NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf

上传人:jobexamine331 文档编号:982709 上传时间:2019-03-12 格式:PDF 页数:19 大小:689.54KB
下载 相关 举报
NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf_第1页
第1页 / 共19页
NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf_第2页
第2页 / 共19页
NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf_第3页
第3页 / 共19页
NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf_第4页
第4页 / 共19页
NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf_第5页
第5页 / 共19页
点击查看更多>>
资源描述

1、INCH-POUND MIL-T-46583C 21 September 1992 SUPERSEDING 11 August 1969 MIL-T46583B(MU) MILITARY SPECIFICATION THRUSTER, CARTRIDGE ACTUATED, M3A3 METAL PARTS ASSEMBLY is specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specificatio

2、n covers the requirements for the M3A3 Cartridge Actuated Thruster Metal Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless othe

3、rwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification For STANDARDS MI

4、LITARY MIL-STD-105 MIL-STD-109 MIL-STD-413 Sampling Procedures And Tables For Inspection By Attributes Quality Assurance Terms And Definitions Visual Inspection Guide for Elastomeric O-rings Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in imp

5、roving this document should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Standardization Branch (Code 3730), 101 Strauss Avenue, Indian Head, MD 20640-5035, by using the Standardization Document Improvement Proposal D Form 1426) appearing at the end of this docutne

6、nt or by sending a letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-4b583C W 9999906 LLi90192 041 MIL-T-465 83 C (Unless otherwise indica

7、ted, copies of federal and military specifications and standards are available from Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.1.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this s

8、pecification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS NAVAL ORDNANCE STATION (CAGE Codes 19200 and 19203) 1052263 1 Thruster, Cartridge Actuated, M3A3 Metal Parts Assembly 87967 19 Box, Fiberboard (Inner), Packing,

9、 Ammunition, For Thruster, Cartridge Actuated, M3A3 8797270 Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M3A3 92 17573 Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Thruster, Cartridge Actuated, M3A3 U.S. Air Force TPO 00-953-5567 Thruster, Cartridge Actuated, M3A3 (Ap

10、plication for copies should be addressed to: Commanding Officer, Naval Ordnance Station, Data Control Branch (Code 3720), Indian Head, MD 20640-5035,) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document take

11、s precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to the first article inspection (see 4

12、.3 and 6.3). 3.2 Materials. All materials used in the manufacture of the thrusters shall conform to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufact

13、ure. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.2.1 Raw material, The contractor shall be responsible for selecting from the classification list contained in the raw material specification the su

14、rface and physical condition of the raw material intended for use in manufacture. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-4bS83C m 9999906 1490193 T88 m MIL-T-465 83 C 3.3 Hardness and other physical properties. Hardness and other phy

15、sical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be achieved by quenching and tempering. 3.4 Hydrostatic pressure. The body and end cap shall withstand a hydrostatic pressure of 8, pounds per squar

16、e inch (psi) for 15 seconds, minimum, without leaking, deformation, or mechanical failure (see 6.4.1). 3.5 Structural strength. The assembled thruster shall withstand a static tensile force of 800 pounds, minimum, for 15 seconds, minimum, between mounting points without unlocking and without mechani

17、cal failure (see 6.4.1). 3.6 Shear pin strength. The shear pin, after application of protective finish, shall shear when a load of 41 f 5 pounds is applied at the steady rate of 0.125 inch per minute. 3.7 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requ

18、irements of the metal parts assembly drawing. All threaded joints shall be assembled handtight. 3.8 Protective finish. Protective finish shall be in accordance with the applicable specifications and shall apply to all surfaces of the component regardless of contour configuration. 3.9 Residual magnet

19、ism. The metal parts assembly shall not deflect the indicator of the compass more than five degrees in either direction using procedures in 4.6.6. 3.10 Workmanship. Thrusters shall he free of cracks, splits, or other defects which might prevent - proper mating with connecting parts or proper functio

20、ning ofthe device. 3.10.1 Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions, porosity, or any similar defect. 3.10.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling

21、 the item. 3.10.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other foreign matter. 4. QUALITY ASSURANCE PROVJSIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the pe

22、rformance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disappro

23、ved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements (see 6.2). 3 Provided by IHSNot for ResaleNo reproduction or netwo

24、rking permitted without license from IHS-,-,-MIL-T4583C 4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of a

25、ny inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an ac

26、ceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.1.2 Quality assurance terms and definitions. Reference shall be ma

