NAVY MIL-R-81574-1968 RESCUE HAND TOOL PNEUMATIC《救援用的气动手工具》.pdf

上传人:赵齐羽 文档编号:981369 上传时间:2019-03-12 格式:PDF 页数:12 大小:440.52KB
下载 相关 举报
NAVY MIL-R-81574-1968 RESCUE HAND TOOL PNEUMATIC《救援用的气动手工具》.pdf_第1页
第1页 / 共12页
NAVY MIL-R-81574-1968 RESCUE HAND TOOL PNEUMATIC《救援用的气动手工具》.pdf_第2页
第2页 / 共12页
NAVY MIL-R-81574-1968 RESCUE HAND TOOL PNEUMATIC《救援用的气动手工具》.pdf_第3页
第3页 / 共12页
NAVY MIL-R-81574-1968 RESCUE HAND TOOL PNEUMATIC《救援用的气动手工具》.pdf_第4页
第4页 / 共12页
NAVY MIL-R-81574-1968 RESCUE HAND TOOL PNEUMATIC《救援用的气动手工具》.pdf_第5页
第5页 / 共12页
点击查看更多>>
资源描述

1、r” MIL-R-8157q L12 m 777770b 023b085 2 = I M Test Methods Sampling Procedures and Tables for Inspection by Attributes Marking for Shipment and Storage DRAWINGS Naval Air Systems Command 64A83C41 64A83H18 Parts Index, Rescue Hand Tool Assembly Holster Assembly, Rescue Hand Tool (When requesting any o

2、f the applicable documents, refer to both title and number. All requests should be made via the cognizant Government quality assurance representative. Copies of this specification and other unclassified specifications, standards, and drawings required by contractors in connection with specific pro-

3、curement functions should be obtained upon application to the Commanding Officer, Naval Supply Depot (Code 1051), 5801 Tabor Avenue, Philadelphia, Pennsylvania 19120. All other documents should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Qu

4、alification - The rescue hand tools furnished under this speci- fication shall be products which are qualified for listing on the applicable qualified products list at the time set for opening of bids. (See 4.3 and 6.3). 3.2 First article - The rescue hand tools furnished under this specifi- cation

5、shall be a product which has been inspected and passed the first article inspec- tion specified herein. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3 Materials - Materials shall conform to applicable specifications and shall be as specified h

6、erein and on applicable drawings. 3.3.1 Metal parts - All metal parts shall be of a corrosion-resistant material or treated in a manner to render them adequately resistant to corrosion. 3.3.2 Protective treatment - Materials used in the construction of the rescue hand tools that are subject to deter

7、ioration when exposed to the climatic and environmental conditions that will occur during service use, shall be protected against such deterioration in such a manner that will in no way prevent compliance with the performance requirements of this specification. The use of any protective coating that

8、 will crack, chip or scale with age or extremes of climate and environ- mental conditions shall be avoided. 3.4 Construction - The rescue hand tools shall be constructed in accordance with the applicable drawings specified on Naval Air Systems Command Drawing No. 64A83C41. 3.5 Holster - Each rescue

9、hand tool shall be furnished with a holster conforming to NASC Drawing No. 64A83H18. 3.6 Nitrogen cylinder - The nitrogen cylinder used to operate the rescue hand tool shall conform to MIL-C81575 3.7 Performance - 3.7.1 Proof pressure - The rescue hand tool, when tested as specified in 4.6.2, shall

10、not show any signs of leakage. 3.7.2 Leakage - The rescue hand tool, when tested as specified in 4.6.3, shall not show signs of leakage after being submerged for a period of 5 minutes. 3.7.3 Operation - The rescue hand tool, when tested as specified in 4.6.4, shall be capable of making a minimum of

11、four cuts through double thicknesses of webbing conforming to MIL-W-4088, Type XIII and one cut through a 7/32 inch diameter 19 x 7 stainless steel cable. 3.7.4 Impact - The rescue hand tool, when tested as specified in 4.6.5, shall not show signs of material failure, leakage or malfunction. 3 Provi

12、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-R-81574 42 II 7377706 0236088 W I MIL-R-81574 (AS) Finish - - 3.8 3.8.1 Surface treatment - Aluminum parts shall be cleaned and anodized as specified on the applicable drawing. 3.8.2 Painting - Walkway

13、coating conforming to MILW-5044 shall be applied to the handle area, as indicated on the applicable drawing, to provide a nonslip surface. 3.9 WorkmanshiD - The rescue hand tools shall be uniform in quality and shall be free from defects, irregularities or foreign matter which could adversely affect

14、 safety, performance, durability or reliability. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection - Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise s

15、pecified in the contract or order, the supplier may use his own or any other facilities suit- able for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government rsserves the right to perform any of the inspections set forth in the specifica

