NAVY MIL-STD-2148-1983 VIBRATION DAMPING MATERIALS PROCEDURES FOR INSTALLATION MAINTENANCE AND REPAIRS《安装保持和修理程序制动材料振动》.pdf

上传人:brainfellow396 文档编号:982402 上传时间:2019-03-12 格式:PDF 页数:90 大小:1.24MB
下载 相关 举报
NAVY MIL-STD-2148-1983 VIBRATION DAMPING MATERIALS PROCEDURES FOR INSTALLATION MAINTENANCE AND REPAIRS《安装保持和修理程序制动材料振动》.pdf_第1页
第1页 / 共90页
NAVY MIL-STD-2148-1983 VIBRATION DAMPING MATERIALS PROCEDURES FOR INSTALLATION MAINTENANCE AND REPAIRS《安装保持和修理程序制动材料振动》.pdf_第2页
第2页 / 共90页
NAVY MIL-STD-2148-1983 VIBRATION DAMPING MATERIALS PROCEDURES FOR INSTALLATION MAINTENANCE AND REPAIRS《安装保持和修理程序制动材料振动》.pdf_第3页
第3页 / 共90页
NAVY MIL-STD-2148-1983 VIBRATION DAMPING MATERIALS PROCEDURES FOR INSTALLATION MAINTENANCE AND REPAIRS《安装保持和修理程序制动材料振动》.pdf_第4页
第4页 / 共90页
NAVY MIL-STD-2148-1983 VIBRATION DAMPING MATERIALS PROCEDURES FOR INSTALLATION MAINTENANCE AND REPAIRS《安装保持和修理程序制动材料振动》.pdf_第5页
第5页 / 共90页
点击查看更多>>
资源描述

1、NOTE: MIL-STD-2148 has been redesignated as a standard practice. The coverpage has been changed for Administrative reasons. There are no other changesto this Document.MIL-STD-2148(SH)12 August 1983SUPERSEDINGNAVSEA 0939-LP-000-1010June of 1968AMSC N/A FSC 93GPDISTRIBUTION STATEMENT A. Approved for p

2、ublic release; distribution isunlimited.DEPARTMENT OF DEFENSESTANDARD PRACTICEVIBRATION DAMPING MATERIALS,PROCEDURES FOR INSTALLATION, MAINTENANCE,AND REPAIRSProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-MIL-STD-2148(SH)12 August 1983DEPARTMENT OF TH

3、E NAVYNAVAL SEA SYSTEMS COMMANDWashington, DC 20362Vibration Damping Materials, Procedures for Installation,Maintenance, and RepairsMIL-STD-2148(SH)1. This Military Standard is approved for use by the Naval Sea SystemsCommand, Department of the Navy, and is available for use by all Departmentsand Ag

4、encies of the Department of Defense.2. Beneficial comments (recommendations, additions, deletions) and any perti-nent data which may be of use in improving this document should be addressedto: Commander, Naval Sea Systems Command, SEA 5523, Department of the Navy,Washington, DC 20362 by using the se

5、lf-addressed Standardization DocumentImprovement Proposal (DD Form 1426) appearing at the end of this document orby letter.iiProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-MIL-STD-2148(SH)12 August 1983FOREWORD1. This Military Standard provides instru

6、ctions for the selection, instal-lation, maintenance, and repair of vibration damping materials.2. Noise radiated from a ship into the sea is in part due to the resonanceresponse of the ships structures to applied vibratory forces. These forces,for the most part, originate in machinery or equipment

7、supported on foundations,bulkheads, and decks. The turbulent flow of water around the hull of a surfaceship or submarine produces hydrodynamic forces which excite the hull plates invibratory motion. Damping treatments applied on these structures reduce theamplitudes of motion and force at their nume

8、rous resonance frequencies, and thusreduce radiated noise.iiiProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-MIL-STD-2148(SH)12 August 1983CONTENTSPageParagraph 1.1.11.22.2.12.23.3.13.23.33.43.53.63.73.83.93.103.113.123.133.143.153.163.173.184.4.14.24.