27、de to MIL-STD-109 to define the quality assurance terms used. 4.1.3 Inspections. Inspections shall be in accordance with MIL-A-2550. 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: a. First article inspection (see 4.4) b. Quality conformance

28、 inspection (see 4.5) 4.3 Inspection conditions. Unless otherwise specified (see 6.2), all inspections shall be performed under the following conditions: a. Temperature: room ambient (68 to 77F) b. Altitude: sea level c. Humidity: 50 percent relative, maximum d. Atmospheric pressure: 14.7 psi 4.4 Fi

29、rst article inspection. At the beginning of regular production, the contractor shall submit an initial production sample to a Government approved facility for evaluation. The sample shall consist of five metal parts assemblies, nine sets of unassembled parts, one set of unassembled parts without pla

30、ting or final protective finish, and fifty shear pins from the same lot of shear pins tested by the contractor. The sample shall be manufactured in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packag

31、ing and packing, must be the same as will be used for regular production and shall be obtained from the same source of supply. After inspection and provisional acceptance at source, the first article sample shall be inspected for all requirements of the drawings and specifications. The Government re

32、serves the right to require new first article samples until an acceptable sample is submitted (see 6.3). 4.5 Quality conformance inspection. 4.5.1 Lot. 4.5.1.1 Submission of product. Unless otherwise specified by the contracting activity, formation and identification of lots shall be in accordance w

33、ith MIL-STD-105. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-465 83 C 4.5.1.2 Size of lot. The production lot size shall be as specified in the contract. 4.5.2 Examination. One hundred percent examination shall be performed for all critic

34、al defects. Examination for major and minor defects shall be performed on a defect basis in accordance with the classification of defects. Four power (4x) magnification may be used in performing visual examination for such defects as burr and foreign matter. Inspection for rubber O-rings shall be in

35、 accordance with MIL-STD-413. When compliance with the applicable requirement is in doubt as a result of visual examination, the characteristic shall be measured or gaged to determine acceptability. All nonconforming material shall be rejected. 4.5.2.1 Rod, Piston, Drawing 8594494, covering a detail

36、 of Drawing 10522631. Characteristics Defect Method of Inspection Critical None defined Major 101 1 02 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 12 1 122 123 124 . 125 126 Concentricity of ring groove with large body diameter Concentricity of body midsection with large

37、body diameter Concentricity of cavity with pilot diameter Concentricity of key locking groove with pilot diameter Concentricity of key escape groove with pilot diameter Concentricity of pilot with large body diameter Concentricity of body at rear of ring groove with large body Diameter of ring groov

38、e Diameter of large body, min Diameter of body of ring groove Diameter of body midsection Diameter of key escape groove, max Diameter of key locking groove, min Diameter of pilot, min Diameter of cavity Depth of cavity, max Length from face, pilot end, to end of key escape groove Length from face, p

39、ilot end, to start of key escape groove Length from face, pilot end, to angle between body and Location of key groove Profile of key groove Profile of ring groove Metal defective Protective finish inadequate or defective Surface finish of pilot, key locking groove, and large Burr or sharp corner For

40、eign matter diameter midsection, min body improper Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Visual Visual Visual visual Visual 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Mino

41、r 20 1 202 203 204 205 206 207 208 209 2 10 211 2 12 213 MIL-T-46583C Diameter of large body, max Diameter of key escape groove, min Diameter of key locking groove, max Diameter of pilot, max Depth of cavity, min Length of pilot Length from face, pilot end, to start of large body diameter, max Total

42、 length Location of ring groove Width of ring groove Marking missing, incorrect, or illegible Radius, chamfer, or both, missing or incorrect Surface finish improper, except as otherwise classified Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Visual visual Visual 4.5.2.2 Breech, Assembly, Drawin

43、g 8594496, covering a detail of Drawing 10522631. Cri t ical 1 Major 101 102 103 104 105 106 107 108 1 o9 110 111 112 113 114 115 116 117 118 119 Surface finish of cavity improper Pitch diameter of large external thread, min Major diameter of large external thread, min Pitch diameter of small extern

44、al thread, min Major diameter of small external thread, min Pitch diameter of internal thread, max Minor diameter of internal thread, max Pitch diameter of pin hole thread, rnax Minor diameter of pin hole thread, max Concentricity of boss cavity with cavity Concentricity of striker hole with cavity

45、Concentricity of pitch diameter of small external thread Concentricity of body with pitch diameter of large external Concentricity of pitch diameter of small external thread Perpendicularity of boss face with pitch diameter of small Perpendicularity of shoulder with pitch diameter of large Protrusio

