3 dB from 80 Hz to 350 Hz and temperature cycling as specified in 4.6.11.2.“ PAGE 13 4.4.1, line 7: After last sentence: Add: “The general inspections shall be the first inspections conducted, and sha in TABLE IV.“ TABLE IV: Add the following new entries: “General workmanship 3.13.1

15、Workmanship screen Vibration 3.13.2 Temperature cycling 3.13.2 PAGE 14 TABLE V: TABLE VI, after “Inclination“, Add: “Leakage current 3.12“. Delete “Heat test“ and entry in its entirety. mrkmanship and workmanship screen 1 be performed n the order indicated i 2 of 6 Provided by IHSNot for ResaleNo re

16、production or networking permitted without license from IHS-,-,-MIL-R-288L7 (I) 58 7997706 015.5058 T = MIL-R-28819( EC) AMENDMENT 1 PAGE 15 4.5 through 4.5.2: Delete and substitute: “4.5 Reliability testing. 4.5.1 Reliability qualification testing. Reliability qualification testing shall be per- Th

17、is testing shall be accomplished in accordance formed on at least two production equipments. with MIL-STD-781, using Test Plan IIIC and Category 3A test conditions. The equipments shall be operated on a continuous operating cycle during the test. tion of those subjected to reliability qualification

18、testing, shall be subjected to a production reliability acceptance test, in accordance with the Accept-reject criteria figure of MIL-STD-781. The test duration for each equipment shall be 50 hours. During the test, the equipment shall be operated continuously in an ambient temperature of 40 Celsius

19、C) i5C. occurs during the test, the equipment shall be repaired and another 50-hour test run to verify repair.“ 4.5.2 Production reliability acceptance testing. Every production equipment, with the excep- If a failure (see 6.3.6) PAGE 17 After “4.6.8“. Add the following new paragraphs andFIGURES: “

20、4.6.9 Leakage current. Leakage current shall be measured at the steady-state power line voltage and frequency, 115 volts (V), 60 Hz and 400 Hz. equipment of the first months production. Thereafter, leakage current shall be measured on one equipment per 100 successive equipments produced, Leakage cur

21、rent shall be measured on one WARN I NG THIS TEST MAY BE HAZARDOUS DUE TO THE UNGROUNDED CONDITION OF THE EQUIPMENT DURING THE TEST. SHOCK PROTECTION!. DO NOT TOUCH EXPOSED METAL SURFACES WITHOUT ADEQUATE ELECTRIC THE UNITED STATES GOVERNMENT NEITHER ASSUMES NOR ACCEPTS RESPONSIBILITY FOR ANY INJURY

22、 OR DAMAGE THAT MAY OCCUR DURING OR AS A RESULT OF THIS TEST. 4.6.9.1 to an external power source and units deriving power from the equipment shall be placed on an insulated surface. All safety ground conductors between the equipment and units deriving power from the equipment shall be intact. The s

23、afety ground conductor between the equipment and the source power shall be opened during the test. OBSERVE WARNING STATEMENT. The equipment shall be connected as shown in FIGURE 3 if it is connected to single phase source power. ting configuration. Equipment controls in each operating mode shall be

24、such that maximum power will be utilized during leakage current measurements. The leakage current shall be determined by the voltage-drop method. A true rms voltmeter shall be used. The voltage measured across the 1500-ohm resistor, when equal to 7.5 V, represents 5 mA of leakage current. The overal

25、l measure- ment error shall not exceed five percent. The probe shall be used on all external conducting parts such as case, connector housing, recessed calibration or adjustment controls, and control shafts with knobs removed. The voltage shall be measured from each part to ground for every combinat

26、ion of switch positions available in FIGURE 3. The open safety ground conductor shall be reconnected imdiately after the test is completed.“ Equipment test connections. After power removal, each equipment directly connected 4.6.9.2 Measurement. Leakage current shall be measured on the equipment in i

27、ts normal opera- 3 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-28837 (1) 58 W 7779706 0355059 L U CI t W L 3 ul 5 E m c t W L L 3 U W Y aJ L O rc E m L m m m ? .r -0 CI ln aJ CI aJ v1 A= I W CTi t m n 7 g MI L-R-288 19 (EC) AMENDMENT 1

28、 i= w LL u v) U LL I 4 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-28819 (1) 58 999970b 0355060 8 MIL-R-28819(EC) AMENDMENT 1 “4.6.10 General workmanship. The equipment, including subassemblies and assemblies, shall be examined for wor

29、kmanship and soldering during the fabrication and assembly process and at the end item level, for conformance to the requirement of 3.13.1. performed on each equipment. level. All the hardware, including cables and connectors, shall be exposed to vibration. Vibration. approval, pseudo-random or comp

30、lex waveform vibration, for an accumulated time of 10 minutes in the axis deemed most susceptible to vibration excitation. All items shall be hard-mounted (with- out shock isolators) and subjected to the vibration conditions of FIGURE 4. The control accelero- meter shall be located next to one of th

31、e mounting points of the item under vibration. Spectral analysis equipment having a bandwidth no greater than 10 Hz for vibration frequencies up to 500 Hz and 100 Hz for vibration frequencies above 500 Hz shall be used for the control and analysis of the acceleration spectral density (ASD). The item

32、 shall be energized during vibration and appropriate input signals applied to observe any abnormal conditions of the output functional characteristics. All failures occurring during screening shall be corrected and the vibration resumed. 4.6.11 Workmanship screen. Prior to conducting temperature cyc

