NAVY MIL-STD-1323-251-1981 UNIT LOAD FOR UNDERWAY REPLENISHMENT MARK 52 55 MINE ACTUATION DUMMY FLIGHT GEAR SUB ASSEMBLY IN CONTAINER MARK 662 MOD 0《MARK 662 MOD 0容器飞行传动装置潜水艇集合虚拟刺激.pdf

上传人:eveningprove235 文档编号:982155 上传时间:2019-03-12 格式:PDF 页数:2 大小:100.52KB
下载 相关 举报
NAVY MIL-STD-1323-251-1981 UNIT LOAD FOR UNDERWAY REPLENISHMENT MARK 52 55 MINE ACTUATION DUMMY FLIGHT GEAR SUB ASSEMBLY IN CONTAINER MARK 662 MOD 0《MARK 662 MOD 0容器飞行传动装置潜水艇集合虚拟刺激.pdf_第1页
第1页 / 共2页
NAVY MIL-STD-1323-251-1981 UNIT LOAD FOR UNDERWAY REPLENISHMENT MARK 52 55 MINE ACTUATION DUMMY FLIGHT GEAR SUB ASSEMBLY IN CONTAINER MARK 662 MOD 0《MARK 662 MOD 0容器飞行传动装置潜水艇集合虚拟刺激.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 MIL-STD-1323 -251 41 7777911 0071473 2 il f-37-03 MILITARY STANDARD MIL-STD-1323-251 (NAVY) M MARCH 1981 UNIT LOAD F O R U N DE RW AY REPL EN ISH M E N T MK 52/55 MINE ACTUATION DUMMY FLIGHT GEAR SUB ASSEMBLY IN CONTAINER MK 462 MOD O UNIT LOU MM DOOIC/NALC NO. FWM, m7, we, FWBP NUMBER OF ASSEMBLI

2、ES PER CONTAINER. NUMBER OF ASSEMBLIES PER UNIT LOAD WEIGHT OF WOOR BATTENS (APPROX) . 5 US. WEIGHT OF STEEL STRAPPING (APPROX) . 6 LBS. WEIGHT OF PALLET (APPROX) . 94 LBS. 1329 LBS. CUBE 85.0 CU FT 1 4 4 NUMBER OF CONTAINERS PER UNIT LOAD GROSS WEIGHT OF ONE CONTMNER(APPR0- 306 LBS. GROSS WEIGHT OF

3、 UNIT LOAD (APPROX) . HAZARD CLASSIFICATION CG . Do NOT STACK MORE THAN NOTES: 1. UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. 2. FOR CROSS REFERENCE TO ASSOCIATED TRUCKLOADING, CONTAINERLOADING AND CARLOADING MILITARY STANDARDS, REFER TO INDEX TO STANDARDS, MIL-HDBK-236 (NAVY) REQUIREMENTS

4、FOR CONSTRUCTION THIS UNIT LOAD SHALL CONSIST OF THLS DOCUMENT AND THE LATEST THIS UNIT LOAD IS AUTHORIZED AND RELEASED FOR SHIPPING, HANDLING, STORAGE AND TRANSFER-AT-SEA. IT hWY ALSO BE USED FOR DOMESTIC SHIPMENT IN COMPLIANCE WITH DQT REGULATIONS. ISSUE OF MIL-STD-1323 (NAVY) Q US. GOVERNMENT PRI

5、NTING OFFICE 1981-703-023/17f2 J Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-M IL-STD-13 2 3-251 (NAVY) PALLETIZING PROCEDURE (a) THREAD STRAPPING, ITEM 2, BETWEEN DECK WIRES OF PALLET, ITEM 1, AS SHOWN IN DETAIL A. (b) POSITION THE CONTAINERS ON

6、 THE PALLET DECK WITH EQUAL OVERHANG ON BOTH SIDES AND ENDS. (c) POSITION TOP BATTENS, ITEM 5. (d) POSITION STRAPPING, ITEM 3, UNDER THE PALLET DECK AND AROUND THE UNIT LOAD, TENSION AND DOUBLE NOTCH SEAL, ITEM4. (e) POSITION STRAPPING, ITEM 2, AROUND THE CONTAINERS, TENSION AND DOUBLE NOTCH SEAL. (

7、f) SECURE STRAPPING TO TOP BATTENS WITH STAPLES, ITEM 6. MARKING: THE UNIT LOAD SHALL BE MARKED IN ACCORDANCE WITH MIL-STD-1323. 45 3/4 THREAD STRAPPING BETWEEN 3rd AND 4th WIRE DEPALLETIZING PROCEDURE (O) REMOVE STAPLES. b) CUT AND REMOVE STRAPPING. (c) REMOVE BATTENS. (d) REMOVE CONTAINERS. NOTES:

8、 1. SEE DETAIL UNLESS OTHERWISE SPECIFIED MATERIAL SHALL BE IN ACCORDANCE WITH THE GENERAL DOCUMENT MIL-STD-1323. COLD ROLLED, HEAT TREATED .O31 STRAPPING MY BE SUBSTITUTED. 2. I 2 2 E- 1 1 STAPLE SEE NOTE l 3/4 BATTEN SEE NOTE 1 1 X 6 X 27 1/4 SEAL SEE NOTE 1 3/4 STRAPPING SEE NOTE 2 3/4 X .O35 X 1

9、7FT. STRAPPING SEE NOTE 2 3/4 X .O35 X ITT. PALLET 561200 40 x 48 x 4 3/4 I REQ. I ITEM I DESCRIPTIONIMATI/DWGI DIMENSIONS I LIST OF MATERIALS REVIEW ACTIVITY: NAW - OS PREPATING ACTIVITY: NAW - OS PROJECT NO. 8140-N480 PAGE 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1