9、2.14.2.24.2.34.2.3.14.2.44.2.54.2.5.14.2.5.1.14.2.64.2.6.14.2.6.24.2.6.34.2.6.44.2.6.54.3SCOPE - 1Scope - 1Classification - 1REFERENCED DOCUMENTS - 1Issues of documents - 1Other publications - 4DEFINITIONS -Anti-corrosion paint -Antifouling paint -Constraining layer -Damping -Damping material -Dry f

10、ilm thickness -Epoxy -Free-layer damping -Galvanic corrosion -Grit-blasting -Near-white metal -Resonance frequency -Restraining layer -Sweep-blasting -Template -1,1,1 trichloroethane -Zinc -445555555555666666Zinc chromate - 6GENERAL REQUIREMENTS -Discussion -General -Interference from other systems

11、-Pre-forming damping materials -Areas with reinforced members -Areas with irregularly shaped members -Damage preventive measures -Constraining layers -Studs, nuts, and washers -Replacement of studs -Materials installed in combination withdamping treatments -Acoustic absorptive or thermal insulation

12、-Reflector and decoupler tiles -Acoustic absorber tiles -Cableway hangers -Air pollution regulations -Submarines -666777777778889999ivProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-MIL-STD-2148(SH)12 August 1983CONTENTS - ContinuedPageParagraph 4.3.14

13、.3.24.3.34.3.44.3.54.3.64.3.74.44.4.14.4.24.4.34.4.44.4.54.54.5.14.5.1.14.5.1.1.14.5.1.1.24.5.1.24.5.1.34.5.1.44.5.24.5.2.14.5.2.24.5.2.2.14.5.2.34.5.2.3.14.5.2.44.5.2.54.5.2.5.14.5.2.5.24.5.2.5.34.5.2.5.44.5.2.5.54.5.2.5.64.5.2.64.5.2.6.14.5.2.6.24.5.2.6.34.5.2.6.44.5.2.6.54.5.2.6.64.5.2.6.7Main ba

14、llast tanks -Tanks-bilge-collecting, main lubricating oiland lubricating oil settling, shaft lubri-cating oil sump, surge depth control,sanitary, and potable water -Superstructure, fairwater, and other free-flooded spaces -Hull frames -Machinery or noise-critical equipment founda-tions, bulkheads, a

15、nd girders -Platform decks and supporting beams -Sonar domes -Surface ships -Hull, frames, longitudinal stiffeners, andkeel -Bulkheads and platform decks -Surface ship machinery foundations -Fuel oil and salt water tanks -Sonar domes -General health and safety requirements -General health hazards -P

16、aint materials -Epoxy paints -Vinyl antifouling paints -Adhesive materials -Damping materials -Surface preparation materials -General safety measures -Working environment -Respiratory protection -Types of respirators -Eye protection -Eyelashes -Protective clothing -Safety precautions for abrasive bl

17、asting -Preventive measures -Requirements prior to blasting operations -Pre-abrasive blasting inspection -Post abrasive blasting inspection -Abrasive blasting protective equipment -Staging -Safety precautions for mixing paint -Fire prevention precautions -Accidental ignition -Electrical equipment -P

18、ersonnel protective precautions -Sensitivity and allergic reactions -Vinyl paints -Epoxy paints -9101111111212121212121313131313131313141414141415151515151515161616161717171717171717vProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-MIL-STD-2148(SH)12 Au

19、gust 1983CONTENTS - ContinuedPageParagraph 4.5.2.6.7.14.5.2.6.7.24.5.2.74.5.2,7.14.5.2.7.24.5.2.7.34.5.2.7.44.5.2.7.54.5.2.7.64.5.2.7.74.5.2.7.84.5.2.7.94.5.2.7.104.5.2.7.114.5.2.7.124.5.2.7.134.5.2.7.144.5.2.84.5.2.94.5.2.9.14.5.2.9.2215.1.15.1.1.15.1.1.25.1.1.35.1.1.45.1.1.55.1.25.1.2.15.1.2.2Derm

20、atitis and allergy hazard -Epoxy thinners or solvents -Safety precautions for paint application -Danger area -Application by brush or roller -Vinyl and epoxy paints -Application by spray -Fire prevention precautions -Application in confined spaces -Explosion-proof lamps -Gas-free testing -Ventilatio

21、n -Personnel protective precautions -Protective clothing -Showers -Cleaning spray guns -Epoxy paints -Safety precautions for adhesive mixing andapplication -Cleaning with decreasing solvents -Eye protection -Skin protection -5. DETAILED REQUIREMENTS -5.1 Installation of type II, class 1, class 2 and

22、class 3 damping tiles on lightweight plate1/8 to 11/16-inch thickness (MIL-P-23653) -Materials -Damping tiles -Adhesive -Restraining materials -Protective materials -Cleaning materials -Safety precautions and environmental control -Handling damping tiles -5.1.2.35.1.35.1.3.15.1.3.1.15.1.3.1.25.1.3.1