16、tion where such inspections are deemed necessary to assure supplies and services conform to prescribed re- quirements. 4.2 Classification of inspection - The examination and testing of the rescue had tools shall be classified as follows: (a) Qualification inspection - Qualification inspection consis

17、ts of tests and examinations performed on samples submitted for approval as qualified products (see 4.3). (b) First article inspection - First article inspection consists of examinations and tests performed on rescue hand tools which are representative of the production item after award of a contrac

18、t to determine that the production item conforms to the requirements of this specification (see 4.4). (c) Quality conformance inspection - QuaIity conform- ance inspection consists of examinations and tests performed on individual products OF lots to deter- mine conformance of the products or lots w

19、ith requirements set forth in this specification (see 4.5). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- rn MIL-R-8157Ll 42 E 999970b 0236089 T 4.3 Qualification inspection - Qualification inspection shall consist of all tests and examinations li

20、sted in this specification. 4.3.1 Qualification inspection samples - The qualification inspection samples shall consist of two rescue hand tools. The qualification samples shall be forwarded to the Supply Officer, Naval Air Development Center, Johnsville, WarminSter, Pennsylvania 18974, Attention: D

21、irector, Aerospace Crew Equip- ment Department. The samples shall be plainly identified by securely attached dur- able tags marked with the followtng information: Samples for Qualificatioa Inspection RESCUE HAND TOOL, PI$EXJMATIC Manufacturers designation or number Name of Manufacturer Submitted by

22、(name)(date) for qualification inspection in accordance with the requirements of Specification MILR- 81574 under authorization (reference authorizing letter). 4.4 First article inspection - The first article inspection shall consist of the following examinations and tests: Visual examination Dimensi

23、onal examination Proof pressure Leakage Operation Impact 4.4.1 First article samples - Unless otherwise specified, as soon as practicable after award of the contract or order, the manufacturer shall submit two rescue hand tools. The samples shall be representative of the construction, workmanship, c

24、omponents, and materials to be used during production. When a manufacturer is in continuous production,of these rescue hand tools from contract to contract, submission of further first article inspection samples on the new con- tract may be waived at the discretion of the procuring activity (see 6.2

25、). Approval of the first article inspection sample or the waiving of the first article inspection does not preclude the requirements for performing the quality confomance in- spection. The first article inspection samples shall be furnished the Government . as directed by the contracting officer (se

26、e 6.2). 4.4.2 Upon completion of the first article inspection, all the applicable inspection reports, and when applicable, recommendations and comments per- tinent for use in monitoring production shall be forwarded to the cognizant Provided by IHSNot for ResaleNo reproduction or networking permitte

27、d without license from IHS-,-,-MIL-R-81574 Li2 3777306 0236030 b -7 MZ-R-81574( AS) Government Activity. One rescue hand tool shall be returned to the manufacturer for use in monitoring production. The other rescue hand tool will be consumed or destroyed in the first article inspection and shall not

28、 be considered as part of the quantity to be delivered under contract. 4.5 Quality conformance inspection - The quality ccnformance in- spection shall consist of the following: Visual examination Dimensional examination Proof pressure Leakage Operation Impact Preparation for delivery 4.5.1 Sampling

29、- 4.5.1.1 Inspection lot - 4.5.1.1.1 Rescue hand tools - An inspection lot shall be expressed in units of one rescue hand tool, made essentially under the same conditions and from the same materials and components. The sample unit shall be one rescue hand tool. 4.5.1.1.2. Preparation for deliverx -

30、An inspection lot size shall be ex- pressed in units of one fully prepared shipping container, containing rescue hand tools fully prepared for delivery, made from essentially the same materials and components. The sample unit shall be one shipping container, containing rescue hand tools fully prepar

31、ed for delivery with the exception that it need not be sealed. 4.5.1.2 Sampling for tests and examinations of rescue hand tools - The sample size, acceptance criteria, tests, and examinations required for the rescue hand tools shall be as specified in Table I. 4.6 Inspection methods - 4.6.1 Visual e

32、xamination - 4.6.1.1 Rescue hand tools - Each rescue hand tool selected in accord- ance with Table Ishallbe examinedvisually to determine conformance to this speci- fication. The classification of defects, Table II, shall be used to classify the defects found. For dimensional defects, each rescue ha

33、nd tool selectedas a sample unit from the lot shall be thoroughly checked dimensionally to determine conformance to this specification. The classificationof defects; Tableill, shall be usedto classify the defects found. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without l

34、icense from IHS-,-,-MIL-R-8L574 42 lsl 7779706 0236071 8 E I mSpE CT ION TABLE. I METHOD ACCEPTANCE PA RA GM PH SAMPLE SIZE CRITERIA i/ - SAMPLE SIZE, ACCEPTANCE CRITERIA, EXAMINATIONS AND TESTS OF THE RESCUE HAND TOOLS Every unit for critical defects. Inspection Level II for minor defects Reject al