33、ling, vibration shall be fhe vibration may be performed at the module, drawer, or end item 4.6.11.1 The vibration shall be random, or subject to procuring activity 20 80 350 2000 FIIEOUENCV Iiiil FIGURE 4. Random vibration curve. 4.6.11.2 Temperature cycling. Each equipment shall be subjected to 10

34、cycles of the tem- perature curve shown in FIGURE 5. The temperature rate of change shall be not less than 5C per minute. shall be positioned for maximum exposure to the changing temperature. Where performance measure- ments are called for, a minimal functional operating test shall be performed. sha

35、ll be maintained until the largest electrical or electronic part in the equipment reaches 80 percent of the chamber temperature. cycling continued for a cumulative total of 10 cycles. The equipment power shall be turned on and off at the indicated times. The equipment The dwell time When failures oc

36、cur, the equipment shall be reworked and the 5 of 6 o Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-X 2 xx MIL-R-28819( EC) AMENDMENT 1 FIGURE 5. One cycle of temperature curve (not to scale).“ Preparing activity: (Project 5825-NO1 5( EC) ) NAVY - EC * U.S. GOVERNMENT PRINTING OFFICE: 183-605-034/1Z3S 6 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 3351-2012 en Aerospace series - Titanium alloy Ti-4Al-4Mo-2Sn - Solution treated and aged - Forgings - De 150 mm《航空航天系列 钛合金Ti-4Al-4Mo-2Sn解决方案 治疗和年龄-锻件De≤150毫米》.pdf EN 3351-2012 en Aerospace series - Titanium alloy Ti-4Al-4Mo-2Sn - Solution treated and aged - Forgings - De 150 mm《航空航天系列 钛合金Ti-4Al-4Mo-2Sn解决方案 治疗和年龄-锻件De≤150毫米》.pdf
  • EN 3354-2013 en Aerospace series - Titanium alloy Ti-6Al-4V - Annealed - Sheet for superplastic forming - a 6 mm《航空航天系列 钛合金Ti-6Al-4V -退火板超塑性成形-= 6毫米》.pdf EN 3354-2013 en Aerospace series - Titanium alloy Ti-6Al-4V - Annealed - Sheet for superplastic forming - a 6 mm《航空航天系列 钛合金Ti-6Al-4V -退火板超塑性成形-= 6毫米》.pdf
  • EN 3355-2012 en Aerospace series - Titanium alloy TI-P64001 (Ti-6Al-4V) - Annealed - Extruded section - De 150 mm - 900 MPa Rm 1 160 MPa《航空航天系列 钛合金TI-P64001(Ti-6Al-4V) 退火 挤压型材- De .pdf EN 3355-2012 en Aerospace series - Titanium alloy TI-P64001 (Ti-6Al-4V) - Annealed - Extruded section - De 150 mm - 900 MPa Rm 1 160 MPa《航空航天系列 钛合金TI-P64001(Ti-6Al-4V) 退火 挤压型材- De .pdf
  • EN 3359-2007 en Aerospace series - Steel FE-PM1503 (X3CrNiMoAl13-8-2) - Vacuum induction melted and consumable electrode remelted softened forging stock a or D less than or equal t.pdf EN 3359-2007 en Aerospace series - Steel FE-PM1503 (X3CrNiMoAl13-8-2) - Vacuum induction melted and consumable electrode remelted softened forging stock a or D less than or equal t.pdf
  • EN 336-2013 en Structural timber - Sizes permitted deviations《结构木材 尺寸和允许偏差》.pdf EN 336-2013 en Structural timber - Sizes permitted deviations《结构木材 尺寸和允许偏差》.pdf
  • EN 3361-2007 en Aerospace series - Steel FE-PM1802 (X5CrNiCu15-5) - Consumable electrode remelted solution treated and precipitation treated sheet and strip a less than or equal to.pdf EN 3361-2007 en Aerospace series - Steel FE-PM1802 (X5CrNiCu15-5) - Consumable electrode remelted solution treated and precipitation treated sheet and strip a less than or equal to.pdf
  • EN 3364-2007 en Aerospace series - Steel FE-PM1802 (X5CrNiCu15-5) - Consumable electrode remelted softened forging stock a or D less than or equal to 300 mm《航空航天系列 FE-PM1802(X5CrNi.pdf EN 3364-2007 en Aerospace series - Steel FE-PM1802 (X5CrNiCu15-5) - Consumable electrode remelted softened forging stock a or D less than or equal to 300 mm《航空航天系列 FE-PM1802(X5CrNi.pdf
  • EN 3365-2007 en Aerospace series - Steel FE-PM3901 (X15CrNi17-3) - Air melted softened forging stock a or D less than or equal to 300 mm《航空航天系列 FE-PM3901(X15CrNi17-3)型钢 a或D≤300 mm空.pdf EN 3365-2007 en Aerospace series - Steel FE-PM3901 (X15CrNi17-3) - Air melted softened forging stock a or D less than or equal to 300 mm《航空航天系列 FE-PM3901(X15CrNi17-3)型钢 a或D≤300 mm空.pdf
  • EN 3368-2008 en Aerospace series - Aerospace design standard - Holes for locating pins《航空航天系列 航空航天设计标准 定位销的孔》.pdf EN 3368-2008 en Aerospace series - Aerospace design standard - Holes for locating pins《航空航天系列 航空航天设计标准 定位销的孔》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1