NAVY MIL-T-45499 C-1993 THRUSTER CARTRIDGE ACTUATED M1A2 ASSEMBLY《M1A2集合开动弹药筒推进器》.pdf

上传人:figureissue185 文档编号:982705 上传时间:2019-03-12 格式:PDF 页数:11 大小:400.66KB
下载 相关 举报
NAVY MIL-T-45499 C-1993 THRUSTER CARTRIDGE ACTUATED M1A2 ASSEMBLY《M1A2集合开动弹药筒推进器》.pdf_第1页
第1页 / 共11页
NAVY MIL-T-45499 C-1993 THRUSTER CARTRIDGE ACTUATED M1A2 ASSEMBLY《M1A2集合开动弹药筒推进器》.pdf_第2页
第2页 / 共11页
NAVY MIL-T-45499 C-1993 THRUSTER CARTRIDGE ACTUATED M1A2 ASSEMBLY《M1A2集合开动弹药筒推进器》.pdf_第3页
第3页 / 共11页
NAVY MIL-T-45499 C-1993 THRUSTER CARTRIDGE ACTUATED M1A2 ASSEMBLY《M1A2集合开动弹药筒推进器》.pdf_第4页
第4页 / 共11页
NAVY MIL-T-45499 C-1993 THRUSTER CARTRIDGE ACTUATED M1A2 ASSEMBLY《M1A2集合开动弹药筒推进器》.pdf_第5页
第5页 / 共11页
点击查看更多>>
资源描述

1、flIL-T-45477C 9Ob 1854488 TLib I INCH-POUND I MIL-T45499C 19 March 1993 SUPERSEDING 20 August 1969 MIL-T-45499B MILITARY SPECIFICATION THRUSTER, CARTRIDGE ACTUATED, Mlk, ASSEMB Y is specijcation is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. Thi

2、s specification covers the requirements for the M1A2 Cartridge Actuated Thruster Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless ot

3、herwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification For MIL-T-4549

4、8 Thruster, Cartridge Actuated, MIA2 Metal Parts Assembly MIL-T-50356 Thruster, Cartridge Actuated, M1A2 Remanufactured Metal Parts Assembly _ Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Com

5、mander, Indian Head Division, Naval Surface Warfare Center, Standardization Branch (Code 8420), 101 Strauss Avenue, Indian Head, MD 20640-5035, by using the Standardization Document Improvement Proposal D Form 1426) appearing at the end of this document or by sending a letter. AMSC NIA FSC 1377 DI!T

6、IRIBTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-T-45499C W 9999906 1854489 982 MIL-T-45499C *. P STANDARDS MILITARY MIL-STD-105 Sampling Procedures And Tables For Insp

7、ection By Attributes MIL-STD- 109 Quality Assurance Terms And Definitions MIL-STD-453 Inspection, Radiographic MIL-STD-1168 Ammunition Lot Numbering MS28741 Hose Assembly, Detachable End Fitting, Medium Pressure (Unless otherwise indicated, copies of federal and military specifications and standards

8、 are available from Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 191 1 1-5094.) 2.1.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise s

9、pecified, the issues are those cited in the solicitation (see 6.2). DRAWINGS Naval Surface Warfare Center, Indian Head (CAGE Codes 19200 and 19203) DL8593854 Thruster, Cartridge Actuated, M1A2 Assembly 8593889 Cartridge, Impulse, M42A 1 Assembly 879763 1 Box, Fiberboard (Inner), Packing, Ammunition,

10、 For Thruster, Cartridge Actuated, M1A2 8797632 Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M1A2 9221261 Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Thruster, Cartridge Actuated, M1A2 U.S. Air Force TPO 00-891-5488 Thruster, Cartridge Actuated, M1A2 (Application for

11、 copies should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Attn: Data Control Branch (Code 8410), Indian Head, MD 20640-5035.) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this d

12、ocument takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-45499C = 999990b I1854490 bT4 MIL-T-45499C

13、A B Components Seating or bottoming (including A) (inch pounds) Run On, min (inch pounds) Head and cartridge retainer 40 300 f 20 Head and body 40 600 f 20 3. REQUIREMENTS 3.1 Materials. All materials used in the manufacture of the thrusters shall conform to the C Breakaway, min (inch pounds) 200 40

14、0 specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders sel

15、ections shall be clearly stated in the proposal. 3.2 Components. 3.2.1 Primary components. For the purpose of this specification, the M42A1 impulse cartridge (Drawing 8593889) is defined as a primary component. Only primary components from a single lot shall be used in a production lot of thrusters;