35、l units with any critical defects and an Acceptable Quality Level of 2.5 dekcts per 100 units for minor defects Visual examination Dimensional examination 4.6.1.1 4.6.1.1 Inspection Level An Acceptable Quality s- 2 Level of 2.5 defects per 100 units Inspection Level 5-2 Inspection Level s- 2 Inspect

36、ion Level s- 2 An Acceptable Quality Level of 2.5 defects per 100 units An Acceptable Quality Level of 2.5 defects per 100 units An Acceptable Quality Level of 2.5 defects per 100 units Proof pres sure Leakage Oper ation 4,6.2 4.6.3 4.6.4 4.6.5 4.6.1.2 Inspection Level An Acceptable Quality s- 2 Lev

37、el of 2.5 defects per 100 units Inspection Level An Acceptable Quality s- 2 Level of 4. O defects per 100 units Impact Preparation for delivery - i/ The sampling plan acceptance number shall apply collectively to all he characteristics within a stated acceptable quality level. . . . . . . - . - . .

38、- 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIER-81574 (Ac) MINOR TABLE II CRITICAL CLASSIFICATION OF DEFECTS FOR VISUAL EXAMINATION OF THE TOOL Flaw in the material Incorrect or incomplete marking Loose particles inside the rescue hand tool

39、Rust or scale Existence of any foreign material, solid or liquid DEFECTS Incorrect configuration Incorrect or defective threads Incorrect, incomplete, or faulty finish Any functioning part that works with difficulty X X X X X X I X I X TABLE III LIST OF DEFECTS FOR FINISHED DIIVENSIONS EXAMINE Measu

40、re all visible com- ponents of the pneumatic rescue hand tool assembly DEFECT Any measurement deviating nom the dimensions and tolerances as specified in this specification and applicable ACED drawings shall be classi- fied as a dimensional defect. I I 8 Provided by IHSNot for ResaleNo reproduction

41、or networking permitted without license from IHS-,-,-MIL-R-BI574 42 W 9799906 0236073 I = MIL-R-81574 (AS) TABLE IV CLASSIFICATION OF DEFECTS FOR PREPARATION FOR DEWERY ITEM Contents Exterior and interior Packaging and pack- ing materials Exterior and interior weight or content DEFECT More than one

42、complete assembly in the same container. All components not of the same size. Missing, incomplete, incorrect, illegible; of improper size, location, sequence, or method of application; exterior and interior markings different. Inadequate application of the components such as incomplete closure of un

43、it package, intermediate package, case liners, container flaps, loose strappings, etc. ; bulging or distortion of the confainers. Number per container is more or less than re- quired; gross or net weight exceeds the requirement. 4.6.1.2 Preparation for delivery - Each of the fully prepared shipping

44、containers, containing rescue hand tools, selected as a sample unit from the lot shail be visually examined to determine that the packaging, packing, and marking conform to this specification. The classification of defects, Table IV, shall be used to classify the defects found. 4.6.2 Proof pressure

45、test - The gas storage area of the rescue hand tool shall be subjected to an internal pressure of 4000 psig for one minute. The rescue hand tool shall pass the requirements specified in 3.7.1. 4.6.3 Leakage - The complete rescue hand tool shall be charged using a nitrogen cylinder; then, without dep

46、ressing the trigger, completeIy submerged in clear water to a depth of one inch. The rescue hand tool shall pass the requirements specified in 3.7.2. With the rescue hand tool still submerged, two thicknesses of web- bing conforming to MIL-W-4088, Type XIIi shall be placed in the opening, and the tr

47、ig- ger squeezed andheld. The rescue handtool shall pass the requirements specifiedin 3.7.2. 4.6.4 Operation - With a test blade installed, the rescue hand tool shall be pressurized using a nitrogen cylinder. The rescue hand tool shall be sub- merged in one foot of water and operated. The rescue han

48、d tool shall meet the requirements specified in 3.7.3. to break through a piece of acrylic plastic sheet, MILP-5425 finish A, or mod- ified acrylic plastic sheet, MIL-P-8184 finish A, O. 312 thick. The qcrylic 4.6.5 Impact test - The rescue hand tool shail be used as a hammer 9 Provided by IHSNot fo

49、r ResaleNo reproduction or networking permitted without license from IHS-,-,-.I MIL-R-81574 42 777770b 0236074 3 H - plastic specimen shall be 4 feet x 4 feet and shall be clamped securely to a rigid frame. The aft face of the hook assembly in the area directly behind the blade opening shall be used as the hammer head. The rescue hand tool shall be held in the normal gripping area with one hand. Upon completion o

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1