46、n of pellets above major diameter of large Protrusion of pellets above major diameter of small True position of pin hole Diameter of cavity, rnax with cavity thread with pitch diameter of large external thread external thread external thread thread, max thread, rnax Gage Gage Gage Gage Gage Gage Gag

47、e Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage Gage 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I c MIL-T-4b583C m 99999Ob L49OL97 b23 m MIL-T4583C 120 12 1 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139

48、Minor 20 1 202 203 204 205 206 207 208 209 210 21 1 212 213 2 14 215 216 217 218 219 220 22 1 222 223 224 225 226 Diameter of basic location Diameter of pin hole, max Depth of counterbore Depth of thread cavity Length of effective internal thread, min Length of internal thread, max Angle at basic di

49、ameter Height of boss Diameter of chamfer, thread Width of undercut, small external thread, rnax Width of undercut, large external thread, max Angle at mouth of thread cavity Radius at root of boss Thread damaged or not full Metal defective Protective finish inadequate or defective Pellet missing, loose, or improperly inserted Surface finish of internal thread and mouth chamfer Burr or sharp corner Foreign matter Pitch diameter large external thread, max Pitc

展开阅读全文
相关资源
猜你喜欢
  • ASTM D4833 D4833M-2007(2013)e1 Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products《土工膜和相关产品指数穿刺阻力的标准试验方法》.pdf ASTM D4833 D4833M-2007(2013)e1 Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products《土工膜和相关产品指数穿刺阻力的标准试验方法》.pdf
  • ASTM D4833-2000e1 Standard Test Method for Index Puncture Resistance of Geotextiles Geomembranes and Related Products《土工织物、地膜及其有关制品的抗击穿系数的标准试验方法》.pdf ASTM D4833-2000e1 Standard Test Method for Index Puncture Resistance of Geotextiles Geomembranes and Related Products《土工织物、地膜及其有关制品的抗击穿系数的标准试验方法》.pdf
  • ASTM D4833-2007 Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products《土工膜及其有关制品的抗击穿系数的标准试验方法》.pdf ASTM D4833-2007 Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products《土工膜及其有关制品的抗击穿系数的标准试验方法》.pdf
  • ASTM D4834-2003 Standard Test Method for Detection of Lead in Paint by Direct Aspiration Atomic Absorption Spectroscopy《用直接吸气原子吸收光谱法检测涂料中铅的标准试验方法》.pdf ASTM D4834-2003 Standard Test Method for Detection of Lead in Paint by Direct Aspiration Atomic Absorption Spectroscopy《用直接吸气原子吸收光谱法检测涂料中铅的标准试验方法》.pdf
  • ASTM D4834-2003(2008) Standard Test Method for Detection of Lead in Paint by Direct Aspiration Atomic Absorption Spectroscopy《用直接吸气的原子吸收光谱法测定涂料中铅的标准试验方法》.pdf ASTM D4834-2003(2008) Standard Test Method for Detection of Lead in Paint by Direct Aspiration Atomic Absorption Spectroscopy《用直接吸气的原子吸收光谱法测定涂料中铅的标准试验方法》.pdf
  • ASTM D4834-2003(2014) Standard Test Method for Detection of Lead in Paint by Direct Aspiration Atomic Absorption Spectroscopy《用直接吸气的原子吸收光谱法测定涂料中铅的标准试验方法》.pdf ASTM D4834-2003(2014) Standard Test Method for Detection of Lead in Paint by Direct Aspiration Atomic Absorption Spectroscopy《用直接吸气的原子吸收光谱法测定涂料中铅的标准试验方法》.pdf
  • ASTM D4835-2003 Standard Specification for Propylene Glycol Monomethyl Ether Acetate《丙二醇单甲醚乙酸酯标准规范》.pdf ASTM D4835-2003 Standard Specification for Propylene Glycol Monomethyl Ether Acetate《丙二醇单甲醚乙酸酯标准规范》.pdf
  • ASTM D4835-2008 Standard Specification for Propylene Glycol Monomethyl Ether Acetate《丙二醇甲醚醋酸酯标准规范》.pdf ASTM D4835-2008 Standard Specification for Propylene Glycol Monomethyl Ether Acetate《丙二醇甲醚醋酸酯标准规范》.pdf
  • ASTM D4835-2008(2012) Standard Specification for Propylene Glycol Monomethyl Ether Acetate《丙二醇单甲醚乙酸酯标准规格》.pdf ASTM D4835-2008(2012) Standard Specification for Propylene Glycol Monomethyl Ether Acetate《丙二醇单甲醚乙酸酯标准规格》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1