16、 however, one primary component production lot may be used in more than one thruster production lot. 3.2.2 Component parts. All component parts shall meet the applicable requirements of MIL-T- 45498 or MIL-T-50356 prior to assembly. 3.3 Torque. Torque requirements shall be as specified in table I. N

17、o movement shall occur upon application of the breakaway torque. TABLE I. Toraue reauirements. 3.4 Trunnion rotation. Upon completion of assembly, the trunnion shall be free to rotate 360 degrees. 3.4.1 Structural strength. The assembled thruster shall withstand a static tensile force of 2000 pounds

18、, minimum, for 15 seconds, minimum, between mounting points without unlocking and without mechanical failure (see 6.5.1). 3.4.2 End sleeve rotation. Upon completion of assembly and after the structural strength test, the end sleeve shall be free to rotate 360 degrees in a clockwise direction. 3.5 Re

19、sidual magnetism. The thruster shall not deflect the indicator of the compass more than five degrees in either direction (see 4.3.3). 3.6 Radiographic examination. Each thruster assembly shall be radiographically examined for defects (see 4.3.4). 3 Provided by IHSNot for ResaleNo reproduction or net

20、working permitted without license from IHS-,-,-MIL-T-45499C = 999990b 1854491 530 MIL-T-45499C 3.7 Functional. 3.7.1 Load. The thruster, loaded with an acceptable lot of cartridges and fired under load (see 6.3), shall perform as follows: With the piston connected to a 20-pound weight, the piston sh

21、all push the weight along a horizontal path of travel, and simultaneously the moving piston and weight shall overcome restraining forces of 1000 pounds, 6000 pounds, 3200 pounds, and 1000 pounds, the restraining forces being located from the initial point of travel, a distance of zero inches, 0.25 i

22、nches, 0.40 inches, and 0.75 inches, respectively. After completely overcoming the restraining forces, the piston shall complete its stroke of 2 inches, minimum. 3.7.2 Temperature. The thruster shall comply with all the ballistic requirements throughout the temperature range of -65 to +200“F. 3.7.3

23、Initiation. The thruster shall be fired by a source delivering an output pressure of 700 + 25, - O pounds per square inch gage (psig) at the end of 15 feet of aircraft hose, MS28741-4 at 70 f 5F. 3.7.4 Misfires. There shall be no misfires. 3.7.5 Mechanical failures. The thruster shall function witho

24、ut mechanical failure (see 6.5. i). 3.8 Workmanship. Thrusters shall be free of cracks, splits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3.8.1 Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions,

25、 porosity, or any similar defect. 3.8.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.8.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other f

26、oreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified

27、 in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specifi

28、cation where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements (see 6.2). 4.1.1 Responsibility for compliance. Ali items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the c

29、ontractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the con

30、tract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-45499C 9999906 1854492 477 MIL-T-45499

31、C authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.1.2 Quality assurance terms and definitions. Reference shall be made to MIL-STD-109 to define the quality assurance terms used. 4.1.3 Inspections.

32、Inspections shall be in accordance with MIL-A-2550 and MIL-STD-453. 4.2 Inspection provisions. 4.2.1 Lot. 4.2.1.1 Submission of product. Unless otherwise specified by the contracting activity, formation, and identification of lots shall be in accordance with MIL-STD-105. 4.2.1.2 Size of lot. The pro

33、duction lot size shall be as specified in the contract (see 6.2). 4.2.2 Examination. One hundred percent examination shall be performed for all critical defects. Examination for major and minor defects shall be performed in accordance with the classification of defects. Four power (4x) magnification

34、 may be used for inspection of such defects as burr and foreign matter. When compliance with the applicable requirement is in doubt as a result of visual examination, the characteristic shall be measured or gaged to determine acceptability. All nonconforming material shall be rejected. 4.2.2.1 Cartr

35、idge, Drawing 8593889, covering a detail of Drawing 8593854. Characteristics Defect Method of Inspection Critical 1 Mixed cartridges 2 Metal defective 3 Marking missing, incorrect, or illegible Major 101 Foreign matter present Minor 20 1 Case scratched or dented Visual Visual Visual Visual Visual 4.