23、.35.1.3.2Protective measures used when handling dampingmaterials -Environmental requirements -Surface preparation prior to installation ofdamping tiles -Ballast and trim tank interiors -Attachment of studs -Protection of stud threads -Cleaning and coating the steel surfaces -Interiors of flooded spa

24、ces other than ballasttanks and trim tanks (sonar domes, super-structure areas and fairwaters) -1818181818181818191919191919191920202020202121212121212222222322222222222323viProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-MIL-STD-2148(SH)12 August 1983

25、CONTENTS - ContinuedParagraph 5.1.3.35.1.3.45.1.3.55.1.3.5.15.1.45.1.4.15.1.4.25.1.4.35.1.4.45.1.4.55.1.55.1.5.15.1.5.25.1.5.35.1.65.1.6.15.1.6.1.15.1.6.25.1.75.1.7.15.1.7.25.1.85.1.8.15.1.8.25.1.8.35.1.8.3.15.1.8.3.25.25.2.15.2.1.15.2.1.25.2.1.35.2.1.45.2.1.55.2.25.2.35.2.3.15.2.3.1.1Foundations, b

26、ulkheads, platform decksand tanks (dry side only) -Gear cases and structures which operate attemperatures of 80 to 155F-Non-steel surfaces -Galvanized coatings -Fitting of tiles -Areas requiring a restraining layer -Areas not requiring a restraining layer -Fitting around weld beads -Drilling and pun

27、ching holes -Preforming -Preparation of the adhesive -Adhesive pot life -Preheating -Cleaning -Installation of damping materials -Ballast and trim tank interiors (type II,class 1 tiles only) -Installation of the restraining layer -Installation of type II, class 1, 2, and 3tiles in areas not requirin

28、g a restraininglayer -Paint application -Corrosion protection and habitability areapaints -Antifouling paints -Maintenance procedures -Cleaning of tiles and restraining layers -Repair of minor damage to damping treatments -Repair of major damage to damping treatments -Replacing missing studs -Repain

29、ting -Requirements for installation of type IIdamping tiles on heavy steel plate, 3/4-inchor greater -Materials -Damping tiles -Adhesive -Constraining materials -Protective materials -Cleaning materials -Safety precautions and environmental control -Surface preparation prior to installation ofdampin

30、g tiles -Attachment of studs -Protection of stud threads -Page2424242525252525262626262626272727282828282828292929293030303030313232323232viiProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-MIL-STD-2148(SH)12 August 1983CONTENTS - ContinuedPageParagraph

31、 5.2.3.25.2.3.35.2.45.2.4.15.2.55.2.5.15.2.5.25.2.65.2.6.15.2.6.25.2.6.35.2.75.2.7.15.2.7.25.2.7.35.2.7.45.2.85.2.8.15.2.8.25.2.95.2.9.15.2.9.25.2.9.35.35.3.15.3.1.15.3.1.25.3.1.35.3.1.45.3.25.3.2.15.3.2.25.3.2.35.3.35.3.3.15.3.3.25.3.3.35.3.3.45.3.4Cleaning and coating of the steel surfaces(wet are

32、as only) -Cleaning and coating of the steel surfaces(dry areas only) -Selecting and fitting of the constraininglayer -Painting -Fitting of tiles -Drilling and punching holes -cutting -Preparation of the adhesive -Adhesive pot life -Preheating -Cleaning -Installation of damping materials -Insulation

33、sleeving -Damping tiles -Constraining layer -Insulating washers -Paint application -Corrosion protection and habitable areapaints -Antifouling paints -Maintenance procedures -Cleaning of damping treatment -Minor repair of damping treatment -Major repair of damping treatment -Requirements for install

34、ation of type IIIdamping tiles -Materials -Damping tiles -Adhesive -Protective materials -Cleaning materials -Safety precautions and environmental control -Handling damping tile -Handling of bonding materials -Environmental requirements -Surface preparation prior to installation oftiles -Hull, keel,

35、 frames, bulkheads and undersideof platform decks (dry spaces only) -Bilges, bilge wells, peak tanks and sumps(wet spaces only) -Fuel tanks -Floodable spaces other than fuel tanks(sonar domes and saltwater tanks) -Preparation of tiles -323333333434343434343435353535353636363636363637373737373737373737383838393940viiiProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-Paragraph 5.3.4.15.3.55.3.5.15.3.5

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1