36、2.2.2 Firing Pin Guide, Subassembly, consisting of Drawings 8593284,8593863,8593864, and MS28775-O12 covering a detail of Drawing 8593854. Critical 1 Striker hole obstructed 5 Visual Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-45499C 999990

37、b 1854493 303 Major 101 102 MIL-T-45499C Firing pin base not flush or below firing pin guide Foreign matter ManuaWisual Visuai Minor None defined 4.2.2.3 Assembly, (Head), Drawing 8593854 less all components except Drawings 8593284, 8593862, 8593863, 8593864,8593889, 8593870, MS28775-012 and MS28775

38、-212. Critical 1 Cartridge loose or missing Manual /Visual Major 101 Any part missing, except as otherwise classified Visual 102 Thread damaged or not full Visual 1 03 Protective finish inadequate or defective Visual 104 Metal defective Visual 105 Burr Visual 106 Foreign matter Visual Minor None def

39、ined 4.2.2.4 Assembly, Drawing 8593854, less MILC-S501/10 and MILC-5501/11. Critical 1 2 Foreign matter in gas port Shear pin not engaged in firing pin Major 101 Total length 102 Thread damaged Minor 20 1 Sealant or coating compound missing 4.2.2.5 Assembly, Drawing 8593854. Critical 1 Improper asse

40、mbly 2 Any part missing 3 Metal defective Major 101 102 Foreign matter 103 Marking missing, incorrect, or illegible Trunnion not free to rotate 360 degrees Visual Gage Gage Visual Visual Visual/X-ray Visual/X-ray Visual Visual Visual Manual 6 Provided by IHSNot for ResaleNo reproduction or networkin

41、g permitted without license from IHS-,-,-Minor 202 201 203 204 MIL-T-45499C Location of labels incorrect Protective cap or plug missing Total length Varnish missing or inadequate 4.2.2.6 Box, Fiberboard (Inner), Ammunition, Drawing 8797631. Critical None defined Major None defined Minor 20 1 Content

42、s loose 202 Box damaged 203 204 205 Sealing strip broken or missing Marking missing, incorrect, or illegible Cut, damaged, or improperly sealed bag Visual Visual Visual Visual Manual Visual Visual Visual Visual 4.2.2.7 Box, Ammunition, Packing, Drawing 8797632. Critical None defined O Major None def

43、ined Minor 20 1 Contents loose Manual 202 Strapping missing, loose, broken, or improperly engaged Visual/Manual 203 Contents of box exposed Visual 204 Box damaged Visual 205 Marking missing, incorrect, or illegible Visual Number of units incorrect Visual 206 4.2.2.8 Box, Fiberboard (Outer), Alternat

44、ive, Ammunition, Packing, Drawing 9221261. Critical None defined Major None defined Minor 20 1 202 e Contents loose Carton broken or damaged Manuallvisual Visual 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-fl IL - T - 45 4 99C rn 999990b La5449

45、5 LAb rn 203 204 205 MIL-T-45499C Number of units contained incorrect Marking missing, incorrect, or illegible Tape incomplete Visual Visual Visual 4.2.3 Inspection testing. The following tests shall be performed in accordance with 4.3. 4.2.3.1 Breakaway torque. 4.2.3.1.1 Head and cartridge retainer

46、. Each head and cartridge retainer subassembly shall be subjected to a breakaway torque. Failure of any subassembly to comply with the requirements of column C, table I in 3.3 shall be cause for rejection of the subassembly. 4.2.3.1.2 Head and body. Each head and body assembly shall be subjected to

47、a breakaway torque. Failure of any assembly to comply with the requirements of column C, table I in 3.3 shall be cause for rejection of the assembly. 4.2.3.2 Residual magnetism. Each assembly shall be subjected to the test for excessive residual magnetism as specified in 4.3.3. Failure of any unit t

48、o comply with 3.5 shall be cause for rejection of the assembly. 4.2.3.3 Structural strength. Each thruster shall be subjected to the structural strength test. Failure of any unit to comply with the structural strength requirement of 3.4.1 shall be cause for rejection of the thruster. 4.2.3.4 Functio

49、nal tests. The following tests shall be performed by the Government. 4.2.3.4.1 Ballistics. Twenty-one units shall be tested to determine compliance with 3.7. The units shall be temperature conditioned as provided in table II and 4.3.5.2. Failure of any unit to comply with 3.7.1 through 3.7.5 shall be cause for rejection of the lot. TABLE II. ConditioninP temnerature. Sample size Method Temperature (OF) Load (see 3.7.1) -65 to

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1